View allAll Photos Tagged CivilEngineering
This is a 3D model of the Four Lane Ends Interchange. It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7/D4074
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
(Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
Latest in my shots of the recording of the new Forth Crossing or Queensferry Crossing as it will be called. Coming on now.
This is a plan of the Regent Centre Metro Station Multi-story car park.
It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
(Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
This is a plan of the Regent Centre Multi-storey car park. It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7/D3987
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Sara Raines carefully adds sand to the bucket suspended under her Civil Engineering 101 team's spaghetti bridge. Her team's bridge supported the most weight in the competition, 20.98 pounds. Photo by Robert Jordan/Ole Miss Communications
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
A report that recommends steps to reduce hurricane damage in New Orleans was released today by an expert engineering panel of the American Society of Civil Engineers (ASCE). The 84-page report, “The New Orleans Hurricane Protection System: What Went Wrong and Why,” targets the public and policymakers, and complements and synthesizes the thousands of pages released so far by the U.S. Army Corps of Engineers during their post-Katrina investigation. Dr. Robert Gilbert, the risk expert on the ASCE panel and a civil engineering professor at The University of Texas at Austin, noted that their risk analysis confirms the vulnerable nature of the city’s hurricane protection system.
Construction de 32 logements collectifs, réhabilitation d'un immeuble en 6 logements individuels de fonction et construction de 4 maisons individuelles de fonction.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : avenue du Maréchal Juin
Fonction : Logements
Construction : 2025 → 2026
▻ Architecte : Bagard & Luron Architectes
Permis de construire n° PC 54 395 24 00017
▻ Délivré le 01/08/2024
Hauteur : 22,91 m
Superficie du terrain : 6 745 m²
Near Boulder City, Nevada
Constructed 1931-1935
In 1918, the U.S. Reclamation Service's director and chief engineer Arthur P. Davis proposed a dam of unprecedented height to control the devastating floods on the Colorado River, generate hydroelectric power, and store the river's ample waters for irrigation and other uses. A dam project of this monumental scale had never been built in America: diverting the Colorado River through four massive tunnels blasted out of hard rock; pouring 6.6 million tons of concrete to build the world's largest concrete dam; and building two giant spillways and four intake towers - all in a remote desert region.
In March 1931, the Bureau of Reclamation awarded the contract to a consortium of six large construction firms, called Six Companies, Inc., that bid together on the project because it was larger than any one could handle. Francis T. Crowe, Hon.M.ASCE was construction superintendent for Six Companies, Inc. and probably one of the premier dam construction engineers who ever worked in the United States. Working around the clock, they completed the dam two years ahead of schedule.
Facts
- Four 56-foot-diameter tunnels were driven through the canyon walls - 2 on either side - to divert the Colorado River around the dam work site. Ultimately, more than 1,500,000 cubic yards of soil and rock were removed from the tunnels.
- The dam is an arch gravity structure rising 726 feet above bedrock. It is 660 feet thick at its base, 45 feet thick at its crest, and stretches 1,244 feet across Black Canyon.
- Construction of the dam, powerhouse, and related structures required a total of 4,400,000 cubic yards of concrete, 45,000,000 pounds of reinforcing steel. The size of much of the equipment - including generators and steel plate penstock - was unparalleled.
To dissipate the heat generated as the concrete cured, over 650 miles of one-inch pipe were embedded in the concrete to convey refrigerated water. The cooling coils were cut off and filled with grout after each block had cured and cooled.
- On Septermber 30, 1935, Franklin D. Roosevelt officially dedicated the dam, saying, "I came, I saw, and I was conquered, as everyone will be who sees for the first time this great feat of mankind."
- The inscription at the base of the Hoover Dam flagpole reads, "It is fitting that the flag of our country should fly here in honor of those men who, inspired by a vision of lonely lands made fruitful, conceived this great work and of those others whose genius and labor made that vision a reality."
Resources
- Joseph Stevens, Hoover Dam: An American Adventure, University of Oklahoma Press (1988)
- PBS American Experience, Hoover Dam, video
- Patty Sullivan, A Pictorial History of Hoover Dam, Draco Publishing (1999)
For more information on civil engineering history, go to www.asce.org/history.
The UK's longest road tunnel and a new section of dual carriageway on the A3 near Hindhead in Surrey.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
This is a plan of the Four Lane Ends Interchange. It was taken from the ‘Ainsworth Spark Photo File.’ Compiled between the 8th of December 1975 to the 12th of May 1977 it consists of artist's impressions, tender drawings, photographs of 3 dimensional models and plans relating to various Metro projects. Ainsworth Spark were Newcastle based Architects.
The file is taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
Reference no. DT.MHA/7
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
(Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Portes ouvertes à la Carrière de Trapp de Raon-l'Étape lors des Journées européennes du patrimoine 2023.
Poids en ordre de marche : 104 500 kg
Capacité du godet : 10 - 14 m³
Window dummy frames
This image is part of the CalVisual for Construction Image Archive. For more information visit www.engsc.ac.uk/resources/calvisual/index.asp
Author: Loughborough University
From copies of original maps from 1854, Crowley and Denny calculated the mound locations by using a United States Geological Survey digital quad sheet as a reference. They took their calculations to the field, following a hand-held GPS to locate several mounds
The Coastal Carolina University Softball and Baseball Complex project by Goodwyn, Mills and Cawood consists of demolition and replacement of the current stadium in an effort to achieve the Chanticleer program’s goal of providing top-rate facilities for student athletes that emulate the “Coastal” feeling.
Improvements include new team facilities, recessed dugouts, 2,500-spectator seating capacity, restrooms, full-service concessions, novelty sales area, press box with work space for media personnel, premium box and suite areas, clubhouse and locker room for athletes along with coaches and umpires and potential upgrades to the lights, scoreboard and existing landscape.
This facility was designed in collaboration with Populous.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Poids en ordre de marche : 17 600 - 20 600 kg
Chantier de modernisation de l'échangeur de Pontpierre sur l'autoroute A4 dans le cadre du projet GRIDX.
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.
Construction d'un bâtiment à usage de commerce.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Villes : Houdemont (54180) / Heillecourt (54180)
Adresse : rue du Coteau
Fonction : Commerces
Construction : 2023
The City of Hoover has seen enormous growth in its sports programs over the past 10 years and needed a new complex that would fulfill their existing needs, allow for growth and give the City the ability to create new revenue streams and take advantage of sports tourism by hosting large tournament events. Hoover had not built any new athletic facilities in 15 years. At the same time the City’s sports participation had increased by multiples of 200% - 500% depending on the sport. The growth was caused by increases in both youth and adult sports leagues, as well as the relatively recent popularity of additional sports.
The multi-purpose Finley Center, which connects to the existing Hoover Met baseball stadium with a covered walkway, is able to accommodate a full-size football or soccer field, nine regulation-size basketball courts, 12 regulation-size volleyball courts or six indoor tennis courts. It can also seat 2,400 for banquets and 5,000 for events with general seating, such as a graduation ceremony or concert. Additional features of the indoor facility include a recreational walking track suspended 14 feet in the air, an athletic training and rehab center, and a food court.
The Finley Center sits on a 120 acre site that GMC master planned and includes fields for soccer, lacrosse, football, baseball and softball, tennis courts, a play ground walking track and splash pad.
Goodwyn, Mills and Cawood (GMC) provided master planning, architecture, interior design, civil engineering, construction materials testing, and environmental engineering services for this project.