View allAll Photos Tagged sitework

Granada Village Shopping Center Redevelopment (Phase 1 Sitework Construction - 2012-02-13) - Granada Hills, CA. Urban One www.urbanone.com.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "A Letter to Strangers" was performed and installed at the Memorial Chapel Steps. Photos: Jelena Dakovic.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "move." was performed and installed at the Art-Sociology Building Atrium. Photos: Jelena Djakovic.

April 2010 big dig project at the Growing Hope Center to put utilities underground and carry out the big cistern project!

April 2010 big dig project at the Growing Hope Center to put utilities underground and carry out the big cistern project!

Refurbishment of existing church, extension of toilet and boiler room together with associated siteworks.

 

Full QS service, traditional procurement. The challenge for this project was to meet the strict budget. We provided a cost plan to guide the design, regular cost checks to control cost during design development, a Bills of Quantities and careful monitoring to control cost during construction; contract and tender documentation for main works; regular predictive cost reports.

 

Sitework commenced July 16; certificate of occupancy was granted November 26. Had the owners built on their original site, development of utilities would have cost the project an additional month in pre-approvals and approximatetly $40,000 more.

Granada Village Shopping Center Redevelopment (Electrical Screenwall Construction - 2012-01-12) - Granada Hills, CA. Urban One www.urbanone.com.

Refurbishment of the existing church and bell-tower together with the construction of an extension to the existing sacristy and repairs and alterations to boundary walls together with associated siteworks.

 

Full QS service, traditional procurement. The challenge for this project was to meet the strict budget. We provided a cost plan to guide the design, regular cost checks to control cost during design development, a Bills of Quantities and careful monitoring to control cost during construction; contract and tender documentation for main works; regular predictive cost reports.

 

Granada Village Shopping Center Redevelopment (Building A2 Roof Construction - 2012-01-31) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Phase 2 Sitework Construction - 2012-02-28) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-01-12) - Granada Hills, CA. Urban One www.urbanone.com.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "A Letter to Strangers" was performed and installed at the Memorial Chapel Steps. Photos: Jelena Dakovic.

Granada Village Shopping Center Redevelopment (Phase 2 Sitework Construction - 2012-02-07) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Phase 2 DIning District Sitework Construction - 2012-02-20) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-01-16) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A3 & A4 Facade Construction - 2012-02-24) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building C1 HomeGoods Facade Construction - 2012-01-25) - Granada Hills, CA. Urban One www.urbanone.com.

uilding 1

Roof Trusses are 95% complete with sheathing 75% complete on the building.

Mechanical, Electrical, Plumbing rough in is underway on the 3rd and 4th floors and 50% complete.

Shingle and Flat Roof Installation is underway and 65% complete.

Building weather wrap is being installed and 90% complete.

Window Installation is underway and 75% complete.

Siding installation has started in the Courtyard.

Parking Garage Sprinkler systems is 75% complete.

Courtyard waterproofing prep is underway.

 

Building 2

Roof Sheathing is complete.

Mechanical, Electrical, Plumbing and Fire Sprinkler rough in is 40% complete at the 3rd floor and progressing up to the 4th floor.

Shingle and Flat Roof Installation is underway and 95% complete.

Building weather wrap is being installed and 95% complete.

Siding is underway on the South elevation and is 10% complete

Window Installation is underway and 85% complete.

 

Building 3

Wood framing has commenced.

 

Building 4

Foundation is 100% complete

Elevator shaft construction is complete

Underground Plumbing Rough is 65% complete

Underground Electrical Rough is 75% complete

 

Building 5

Foundation, underground utilities and slab is complete.

Progress pending framing start forecasted to start in November, 2018.

 

Building 6

Siding is complete.

Insulation is complete

Drywall installation is complete.

Site curbs are complete.

Painting is underway

Tile installation is underway.

Interior door and trim is underway.

 

Sitework

Curb formwork and installation is 90% complete on Mill Road

Starting to set building site to final subgrade

Pump station Wet Well foundation walls have been poured and wall formwork for balance of building is 95% complete

Damproofing and backfill has started.

Granada Village Shopping Center Redevelopment (Building A1 Roof Construction - 2012-02-07) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Roof Construction - 2012-02-07) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "move." was performed and installed at the Art-Sociology Building Atrium. Photos: Jelena Djakovic.

Granada Village Shopping Center Redevelopment (Building A3 & A4 Facade Construction - 2012-01-27) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Phase 1 Sitework Construction - 2012-01-25) - Granada Hills, CA. Urban One www.urbanone.com.

A tour of the Clopton SiteWorks (2601 Maury St) was given to GRP and City staff by John Gregory of Fountainhead Properties on May 25, 2016. More information available at www.cloptonsiteworks.com

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "A Letter to Strangers" was performed and installed at the Memorial Chapel Steps. Photos: Jelena Dakovic.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-01-12) - Granada Hills, CA. Urban One www.urbanone.com.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "move." was performed and installed at the Art-Sociology Building Atrium. Photos: Jelena Djakovic.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "move." was performed and installed at the Art-Sociology Building Atrium. Photos: Jelena Djakovic.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-02-07) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A3 & A4 Facade Construction - 2012-01-30) - Granada Hills, CA. Urban One www.urbanone.com.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "move." was performed and installed at the Art-Sociology Building Atrium. Photos: Jelena Djakovic.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-02-08) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 Roof Construction - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2012-01-19) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Pad L Facade Construction - 2012-01-12) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A2 - Pick Up Stix Facade Construction - 2011-10-06) - Granada Hills, CA. Urban One www.urbanone.com.

1 2 ••• 41 42 44 46 47 ••• 76 77