The construction of the housing estate “Severnoye Siyaniye” consisting of 3 apartment buildings with a height of 32, 37 and 42 floors is being actively continued.

The construction of 42-floored building (Spot 2) has drawn to a close. The skeleton of building, walls and dividing walls, and a roof are fully completed and external utility systems are installed. The face of building (99% is ready) and internal premises will be completed soon; 95% of the internal utility systems have already installed.

 

The skeleton and roof coating of 37-floored building (Spot 3) are fully completed. 95% of the face, walls and dividing walls are completed and 65% of internal utility systems are installed.

The skeleton of 32-floored building is completed at the height of 11 floor (Spot 1); the face of building is completed at the height of 6 floor.

 

The degree of completion of 2-floored platform is as follows: skeleton – 95%, face – 60%, roof coating 30%, walls and dividing walls – 75%, internal utility systems – 30%.

Opgestapeld buis- en stafmateriaal, opgeslagen in een open stelling naast de bouwketen.

Verschillende diameters, lengtes en afwerkingen liggen naast elkaar te wachten op hun bestemming in het gebouw.

Het licht strijkt langs het metaal en maakt van voorraad een ritme van cirkels, lijnen en reflecties.

Een stil moment tussen levering en verwerking.

 

🇬🇧 Stacks of pipe and rod material, stored in an open rack next to the site cabins.

Different diameters, lengths and finishes lie side by side, waiting to be used in the building.

Light glides across the metal, turning stock into a rhythm of circles, lines and reflections.

A quiet moment between delivery and application.

The Meridian Sector 89 Gurugram - Construction update

#ConstructionUpdate #MRGWorld #TheMeridian

Our pace to complete the construction of your dream home is even faster in 2021 and we are ahead of schedule, for your convenience.

 

#MRGWorld #ConstructionUpdate #TheMeridian #AffordableHousing #ValueHomes #RealEstate #StayHomeStaySafe

Bruce T. Martin Photography.

508-655-7557.

btm@brucetmartin.com.

154 East Central St.

Natick MA 01760

The construction of the housing estate “Severnoye Siyaniye” consisting of 3 apartment buildings with a height of 32, 37 and 42 floors is being actively continued.

The construction of 42-floored building (Spot 2) has drawn to a close. The skeleton of building, walls and dividing walls, and a roof are fully completed and external utility systems are installed. The face of building (99% is ready) and internal premises will be completed soon; 95% of the internal utility systems have already installed.

 

The skeleton and roof coating of 37-floored building (Spot 3) are fully completed. 95% of the face, walls and dividing walls are completed and 65% of internal utility systems are installed.

The skeleton of 32-floored building is completed at the height of 11 floor (Spot 1); the face of building is completed at the height of 6 floor.

 

The degree of completion of 2-floored platform is as follows: skeleton – 95%, face – 60%, roof coating 30%, walls and dividing walls – 75%, internal utility systems – 30%.

The construction of the housing estate “Severnoye Siyaniye” consisting of 3 apartment buildings with a height of 32, 37 and 42 floors is being actively continued.

The construction of 42-floored building (Spot 2) has drawn to a close. The skeleton of building, walls and dividing walls, and a roof are fully completed and external utility systems are installed. The face of building (99% is ready) and internal premises will be completed soon; 95% of the internal utility systems have already installed.

 

The skeleton and roof coating of 37-floored building (Spot 3) are fully completed. 95% of the face, walls and dividing walls are completed and 65% of internal utility systems are installed.

The skeleton of 32-floored building is completed at the height of 11 floor (Spot 1); the face of building is completed at the height of 6 floor.

 

The degree of completion of 2-floored platform is as follows: skeleton – 95%, face – 60%, roof coating 30%, walls and dividing walls – 75%, internal utility systems – 30%.

The construction of the housing estate “Severnoye Siyaniye” consisting of 3 apartment buildings with a height of 32, 37 and 42 floors is being actively continued.

The construction of 42-floored building (Spot 2) has drawn to a close. The skeleton of building, walls and dividing walls, and a roof are fully completed and external utility systems are installed. The face of building (99% is ready) and internal premises will be completed soon; 95% of the internal utility systems have already installed.

 

The skeleton and roof coating of 37-floored building (Spot 3) are fully completed. 95% of the face, walls and dividing walls are completed and 65% of internal utility systems are installed.

The skeleton of 32-floored building is completed at the height of 11 floor (Spot 1); the face of building is completed at the height of 6 floor.

 

The degree of completion of 2-floored platform is as follows: skeleton – 95%, face – 60%, roof coating 30%, walls and dividing walls – 75%, internal utility systems – 30%.

This is the world under a new road. Stearns Rd - Crocker extension. HDR of 3 images +- 2/3. Not crazy about the leaf that's there, but I could not see what was down there when I shot it.

 

Must view here to get the whole effect:

View On Black

 

www.cuyctyengineers.org/construction updates/Constructionupdates crocker Stearns Rd2007. .html