View allAll Photos Tagged renewable

BVB Class Be 4/4 single car 479 leads a Route 14 service for Pratteln into Aeschenplatz, Basel. IWB electricity is produced by water, solar and wind power plants in Switzerland and the tram represents one of the many renewable energy consumers in Basel.

 

All images on this site are exclusive property and may not be copied, downloaded, reproduced, transmitted, manipulated or used in any way without expressed written permission of the photographer. All rights reserved – Copyright Don Gatehouse

A Home Energy LLC solar installation for Omicron Biochemicals of South Bend, Indiana. This is a 4.46 kilowatt system with 19 Schott, 235 watt, solar panels.

BOEM Director, Amanda Lefton, addresses the conference attendees at Offshore WINDPOWER 2021

#OffshoreWind21

 

News Release: www.doi.gov/pressreleases/secretary-haaland-outlines-ambi...

 

Full-sized Map: www.boem.gov/sites/default/files/documents/renewable-ener...

 

Photo by Stephen Boutwell, Bureau of Ocean Energy Management

Triple Cities Makerspace is a 24/7 collaborative workspace and education center with the aim to bring together hackers, makers, artists, creatives, geeks, and technology enthusiasts. Located in Binghamton, New York.

 

Photo Credit: Stephen Yang / The Solutions Project

AltaRock Energy is working on a project involving new technology, techniques, and advanced monitoring protocols for the purpose of testing the feasibility and viability of enhanced geothermal systems for renewable energy production.

The project area is 22 miles south of Bend, Oregon, within the Bend-Fort Rock Ranger District of the Deschutes National Forest. The entire project is located on National Forest System Lands and would utilize an existing well pad and existing 10,000-ft deep geothermal well on a Federal geothermal lease. This geothermal project will enable the AltaRock Energy to create, test, and demonstrate the Enhanced Geothermal Systems (EGS) reservoir technology and its potential for electricity generation in areas with underground heat but little or no natural water. The EGS projects produce electricity using heat extracted with engineered fluid flow paths in hot rocks. These pathways are developed by stimulating them with cold water injected into a well at a relatively high pressure.

Development and testing of the EGS will involve several components, including the development of an underground reservoir, one ā€œstimulationā€ well to help create the reservoir and transport water to it, two production wells to transport heated water out of the reservoir, and an array of up to 20 surface and ā€œdown-holeā€ seismic monitoring devices.

Eleven of the monitoring sites are on Federal geothermal leases administered by the BLM, and nine are on lands that are administered by the U.S. Forest Service, including one surface micro-seismic monitoring station and a motion sensor installed in the Newberry National Monument.

The United States leads the world in electricity generation with geothermal power. The U.S. Energy Information Administration reported that in 2012, U.S geothermal power plants produced about 17 billion kilowatt-hours (kWh), or 0.4% of total U.S. electricity generation. Six states had geothermal power plants: California had 36 plants producing about 80% of the Nation's geothermal-produced electricity; Nevada had 21 plants producing about 16% of the Nation's geothermal-produced electricity; Utah had two plants; and Hawaii, Idaho, and Oregon each had one plant. Geothermal energy is also used directly for space and water heating applications.

The Geothermal Steam Act of 1970, as amended (84 Stat, 1566; 30 U.S.C. 1001-1025), provides the Secretary of the Interior with the authority to lease public lands (245 million acres) and other federal lands, including National Forest lands (193 million acres), for geothermal exploration and development in an environmentally sound manner. This authority has been delegated to the Bureau of Land Management (BLM).

Leases are required to explore for or develop geothermal resources on public lands. Leasing requirements are described in the 43 CFR 3200 Geothermal Leasing Regulations.

As of June 5, 2013 there were 78 federal geothermal leases encompassing 102,484 acres in Oregon, a 2% acreage decrease since May 2012, and four leases encompassing 8,436 acres in Washington representing no change over the same period. There have also been 15 parcels nominated for leasing, 6 in Oregon (11,452 acres) and 9 in Washington (35,480 acres). Three of these are on BLM land; the remaining 12 are on U.S. Forest Service (USFS) land.

  

Specific project and location information for OR/WA can be found at this website: www.blm.gov/or/energy.

 

Photo: Michael Campbell, BLM.

 

One of the new additions to our fleet hard at work collecting food waste for recycling

Etherecash.io. One of the biggest crises we face as a global community is climate change. Blockchain technology could help us not just change how we contribute to renewable energy, and also renewable energy transportation itself.

 

Developed on the ERC20 blockchain technology with lawyer backed contracts, to make blockchain backed lending and fund management, private and seamless.

 

Buy our tokens now. Visit Etherecash.io.

The 2nd Meeting of the D-8 Working Committee on Renewable Energy was successfully held from 16-17 November 2011 in Bali, Indonesia. The Meeting, attended by all D-8 member countries, was hosted by the Ministry of Energy and Mineral Resources of the Republic of Indonesia and also attracted active participation from private sectors in the renewable energy sector.

 

During the first meeting in Ankara last year, potential project and technical assistance proposals for further promotion of cooperation in this field were made. In this second meeting in Bali, Indonesia, the progress and explore future development and wider cooperation were among the topics elaborated by the participants.

Excellent placement record for Renewable Energy batch of August 2016. Congratulations and all the best to all our students! #MITSkills

I did that quick Photoshop editing quite a while back. Just found it again on my HD.

 

17,000 Wind Energy Power Plants are killing 150,000 birds. In Germany. Yearly.

