View allAll Photos Tagged ConstructionUpdate
The construction of the housing estate “Severnoye Siyaniye” consisting of 3 apartment buildings with a height of 32, 37 and 42 floors is being actively continued.
The construction of 42-floored building (Spot 2) has drawn to a close. The skeleton of building, walls and dividing walls, and a roof are fully completed and external utility systems are installed. The face of building (99% is ready) and internal premises will be completed soon; 95% of the internal utility systems have already installed.
Construction continues on the academic and housing buildings on the campus of Nevada State College on Friday, February 7, 2020.
Продолжаются работы на строительных площадках жилого комплекса "Северное сияние". Завершается строительство 42-этажного здания (пятно 2), близятся к завершению работы по оттедке фасада и возведению стен и пререгородок 37 этажного здания (пятно 3), продолжается возведение каркаса и фасада 32-этажного здания (пятно 1).
The construction of the housing estate “Severnoye Siyaniye” consisting of 3 apartment buildings with a height of 32, 37 and 42 floors is being actively continued.
The construction of 42-floored building (Spot 2) has drawn to a close. The skeleton of building, walls and dividing walls, and a roof are fully completed and external utility systems are installed. The face of building (99% is ready) and internal premises will be completed soon; 95% of the internal utility systems have already installed.