View allAll Photos Tagged AdultLearning

S2 Meeting Room with new cupboards and kitchen appliances.

The carpet on the lower level staircase, freshly laid.

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

High-res taken in Phoenix July 2019 by Ivan Martinez, used for the EEE website, OK to reuse

The day the building was handed back to Devon County Council by the contractors. The first floor library area with new shelves and tables in position.

Walls with their final colour in the first floor library space

Pre-construction Phase: ground floor. After the refurbishment, there will be one reception point for any enquiry, whether it is regarding the library, adult learning, or anything else and it will be near the entrance in this space.

 

During the pre-construction phase, the contractor used a white board to warn any visitors of the hazards in the building.

The walls of the new interview room has now been plastered (compare with the previous week www.flickr.com/photos/devonlibraries/6838806356/in/set-72...). There is a viewing window into the entrance hall to the right of it.

Not-quite-finished painted wall on the first floor!

View of the copper cladded extension from the second floor... and hoovering the roof (in poor weather conditions!)

View of the courtyard from the top floor, before the refurbishment, showing the mishmash of outbuildings cluttering the space. This is where the new extension will be built.

Storage cupboards being installed on the first floor

The new doors are in on the second floor.

The day the building was handed back to Devon County Council by the contractors. First floor library with its new shelves in position.

The library floor has now been concreted - very glad to see the big hole gone!

Other end of the children's library, being used as a shelving-building area

Looking from the cafe across the main ground floor library space.

Self-service printing iKiosk waiting to be unpacked

Cupboards have been installed in the staff room.

The cafe space is beginning to be fitted out.

Quite a lot of unpacking for The Country Table to do...

The children's library on the day that the contractors handed the building back to Devon County Council, ready for fitting out. On the left, shelving is ready to be assembled and on the right, new kinder boxes.

Main entrance, still a few things to sort out at reception!

Ground floor library and cafe in background - shelving complete and seating in position

1 2 ••• 38 39 41 43 44 ••• 50 51