View allAll Photos Tagged retailspaces

Get a fresh take on homes, neighborhoods and the way life’s lived in Chicago’s Randolph Market neighborhood at YoChicago.

 

Visit the Randolph Market forum and join in the conversation.

 

Warehouse and Godowns in Bhiwandi, property wala, property bazaar, Office, Premises, Retail Space, WAREHOUSING, Factory Indl.,Factory, Plot, Land, COMMERCIAL SPACE, Shop, Showrooms, commercial premises, Land Portfolio, www.ajmeria.com, Mumbai, commercial, Industrial, Factory, Shed, Thane, Bhiwandi, Lands, plots, Warehouse, Storage, Residential,Property in Bhiwandi, Properties, bhiwandi, bhiwandi Property, bhiwandi Properties, bhiwandi Real Estate, Flats in bhiwandi, Resale Flats in bhiwandi, Plots, Bhiwandi Property, Mumbai - Search Properties in Bhiwandi, Real, Estate, Keywords, Top, Keywords, for, Search, Engine, Optimization

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

Store design by SKELA STUDIO: www.skelastudio.com

See all of the photos here: ourdream.smugmug.com/Commercial/MacGregor-MacDuff-Prestwick

For a professional Commercial photographer book Lee Live: Photographer - visit: www.leelivephotographer.com/

Store design by SKELA STUDIO: www.skelastudio.com

See all of the photos here: ourdream.smugmug.com/Commercial/MacGregor-MacDuff-Prestwick

For a professional Commercial photographer book Lee Live: Photographer - visit: www.leelivephotographer.com/

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

1 2 ••• 41 42 44 46 47 ••• 79 80