View allAll Photos Tagged offshore

Offshore 2011 Amsterdam by EWEA -- Fergus Ewing, Minister for Energy, Entreprise and Tourism, Scotland, at the opening session Tuesday morning 29 November.

Some of the behind scences, day-to-day work that goes on with MPI Offshore and MPI Workboats.

Fugro Galaxy inbound for Port of Sunderland

Tori on her maiden expedition yak fishing offshore

The Great Offshore Exhibition pictures, Espace multimédia gantner.

www.espacemultimediagantner.cg90.net/?post_type=rendezvou...

  

credits: wilfried b.

www.flickr.com/photos/139860688@N08/

Sailing off the New England coast with Williams-Mystic, the maritime studies program of Williams College and Mystic Seaport.

 

(c) Gregory Albright

Columbia River Bar Start of the OREGON OFFSHORE RACE at buoy 2. 41st Annual Oregon Offshore. Hosted by Corinthian Yacht Club of Portland May 10th-14th '17 sailboat race begins in Astoria, OR and ends in Victoria, BC

TEAM MAPITO - Creative Storytelling Studio based in Xàbia and Breda, with AI integrated into the workflow.

 

www.teammapito.com

Offshore supply vessel laid up in Hull's Albert Dock

Built in 2001 by Appledore Shipbuilders Ltd (yard no. A.S.186) for Toisa Ltd (Sealion Shipping Ltd, managers).

Sold in 2018 to ACSM Shipping Co SL of Vigo and renamed NAUTILUS.

Maritime Developments at Offshore Europe 2015

She is about to enter the port of Aberdeen

The beautiful Gulf of Mexico taken from the bow of a boat.

 

My best photos are on Fine Art America and 500px. If you want to see some great photos in your feed, visit me on Facebook.

We can produce size up to Φ152 mm R3, R3S, R4 Offshore mooring chain, accessories.

Besides, our company have got Societies' approval of

ABS(America), LR(Britain), BV(France), GL(Germany), NK(Japan), KR(Korea), DNV(Norway), RINA(Italy),CCS(China)..

1. Standard length is 27.5m per piece,we also can produce and cut anchor chains according to your requirement .

2. Material: alloy steel, generally including CM390, SM490, CM690, or according to your requirement

3. Grade :U2&U3 stud link anchor chains

4. Surface treatment: self color, black painted, zinc galvanized, hot dip galvanized or according to customer's requirement.

5. The tension breaking load conforms to National Standard.

6. Studless anchor chains. Specification: 12.5-70mm, mainly adapt to vessels, fish net tenesmus, mine, municipal engineer, new established garden decoration

7. Production process: (1) material cutting (2) heating (3) curving (4) welding (5) thorn cutting (6) pressing (7) heating treatment (8) Blind bolts (9) polishing (10) painting or galvanized

Columbia River Bar Start of the OREGON OFFSHORE RACE at buoy 2. 41st Annual Oregon Offshore. Hosted by Corinthian Yacht Club of Portland May 10th-14th '17 sailboat race begins in Astoria, OR and ends in Victoria, BC

Some of the behind scences, day-to-day work that goes on with MPI Offshore and MPI Workboats.

Captain Scott Elford offshore vessel master. Photos taken while working on offshore wind farms on a CTV - many during construction periods.

24h Modélisme Offshore 2008 Viry Chatillon

The Great Offshore Exhibition pictures, Espace multimédia gantner.

www.espacemultimediagantner.cg90.net/?post_type=rendezvou...

  

credits: wilfried b.

www.flickr.com/photos/139860688@N08/

DeepOcean kit on Teesside

Sunset on my offshore diving, looking at Ocean Endeavour Rig through jacket of a production platform.

Competition leader Fairview

by Stephen Schatz | Office of Communications, Maryland Department of Natural Resources

 

Maryland Natural Resources Secretary Mark Belton, Ocean City Mayor Rick Meehan and others attend a press conference expressing opposition to offshore drilling.

Energy Duchess PSV/Fire fighting vessel entering Aberdeen Harbour

 

Design: PX121 - Ulstein X-Bow

 

DP2 class vessel

 

IMO: 9740744

 

Vessel Type - Generic: Other

 

Vessel Type - Detailed: Supply vessel fire fighting

 

MMSI: 259032000

 

Call Sign: LAWS7

 

Flag: Norway

 

Gross Tonnage: 3795

 

Summer DWT: 3957 t

 

Length Overall x Breadth Extreme: 83.28 x 18.64 m

 

Year Built: 27.05.2019

 

Ship manager/Commercial manager & ISM: GOLDEN ENERGY OFFSHORE MGMT AS

 

Registered owner: ENERGY DUCHESS AS

 

Shipyard: Nantong Rainbow Offshore & Engineering Equipments Co., Ltd., China

 

Hull Number: C0501000023 - 1023

 

Contract date: 2013-12-20

 

Keel laid: 2014-11-20

 

Launch: 2015-10-28

 

Date of build: 2019-05-27

 

Main Engine: x2 Caterpillar 3512C @ 1628kW each AND x2 Caterpillar 32C @ 994kW each

 

Propulsion: x2 Azipull 85 CP @ 1700kW each

 

Bow Thruster: x2 tunnel thrusters CP @ 880kW each

 

Work/Cargo Deck Area: 858m2

 

Usable Deck Area: 850m2

 

Deck Strength: 10t/m2

Lorina Premium Offshore yarislarinda!

19th Annual Norway Ship & Offshore Finance Forum

Offshore screen?

1 2 ••• 68 69 71 73 74 ••• 79 80