View allAll Photos Tagged masterbath
Walls and the celing in the shower are complete, next up is the grout (and the little peice on the door).
The PermaBase is painted with the waterproofing (RedGuard) and the tile is on the way up. The date is April 21, 2014, about 12 weeks into the project.
Auction.com is now offering a look at some of our most desirables homes up for auction. Here's a spacious starter home that was remodeled in June 2009. It's a 5 bedroom/3 bath home that features hand scrapped hardwood floors, granite countertops and polished travertine tiles.
•3,042 Sq. Ft Lot Size
• 4,000 Sq. Ft Lot
•Year Built 1991
4856 Lonestar Way Antelope CA 95843