During this phase of construction we are working on:

- Completion of cementitious siding at Building #3

- Progression of cementitious siding at Building #4

- Masonry veneer work at Building #5 is nearing completion on South elevation and progressing on East Elevation

- Interior drywall operations at Buildings #5

- Finishes being installed at Building #2

- Main Utility Connections taking place

- Exterior courtyard planter walls being installed at Building #1

- Archways at N. Ocean being finished

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

My red stapler, there are many like it, but this one is mine.

Yeah, it's about time to clean this freakin' desk.

 

Please note the TP is for nose blowing, nothing more, nothing less.

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

In downtown Washington's East End, The Tower Companies and The Lenkin Company turned 1050 K Street—a former parking lot near the old DC Convention Center site—into the beginning of a neighborhood renaissance.

 

This 11-story, 136,000 square-foot LEED Gold boutique office building features the latest techniques in sustainable design—triple-scrubbed indoor air, 100renewable power from wind energy, recaptured runoff and ground water, hi-tech thermal floor-to-floor glass windows that maximize natural light, KONE EcoDisk elevator traction system and a rooftop garden.

 

1050 K Street, Washington DC, Architect: Hickok Cole

During this phase of construction we are working on:

- Completion of cementitious siding at Building #3

- Progression of cementitious siding at Building #4

- Masonry veneer work at Building #5 is nearing completion on South elevation and progressing on East Elevation

- Interior drywall operations at Buildings #5

- Finishes being installed at Building #2

- Main Utility Connections taking place

- Exterior courtyard planter walls being installed at Building #1

- Archways at N. Ocean being finished

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

Pune’s growing commercial significance, coupled with the newly developed breed of entrepreneurs, who work with a fresh and innovative thought process, have helped change the city’s commercial property landscape.💯✅

 

#gsvvertica #commercialoffices #showroomspaces #officespaces #kharadi #kharadiprojects #commercialproperties #punerealestate #realtor

serviced office space to rent in the City of London EC3 with seating and reception areas

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

Your business place, your business partner. Offices, training and conference rooms by the hour, day, week and longer. Corporate Office Centers provides instant, turnkey workplace solutions with flexible terms for your business and budget. Professional reception services. Downtown Los Angeles - 445 Figeuroa - Union Bank Building

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

Before the big collapse there were many big projects going on in Iceland. One of it was this skyscraper which now stands empty near downtown Reykjavik. There are lot of new building like this around Reykjavik, empty or half finished. Anyone in need of office space?

 

Reykjavik, Iceland. June 2009.

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

We swear this shot wasn’t posed. On second thought, never mind.

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

These are photos of the C3 Co-Working space at the Cambridge Innovation Center in Cambridge, MA.

Findghar is a growing informational network which helps you to take informed and guided decisions about your dream property, quickly and effectively. You can Search properties like houses, apartments, land, commercial spaces, new projects etc for sale or for rent. Properties can be listed by agents, builders and individuals. Findghar is dedicated to meet your requirements as both, a seller and a buyer. If you are selling a property then Findghar is a perfect platform for you to advertise and generate interest from potential buyers. Findghar strives to provide you ample opportunities to generate business out of our website- selling, buying or leasing out property. The best advantage with Findghar is that all our services are absolutely FREE!!

Aerial photographs of the construction of the New Village Development.

 

For more information on this project please visit www.newvillagepatchogue.com

For more information about TRITEC please visit www.tritecrealestate.com

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 

empty building for start ups in Lyon (now crowded)

Photos of the larger office (available for rent as of December 1st, 2010) at The Network Hub, 422 Richards Street, Third Floor, downtown Vancouver.

Since our last photo…

 

Building 3 is formed for the first phase of elevated structural concrete deck, and the second phase elevated deck pour will be moving toward the Lake Street edge by the end of July.

 

Building 4 has much of its sub grade structure in place with a move toward the elevated structural deck by the end of August.

 

Subgrade utilities for LIPA, Verizon and Cablevision are completed at 70% of the site along with the same percentage of sewer and storm connections to on site drainage structures.

 

The New Village at Patchogue project has emerged into the spring with accomplished milestones that include the completion of the Building 5 elevated structural post-tension slab and the breaking of ground for foundation at Building 4. These two structures will begin the vertical rise along Main Street and will place all of the five buildings in active progress. Building 1 is the Northeast building at the corner of Lake and No. Ocean and is topping out it framed units at the third floor. Building 2 has erected its initial section of the first floor and masonry structures have been completed as some of the stair and elevator shafts. Concrete systems are progressing toward completion of the main structural post-tension slab at the Building 2 & 3 connection and wood systems will follow along that same path. Mechanical, Electrical and Plumbing systems are roughing at framed units.

 

External site work will move toward the installation of sub grade structures and utility distribution conduits to make way for the services that support the project.

 