With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.

 

Photos by Harry Brett

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

Construction marches on at UMass Boston campus – February 2013

Despite winter storms, construction work marches on at the University of Massachusetts Boston campus. Crews continue to work on the roof, the framing, conduit, ductwork and piping in the Integrated Science Complex. The mock Senate chambers begin to take shape at the Edward M. Kennedy Institute.

 

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

Construction marches on at UMass Boston campus – February 2013

Despite winter storms, construction work marches on at the University of Massachusetts Boston campus. Crews continue to work on the roof, the framing, conduit, ductwork and piping in the Integrated Science Complex. The mock Senate chambers begin to take shape at the Edward M. Kennedy Institute.

 

Aranui Library construction,9 June 2012.

 

File reference: CCL-2012-06_MG_3803

 

From the collection of Christchurch City Libraries.

New building construction on Punt Road, Richmond - near Swan Street intersection.

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

The large crane will leave the Integrated Sciences Complex site as ironworkers near the end of installing structural steel. Crews are pouring concrete for the floors in the new building.

 

Photos by: Harry Brett

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

The MIAMI REALTORS® celebrated the topping out of its new global headquarters with more than 100 Link Construction group employees on June 13, 2023.

The steel for the pedestrian bridge at the Integrated Sciences Complex was installed on Friday, April 20. Crews carefully set the bridge into place. The bridge will lead to the public areas of the future ISC.

With five floors of steel columns and beams and metal decking in place on the north wing of the Integrated Sciences Complex, structural steel and decking continues to be erected on the east wing. More steel continues to be fabricated in New Hampshire for the ISC sixth floor mechanical penthouse.

April 30, 2022 - NEMO Science Museum designed by Italian architect Renzo Piano and completed in 1997. "Piano’s striking, copper-green design helped the NEMO Science Museum to become one of the most recognizable buildings in Amsterdam. Situated on top of a tunnel on the city’s eastern docks, the building appears to rise dramatically out of the water. Piano felt Amsterdam was lacking a piazza overlooking the city, and designed the rooftop of the building to afford visitors such a view. Since 2013, the NEMO rooftop has featured a fully-functioning garden and has become a tourist attraction of its own accord." Previous text from the following website: www.invaluable.com/blog/renzo-piano/

Utility and tunnel work are underway at the Integrated Sciences Complex. Storm, sewer and drainage piping as well as electrical and IT conduit are being installed. Concrete continues to be poured for the elevator shafts and tunnel leading to the Service and Supply Building. A total of 8,500 cy of concrete will be placed during the construction of the Integrated Sciences Complex.

Structural steel for the Integrated Sciences Complex arrived on Wednesday, December 21, and the steelworkers have been busy erecting two stories of columns and beams on the north wing. The university community will see the ISC take shape as steel continues to go up and metal decks, concrete slabs and fireproofing are installed through the spring.

 