Tea time at the Eilat-Eilot Renewable Energy Conference

Drones for Renewable Energy Survey along with exciting new image-processing algorithms are driving a fundamental change in how data aggregation takes place whilst providing quick, economic, safe and accurate drone survey in India. For more information visit us at- www.yolaxinfra.com/renewable-energy-survey.php

The 2nd Meeting of the D-8 Working Committee on Renewable Energy was successfully held from 16-17 November 2011 in Bali, Indonesia. The Meeting, attended by all D-8 member countries, was hosted by the Ministry of Energy and Mineral Resources of the Republic of Indonesia and also attracted active participation from private sectors in the renewable energy sector.

 

During the first meeting in Ankara last year, potential project and technical assistance proposals for further promotion of cooperation in this field were made. In this second meeting in Bali, Indonesia, the progress and explore future development and wider cooperation were among the topics elaborated by the participants.

Researchers experimenting with painting wind turbines in contrast colors to make them more visible to birds, thus reducing the risk of collisions. (Photo: Espen Lie Dahl)

The Renewable Energy Center on the campus of Eastern Illinois University in Charleston, Illinois on July 1, 2011. (Jay Grabiec)

The 2nd Meeting of the D-8 Working Committee on Renewable Energy was successfully held from 16-17 November 2011 in Bali, Indonesia. The Meeting, attended by all D-8 member countries, was hosted by the Ministry of Energy and Mineral Resources of the Republic of Indonesia and also attracted active participation from private sectors in the renewable energy sector.

 

During the first meeting in Ankara last year, potential project and technical assistance proposals for further promotion of cooperation in this field were made. In this second meeting in Bali, Indonesia, the progress and explore future development and wider cooperation were among the topics elaborated by the participants.

The PS20 solar tower plant sits outside Seville, Spain. The solar tower plant, the first commercial solar tower in the world, by the Spanish company Solucar (Abengoa), can provide electricity for up to 6,000 homes.

 

CREDIT COMPULSORY, EDITORIAL USE ONLY

Credit: Markel Redondo/Greenpeace

The Dialogue was organised by the Council on Energy, Environment and Water (CEEW) in collaboration with Ministry of New and Renewable Energy (MNRE), International Solar Alliance (ISA), International Energy Agency (IEA), Shakti Sustainable Energy Foundation (SSEF), and REN21. This edition of the Dialogue had a special focus on market creation and market trends.

The Dialogue was organised by the Council on Energy, Environment and Water (CEEW) in collaboration with Ministry of New and Renewable Energy (MNRE), International Solar Alliance (ISA), International Energy Agency (IEA), Shakti Sustainable Energy Foundation (SSEF), and REN21. This edition of the Dialogue had a special focus on market creation and market trends.

The 2nd Meeting of the D-8 Working Committee on Renewable Energy was successfully held from 16-17 November 2011 in Bali, Indonesia. The Meeting, attended by all D-8 member countries, was hosted by the Ministry of Energy and Mineral Resources of the Republic of Indonesia and also attracted active participation from private sectors in the renewable energy sector.

 

During the first meeting in Ankara last year, potential project and technical assistance proposals for further promotion of cooperation in this field were made. In this second meeting in Bali, Indonesia, the progress and explore future development and wider cooperation were among the topics elaborated by the participants.

The 2nd Meeting of the D-8 Working Committee on Renewable Energy was successfully held from 16-17 November 2011 in Bali, Indonesia. The Meeting, attended by all D-8 member countries, was hosted by the Ministry of Energy and Mineral Resources of the Republic of Indonesia and also attracted active participation from private sectors in the renewable energy sector.

 

During the first meeting in Ankara last year, potential project and technical assistance proposals for further promotion of cooperation in this field were made. In this second meeting in Bali, Indonesia, the progress and explore future development and wider cooperation were among the topics elaborated by the participants.

I had already seen these online but recently witnessed them first hand in a friends container. I estimate they are equivalent to an old fashioned 40 watt bulb. Made from plastic bottles and water they are incredible simple and effective

President Aquino launched the 42.5-megawatt Sibulan Hydroelectric Power Plant in Sta. Cruz, Davao del Sur on Thursday (Sept. 16, 2010). Energy Secretary Jose Rene Almendras, Davao del Sur Governor Douglas Cagas, Sta. Cruz Mayor Joel Lopez and Aboitiz Power President and CEO Erramon Aboitiz assisted P-Noy during the ceremony. The power plant can provide more than 200 million kilowatt-hours annually of clean and renewable energy to Davao Light and Power Company (DLPC) in augmenting power demands to the provinces of Davao del Sur and Davao del Norte Photo by Jay Morales / MalacaƱang Photo Bureau

poster communicating the fact that the pentagon is one of the countries leading spenders on renewable resource energy.

This turned out way better than I was hoping. Which is alway encouraging

wind farms on the road from granada to salobrena

The Avatiu Valley Power Station in Rarotonga, Cook Islands. The Renewable Energy Project aims to increased energy security in an environmentally sustainable manner.

 

Read more on:

Cook Islands

Energy

Renewable Energy Sector Project

The 2nd Meeting of the D-8 Working Committee on Renewable Energy was successfully held from 16-17 November 2011 in Bali, Indonesia. The Meeting, attended by all D-8 member countries, was hosted by the Ministry of Energy and Mineral Resources of the Republic of Indonesia and also attracted active participation from private sectors in the renewable energy sector.

 

During the first meeting in Ankara last year, potential project and technical assistance proposals for further promotion of cooperation in this field were made. In this second meeting in Bali, Indonesia, the progress and explore future development and wider cooperation were among the topics elaborated by the participants.

1 2 ••• 6 7 9 11 12 ••• 79 80