View allAll Photos Tagged CivilEngineering
This is a 3D model of the Four Lane Ends Interchange. It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7/D4074
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
(Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Poids en ordre de marche : 22 100 kg
Construction de l'ensemble immobilier L'Essenciel comprenant 109 logements et 2 niveaux de parking sous terrain dans la ZAC Nancy Grand Coeur.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 11-13, boulevard de l'Insurrection du Ghetto de Varsovie
Fonction : Logements
Construction : 2018 → 2019
► Architecte : GD'A Groupement d'Architectes
PC n° 54 395 16 R0020 délivré le 02/08/2016
Niveaux : R+7
Hauteur : 23.10 m
Surface de plancher : 7 400 m²
Surface du terrain : 2 403 m²
This is a plan of the Regent Centre Metro Station Multi-story car park.
It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
(Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
Construction d'un parc de stationnement de 377 places et restructuration du pont des Fusillés dans la ZAC Nancy Grand Coeur.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : boulevard Joffre
Fonction : Parking
Construction : 2016 → 2019
• Architecte : Cabinet Beal et Blanckaert
• Gros œuvre : Eiffage Construction Lorraine
Permis d'aménager n° 54 395 15 00001 délivré le 21 décembre 2015
Superficie du terrain : 6 092 m²
Superficie de l'ouvrage à démolir : 1 666 m²
This is a plan of the Regent Centre Multi-storey car park. It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7/D3987
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
Water in the hydrodynamics lab in the Hammond Building at Penn State, where we tested the aerodynamics of our scale model concrete canoe.
Latest in my shots of the recording of the new Forth Crossing or Queensferry Crossing as it will be called. Coming on now.
Sara Raines carefully adds sand to the bucket suspended under her Civil Engineering 101 team's spaghetti bridge. Her team's bridge supported the most weight in the competition, 20.98 pounds. Photo by Robert Jordan/Ole Miss Communications
Travaux de voirie avenue de la Liberté en vue de la réalisation d'une portion du tramway de Luxembourg-Ville.
Pays : Luxembourg🇱🇺
Ville : Luxembourg Ville
Quartier : Gare
Adresse : avenue de la Liberté
Génie civil : Karp-Kneip / Sopinor
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
A report that recommends steps to reduce hurricane damage in New Orleans was released today by an expert engineering panel of the American Society of Civil Engineers (ASCE). The 84-page report, “The New Orleans Hurricane Protection System: What Went Wrong and Why,” targets the public and policymakers, and complements and synthesizes the thousands of pages released so far by the U.S. Army Corps of Engineers during their post-Katrina investigation. Dr. Robert Gilbert, the risk expert on the ASCE panel and a civil engineering professor at The University of Texas at Austin, noted that their risk analysis confirms the vulnerable nature of the city’s hurricane protection system.
View of Reading Station platforms 7 (on the right) and 8 (left of the photo), which were previously platforns 4 and 5, and looking towards London. Part of the old walkway between the car park on the north side to the south side of the station is still in place.
Pelleteuse à bord du ROCKPIPER.
Type : Pipe Burying Vessel
Pavillon : Chypre 🇨🇾
Chantier naval : Keppel Singmarine (Singapour 🇸🇬)
Lancement : 2012
Identification (IMO number) : 9583861
Longueur : 158,6 m
Largeur : 36 m
Tonnage : 30 601 tjb
The UK's longest road tunnel and a new section of dual carriageway on the A3 near Hindhead in Surrey.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
This is a plan of the Four Lane Ends Interchange. It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
(Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
Poids en ordre de marche : 15 900 kg
Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : viaduc Kennedy
CSU's ASCE Concrete Canoe Team hosts the Rocky Mountain Regional competition at Horsetooth Reservoir. April 5, 2014
Dernière tranche de l'aménagement du contournement de Malzéville entre la rue Pasteur et le viaduc Louis Marin.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Villes : Malzéville (54220) / Saint-Max (54130)
Durée des travaux : 2020 → 2021
Inauguration : 18/12/2021
Window dummy frames
This image is part of the CalVisual for Construction Image Archive. For more information visit www.engsc.ac.uk/resources/calvisual/index.asp
Author: Loughborough University
Sometimes the bridges fail slowly, sagging under the weight as spaghetti breaks and falls piece by piece. Photo by Robert Jordan/Ole Miss Communications
Comments always appreciated, as long as you keep it clean - I love to hear your feedback! xx
I went for a visit to Derby for their comedy festival and to spend the weekend with Gemma.
Saturday morning we went to Belper to the river gardens and the horseshoe weir, which is an incredible piece of civil engineering!
The gardens are lovely and tranquil. It was a great little alternative to our usual trip to Dovedale - which we called off because the weather wasn't great.
Had a lovely morning though!
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Poids en ordre de marche : 18 000 - 20 000 kg
Travaux ferroviaire entre Baccarat et Saint-Dié-des-Vosges.
Travaux sur le réseau d'eau potable boulevard Charlemagne à Nancy.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Ouest
Adresse : boulevard Charlemagne
Durée des travaux : janvier 2025 → mars 2025
Poids en ordre de marche : 109 400 - 131 600 kg
Hauteur de travail : 41 m
Déconstruction de la Tour de la cité administrative à Colmar.
Pays : France 🇫🇷
Région : Grand Est (Alsace)
Département : Haut-Rhin (68)
Ville : Colmar (68000)
Quartier : Saint-Léon
Adresse : rue Fleischhauer
Fonction : Administration
Construction : ≈1970
Déconstruction : 2024
Niveaux : R+13
Hauteur : 45,00 m