View allAll Photos Tagged BuildingConstruction

Mateus Avalos, Peyton Suchanek, Emma Hull (left to right) and students intern at Turner Construction Company through the Construction Management program (CMGT), to work on the 94,000-square-foot BSS Building on Thursday, November 30, 2023 in Chico, Calif. The program combines theoretical and applied learning taught by faculty managing all aspects of construction with decades of experience in the field.

(Jason Halley/University Photographer/Chico State)

Dylan Allen (center) and students intern at Turner Construction Company through the Construction Management program (CMGT), to work on the 94,000-square-foot BSS Building on Thursday, November 30, 2023 in Chico, Calif. The program combines theoretical and applied learning taught by faculty managing all aspects of construction with decades of experience in the field.

(Jason Halley/University Photographer/Chico State)

The BSS Building is a 94,000-square-foot building that houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop on Monday, February 3, 2025 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

Juan Nava, Peyton Suchanek, Emma Hull (left to right) and students intern at Turner Construction Company through the Construction Management program (CMGT), to work on the 94,000-square-foot BSS Building on Thursday, November 30, 2023 in Chico, Calif. The program combines theoretical and applied learning taught by faculty managing all aspects of construction with decades of experience in the field.

(Jason Halley/University Photographer/Chico State)

A small collection of photos from a walk in Portland, OR. All of the photos from the walk can be seen at pnwphotowalks.com/2024-q2-walks-photos

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

Aerial view above campus on Friday, November 8, 2024 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

Juan Nava (left), Dylan Allen (right), and students intern at Turner Construction Company through the Construction Management program (CMGT), to work on the 94,000-square-foot BSS Building on Thursday, November 30, 2023 in Chico, Calif. The program combines theoretical and applied learning taught by faculty managing all aspects of construction with decades of experience in the field.

(Jason Halley/University Photographer/Chico State)

  

All images are available for prints and stock licensing. To learn more, visit my web site jamescolecreative.com

More than 2,000 yards of concrete has been place for the Integrated Sciences Complex 16-inch base slab. Utility excavation and work continue on both the east and south sides of the ISC construction site. Work continues in the service and supply tunnel.

Students in their Fundamentals of Ecology (BIOL 350W) class in the BSS Building Learning Hall 101 room during the first week of the spring semester on Wednesday, January 22, 2025 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

Student Ryan Acevedo studies in the open area as the campus community celebrates the grand opening of its long-awaited Behavioral and Social Sciences (BSS) Building on Tuesday, February 4, 2025 in Chico, Calif. Located near Children’s Park and serving as a bookend for the eastern side of campus and gateway to downtown, the stunning 94,000-square-foot building houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop hosted by Lovebird Coffee, owned and operated by alumna Rebecca Turi (Business Administration, ’21). The BSS Building is also home to the Community Legal Information Clinic and the Gender and Sexuality Equity Coalition.

(Jason Halley/University Photographer/Chico State)

#69370, Plastering student finishes off his work using a trowel and a water spray, Able Skills, Dartford, Kent.

The BSS Building is a 94,000-square-foot building that houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop on Monday, February 3, 2025 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

#91583, Trainee plasters learning to mix plaster, Able Skills, Dartford, Kent.

May 2, 2021 - Hilton Tower under construction across North High Street from the Hilton Columbus Downtown. The new 28 story hotel tower will have 460 guest rooms and between the two hotels it will be the largest hotel in the state of Ohio with nearly 1,000 rooms. Scheduled to open in 2022. On the right is the Hyatt Regency Columbus what is not seen is the Greater Columbus Convention Center which is just north of the new hotel tower.

Utility and tunnel work are underway at the Integrated Sciences Complex. Storm, sewer and drainage piping as well as electrical and IT conduit are being installed. Concrete continues to be poured for the elevator shafts and tunnel leading to the Service and Supply Building. A total of 8,500 cy of concrete will be placed during the construction of the Integrated Sciences Complex.

The BSS Building is a 94,000-square-foot building that houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop on Monday, February 3, 2025 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

The progress of restoration of the RC Church in Clonard Co. Meath. Pictures show progress at December 20th 2009 - restoration began at July 2009.

The BSS Building is a 94,000-square-foot building that houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop on Monday, February 3, 2025 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

The BSS Building is a 94,000-square-foot building that houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop on Monday, February 3, 2025 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

#69390, Plastering student applies plaster overhead, Able Skills, Dartford, Kent.

Student Ryan Acevedo studies in the open area as the campus community celebrates the grand opening of its long-awaited Behavioral and Social Sciences (BSS) Building on Tuesday, February 4, 2025 in Chico, Calif. Located near Children’s Park and serving as a bookend for the eastern side of campus and gateway to downtown, the stunning 94,000-square-foot building houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop hosted by Lovebird Coffee, owned and operated by alumna Rebecca Turi (Business Administration, ’21). The BSS Building is also home to the Community Legal Information Clinic and the Gender and Sexuality Equity Coalition.

(Jason Halley/University Photographer/Chico State)

#69352, Plastering student pours out some fresh plaster, Able Skills, Dartford, Kent.

Students walk into the BSS Building, a 94,000-square-foot building that houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop on Monday, February 3, 2025 in Chico, Calif.

(Jason Halley/University Photographer/Chico State)

Prefabricated concrete buildings in the developing business estate in Pakenham South, Victoria, Australia.

Mateus Avalos, Peyton Suchanek, Emma Hull (left to right) and students intern at Turner Construction Company through the Construction Management program (CMGT), to work on the 94,000-square-foot BSS Building on Thursday, November 30, 2023 in Chico, Calif. The program combines theoretical and applied learning taught by faculty managing all aspects of construction with decades of experience in the field.

(Jason Halley/University Photographer/Chico State)

Students study in the open area as the campus community celebrates the grand opening of its long-awaited Behavioral and Social Sciences (BSS) Building on Tuesday, February 4, 2025 in Chico, Calif. Located near Children’s Park and serving as a bookend for the eastern side of campus and gateway to downtown, the stunning 94,000-square-foot building houses nine academic departments, 22 classrooms, five laboratories, and a large, 130-seat tiered lecture hall, as well as faculty offices, conference space, breakout rooms, collaborative spaces, an indoor arboretum, and a coffee shop hosted by Lovebird Coffee, owned and operated by alumna Rebecca Turi (Business Administration, ’21). The BSS Building is also home to the Community Legal Information Clinic and the Gender and Sexuality Equity Coalition.

(Jason Halley/University Photographer/Chico State)

Rebar is set into the cement slab. The rebar is used to anchor the cement blocks that will be placed to create walls within the plant. The prodction area will be split into two main areas. Tthe walls keep the dust from causing any problems.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Statues cowering under polythene blanket for building work to complete.

1 2 ••• 49 50 52 54 55 ••• 79 80