View allAll Photos Tagged ibm
IBM opened a new branch office in the city of Da Nang in Central Vietnam on 22 May, 2012, as part of the company’s continued geographic expansion initiative to increase its presence in key growth markets. The Da Nang office is IBM’s third in Vietnam to date after Hanoi and Ho Chi Minh City.
Link to the press release: www-03.ibm.com/press/us/en/pressrelease/37803.wss
The former International Business Machines (IBM) building at 520 Capitol Mall in Sacramento was designed in 1963. This 67,200 square foot building provides 8 floors of flexible office space, a penthouse for mechanical equipment, and a basement with service facilities for the main tenant. The site is an interior city lot, located on Capitol Mall, an important boulevard (one of the first areas to be redeveloped in the downtown area). The neighboring buildings are and have always been financial and government buildings.
The first, second and third floors were designed to be leased to and occupied by the major tenant (IBM). The other 5 floors divided into smaller office suites. The building was later acquired by IBM, who redesigned the interiors for their occupancy of the entire building. The original client was Dr, Charles E. Brown and the construction cost was $3 million including the 4-level parking structure which accommodates 207 cars. Continental Construction was the construction manager.
The head of IBM interviewed and hired Dreyfuss & Blackford Architects even though they weren't the owners, just the prime tenants. It was the first precast building in Sacramento, and the tallest building on Capitol Mall, in addition to being the first building in the redevelopment of Sacramento.
(Japanese is below)
American football season 2017 special game.
IBM 97 - OBIC 94
Kobayashi (32) was the best player of the game
More info here: www.insidesportjapan.com/football/x-league/2017-season-1/...
アメフトの2017シーズン
特別ゲーム
IBM 97 - OBIC 94
Kobayashi (32)はベストプレーヤーです。
詳細情報:https://www.insidesportjapan.com/football/x-league/2017-season-1/seagulls-big-blue/
(Japanese is below)
American football season 2017 special game.
IBM 97 - OBIC 94
Kobayashi (32) was the best player of the game
More info here: www.insidesportjapan.com/football/x-league/2017-season-1/...
アメフトの2017シーズン
特別ゲーム
IBM 97 - OBIC 94
Kobayashi (32)はベストプレーヤーです。
詳細情報:https://www.insidesportjapan.com/football/x-league/2017-season-1/seagulls-big-blue/
(Japanese is below)
American football season 2017 special game.
IBM 97 - OBIC 94
Kobayashi (32) was the best player of the game
More info here: www.insidesportjapan.com/football/x-league/2017-season-1/...
アメフトの2017シーズン
特別ゲーム
IBM 97 - OBIC 94
Kobayashi (32)はベストプレーヤーです。
詳細情報:https://www.insidesportjapan.com/football/x-league/2017-season-1/seagulls-big-blue/
IBM model 561-2 - self-regulating clock. Apparently it's a slave clock that has to be hooked up to a master clock system. Serial #949493. International Business Machines Corporation, Endicott, NY USA
power supplay olivetti pr2 plus dan Passbook IBM 9068 A03 / Epson PLQ 20 / Olivetti PR 2+ Singapura dan bermacam-macam sparepart pasbook Ibm , Epson , Olivetti , Tally dan Wincor hub: 021-68246693 / 081399636202 / 08165410186 / 08170015572 atau email : t_ i_ o_ 2004@ yahoo.com
IBM announced the expansion of its branch office in Port Louis on the island of Mauritius in the Indian Ocean off the South East coast of Africa on 14 March, 2012. The increased presence will strengthen IBM's ability to provide solutions and services to a rapidly expanding base of customers and partners in the region.
Link to the press release: www-03.ibm.com/press/us/en/pressrelease/37207.wss
The former International Business Machines (IBM) building at 520 Capitol Mall in Sacramento was designed in 1963. This 67,200 square foot building provides 8 floors of flexible office space, a penthouse for mechanical equipment, and a basement with service facilities for the main tenant. The site is an interior city lot, located on Capitol Mall, an important boulevard (one of the first areas to be redeveloped in the downtown area). The neighboring buildings are and have always been financial and government buildings.
The first, second and third floors were designed to be leased to and occupied by the major tenant (IBM). The other 5 floors divided into smaller office suites. The building was later acquired by IBM, who redesigned the interiors for their occupancy of the entire building. The original client was Dr, Charles E. Brown and the construction cost was $3 million including the 4-level parking structure which accommodates 207 cars. Continental Construction was the construction manager.
The head of IBM interviewed and hired Dreyfuss & Blackford Architects even though they weren't the owners, just the prime tenants. It was the first precast building in Sacramento, and the tallest building on Capitol Mall, in addition to being the first building in the redevelopment of Sacramento.
Watson, powered by IBM POWER7, is a work-load optimized system that can answer questions posed in natural language over a nearly unlimited range of knowledge.
Bring your child to work day. Activities included designing mobile apps, creating empathy maps, and other design studio activities aimed at youth.
This building is used by IBM Switzerland as their local headquarter.
Two other objects for my new collection.
Nick Elliott, Managing Editor, Dow Jones Clean Technology Insight (left) interviews keynote Allan Schurr, VP, Strategy and Development, Global Energy and Utilities Industry, IBM.