View allAll Photos Tagged DataCenter

Pre action fire suppression system.

Commercial airplane flights generate 1TB of data. There are 28,537 flights a day, generating 17,094 Petabytes of data every day. QLogic has the solution.

Citycom Eröffung Datacenter Nord

File Name : DSCN1187.JPG.

File Size : 387.9KB (397250 Bytes).

Date Taken : 2002/09/21 13:06:16.

Image Size : 2048 x 1536 pixels.

Resolution : 300 x 300 dpi.

Bit Depth : 8 bits/channel.

Protection Attribute : Off.

Hide Attribute : Off.

Camera ID : N/A.

Camera : E995.

Quality Mode : BASIC.

Metering Mode : Matrix.

Exposure Mode : Programmed Auto.

Speed Light : No.

Focal Length : 8.2 mm.

Shutter Speed : 1/6 second.

Aperture : F2.6.

Exposure Compensation : 0 EV.

White Balance : Auto.

Lens : Built-in.

Flash Sync Mode : N/A.

Exposure Difference : N/A.

Flexible Program : N/A.

Sensitivity : Auto.

Sharpening : Auto.

Image Type : Color.

Color Mode : N/A.

Hue Adjustment : N/A.

Saturation Control : Normal.

Tone Compensation : Auto.

Latitude(GPS) : N/A.

Longitude(GPS) : N/A.

Altitude(GPS) : N/A

Citycom Eröffung Datacenter Nord

HP Canada Data Center Event @ Real Sports, Toronto - May 9th, 2012

www8.hp.com/us/en/business-services/it-services.html?comp...

 

Emerson Network Power had a substantial presence on the exhibit floor at the Gartner Data Center Conference at the MGM Grand in Las Vegas.

Small part of Fortress' power system, this I believe is an ATS

one of multiple battery backup farms @ worky

RDC, network rack, three empty racks, four Michielssen racks

Citycom Eröffung Datacenter Nord

Servers are purchased, configured and setup per the requirements of each customer.

HP Canada Data Center Event @ Real Sports, Toronto - May 9th, 2012

www8.hp.com/us/en/business-services/it-services.html?comp...

 

The main Comverse sign located over Comverse's office entrance.

The Weight of the Cloud

 

Description

 

A cinematic documentary-style visual series exploring the hidden physical world behind digital infrastructure. Across storm-darkened rural landscapes, muddy construction sites, substations, server halls, delivery routes, public meetings, and community spaces, the images portray the tension between technological progress and the human, environmental, and territorial realities that support it.

 

The collection contrasts the clean precision of data centers, power grids, pipelines, and industrial architecture with the rough emotional texture of workers, landowners, engineers, citizens, and younger generations facing a future shaped by energy demand and digital expansion. Dramatic skies, wet roads, heavy machinery, orange safety clothing, reflective surfaces, and muted industrial tones create a realistic atmosphere of uncertainty, scale, and transformation.

 

This is a visual essay about the cloud becoming visible: not as something weightless, but as concrete, steel, electricity, land, labor, logistics, and public debate.

 

The images have been generated by Artificial Intelligence.

Citycom Eröffung Datacenter Nord

1 2 ••• 54 55 57 59 60 ••• 79 80