View allAll Photos Tagged GCS

Steered through the site in Plymouth by TCS.

Photograph from Douglas Aircraft Co. Reverse caption: "Floor grid ready for delivery."

Photograph from Douglas Aircraft Co. Reverse caption: "A final inspection of a machined panel."

Technician installing plenums for the environmental control systems.

Floor support bean structure being painted.

Forward half of mockup being leveled prior to load testing of floor platform.

Technicians installing aluminum liner after adhesive has been applied.

Photograph from Douglas Aircraft Co. Reverse caption: "Upon completion of profiling, machinist removes floor grid for inspection and approval."

Photograph from Douglas Aircraft Co. Reverse caption: "Prefitting of floor grid sections performed at Douglas Missile & Space Systems Division, Santa Monica, California, prior to delivery to Douglas Space Systems Center."

Seen on the M4 near Reading.

Photos taken during the 2017 GVVT open weekend.

Photograph from Douglas Aircraft Co. Reverse caption: "Close up view showing floor grid sections following prefitting and assembly."

Forward half of mockup being lowered onto floor grid platform.

Forward half of mockup being leveled prior to load testing of floor platform.

My respects to the Queen MUM ;)

From December's Cars & Coffee at Cafe Bella.

Grant Central Station

Pictured from left to right; Nick Welfare, Theo Babisha, Corrie Cloninger, Ben Parker, Coach Mike Robinson, Henry Sorrell, Grant Carter, Axe Shen, Coach Steve Matolka, Josie Cloninger, Tom Hawxwell, Athletic Director. Not pictured: Brandon Roche, Samuel Ellington, Nicolas Cochran.

Magical Mountain Resort. NC. March 29th 2023.

1 2 4 6 7 ••• 79 80