View allAll Photos Tagged Flow

 

x flow oil cooler take off

I plant on the terrace, mute friend

Valve shafts, Loch Treig

 

These valves control flow through the tunnel to Lochaber Smelter at Fort William from Loch Loch Treig.

 

NN 3432 76011

 

The narrow gauge railway ran on the embankment loop in front of the Valve Shaft enclosure.

 

More information in 'The Puggy Line - The Lochaber Narrow Gauge Railway' by Patrick Howat ISBN 978-0-9554326-0-6

 

Lochaber Hydro-Electric Station

www.gracesguide.co.uk/Lochaber_Hydro-Electric_Station

 

British Aluminium Co

www.gracesguide.co.uk/British_Aluminium_Co

  

After experimenting with shutter speed, i ended up with this....if only i had and= ND filter, it would have been even more silkier....but nevertheless better than nothing

Headed down to the Royal National Park this morning with Mike, Ash and Jeff for a Southdside FOCUS shoot. Thanks to Mike for showing us a great location.

My first trip to a sunflower field in Ohio.

Aniversari Astro 34

Flow Festival 2018

Saturday 11.08.2018

(C) Petri Anttila

Om de boomgaarden en wijngaarden rond Merano van water te voorzien, zijn er al eeuwen geleden in de omgeving kanaaltjes aangelegd. Deze belletjes zijn een onderdeel van dit irrigatiesysteem. Zolang er water stroomt, klinkt de bel, maar als ergens onderweg het water stagneert, verstomt de bel en weet de eigenaar van dat stuk van het kanaaltje dat hij er iets aan moet doen. De paden langs de kanalen ('Waalwege') zijn ideaal voor wandelingen.

 

To irrigate the orchards and vineyards around Merano, a system of water courses has been developed that goes back centuries. These bells are part of that system. As long as the water flows, the bell sounds. When there is an obstruction along the way, the bell falls silent and the owner of that part of the channel knows he should go and fix it. Nowadays the paths along the channels ('Waalwege') are great for walks.

Cher Beauf des Villes

 

bien à toi

Miike Snow

Flow Festival / Friday 10.8.

Could not stop watching at the drops falling down from the nuzzle. Do you see what I see?

The #cash #flow #statement #preparation involves similar steps to finalize such a #statement. You may found slightly different features, however; the structure and main parts are uniforms across the globe. Let us provide you with some basic information about the three necessary parts of any such #statement

 

This transposed onto a pentagon.

The tube indicator allows a 360 deg visual indication of the flow and contents in the pipes. It has a plain straight through borosilicate glass tube with stainless steel flanged ends and is used to check for the presence of a liquid where there is intermittent flow, partially filled lines or entrained air.

 

More info on:

www.arkon.co.uk/en/products/tubeflowindicator

 

El indicador de flujo de tubo permite una inspección visual con una perspectiva de 360 grados del flujo y contenido de una tubería Consiste en un tubo transparente de borosilicato terminado en bridas de acero inoxidable. Se usa para comprobar la presencia de líquidos especialmente en aplicaciones con flujos intermitentes, tuberías semivacías o con riesgo de entrada de aire.

 

Más información en:

www.arkon.co.uk/en/products/tubeflowindicator

The FloWav sensor will help monitor the amount of water travelling through the pipe into a nearby stream.

#Cash #flow #statement #preparation is an integral and important part of financial management. There is an alternate name for such #statement as well, and that is, #statement of cash flows.

Flow control chambers are designed and manufactured to be fit for purpose, saving on on-site time and costs

 

For further information please call 01179 814500, email offsite@marshalls.co.uk or visit www.marshalls.co.uk/commercial/civils-and-drainage/water-...

1 2 ••• 59 60 62 64 65 ••• 79 80