View allAll Photos Tagged DataCenter

Pentium II, for all of your hardcore processing needs.

Citycom Eröffung Datacenter Nord

Glass staircase - TASC II

Battery Units, weight 200 Kg each.

Citycom Eröffung Datacenter Nord

Pre action fire suppression system.

Commercial airplane flights generate 1TB of data. There are 28,537 flights a day, generating 17,094 Petabytes of data every day. QLogic has the solution.

HP Canada Data Center Event @ Real Sports, Toronto - May 9th, 2012

www8.hp.com/us/en/business-services/it-services.html?comp...

 

Citycom Eröffung Datacenter Nord

File Name : DSCN1187.JPG.

File Size : 387.9KB (397250 Bytes).

Date Taken : 2002/09/21 13:06:16.

Image Size : 2048 x 1536 pixels.

Resolution : 300 x 300 dpi.

Bit Depth : 8 bits/channel.

Protection Attribute : Off.

Hide Attribute : Off.

Camera ID : N/A.

Camera : E995.

Quality Mode : BASIC.

Metering Mode : Matrix.

Exposure Mode : Programmed Auto.

Speed Light : No.

Focal Length : 8.2 mm.

Shutter Speed : 1/6 second.

Aperture : F2.6.

Exposure Compensation : 0 EV.

White Balance : Auto.

Lens : Built-in.

Flash Sync Mode : N/A.

Exposure Difference : N/A.

Flexible Program : N/A.

Sensitivity : Auto.

Sharpening : Auto.

Image Type : Color.

Color Mode : N/A.

Hue Adjustment : N/A.

Saturation Control : Normal.

Tone Compensation : Auto.

Latitude(GPS) : N/A.

Longitude(GPS) : N/A.

Altitude(GPS) : N/A

Citycom Eröffung Datacenter Nord

HP Canada Data Center Event @ Real Sports, Toronto - May 9th, 2012

www8.hp.com/us/en/business-services/it-services.html?comp...

 

Emerson Network Power had a substantial presence on the exhibit floor at the Gartner Data Center Conference at the MGM Grand in Las Vegas.

Small part of Fortress' power system, this I believe is an ATS

one of multiple battery backup farms @ worky

RDC, network rack, three empty racks, four Michielssen racks

Citycom Eröffung Datacenter Nord

1 2 ••• 55 56 58 60 61 ••• 79 80