View allAll Photos Tagged AdultLearning
The day the building was handed back to Devon County Council by the contractors. The first floor library area with new shelves and tables in position.
Pre-construction Phase: ground floor. After the refurbishment, there will be one reception point for any enquiry, whether it is regarding the library, adult learning, or anything else and it will be near the entrance in this space.
During the pre-construction phase, the contractor used a white board to warn any visitors of the hazards in the building.
The walls of the new interview room has now been plastered (compare with the previous week www.flickr.com/photos/devonlibraries/6838806356/in/set-72...). There is a viewing window into the entrance hall to the right of it.
View of the copper cladded extension from the second floor... and hoovering the roof (in poor weather conditions!)
View of the courtyard from the top floor, before the refurbishment, showing the mishmash of outbuildings cluttering the space. This is where the new extension will be built.
The day the building was handed back to Devon County Council by the contractors. First floor library with its new shelves in position.