View allAll Photos Tagged ConstructionProjects

Scheduled for the summer of 2011, this two-phase fast-track project will restore four parking garages on the campus of the Norfolk, Virginia-based school.

 

For more information, visit us at www.TeamACP.com.

Two planks with "tongues" screwed down along just one edge.

*Flex fence*

Fencing made specifically for the equine industry that provides a strong barrier, with the added safety of flexing on impact, very low maintenance, strong break strength, long life and high visibility...We suggest flex fence. Our many satisfied customers prove the functionality and quality of this rail!

CALL TODAY!! 1-800-852-1611 or Visit Our Website at www.rammfence.com

a lot of #5 (5/8 ") re-bar

This is the way I left it for the winter.

*Flex fence*

Fencing made specifically for the equine industry that provides a strong barrier, with the added safety of flexing on impact, very low maintenance, strong break strength, long life and high visibility...We suggest flex fence. Our many satisfied customers prove the functionality and quality of this rail!

CALL TODAY!! 1-800-852-1611 or Visit Our Website at www.rammfence.com

One section of main is lowered into the trench suspended from a tractor arm.

*Flex fence*

Fencing made specifically for the equine industry that provides a strong barrier, with the added safety of flexing on impact, very low maintenance, strong break strength, long life and high visibility...We suggest flex fence. Our many satisfied customers prove the functionality and quality of this rail!

CALL TODAY!! 1-800-852-1611 or Visit Our Website at www.rammfence.com

"New Loo", new composting toilet, got a shingled roof.

*Flex fence*

Fencing made specifically for the equine industry that provides a strong barrier, with the added safety of flexing on impact, very low maintenance, strong break strength, long life and high visibility...We suggest flex fence. Our many satisfied customers prove the functionality and quality of this rail!

CALL TODAY!! 1-800-852-1611 or Visit Our Website at www.rammfence.com

Sections of water main that were laid today were covered with gravel fill and then capped with asphalt.

1 2 ••• 26 27 29 31 32 ••• 79 80