View allAll Photos Tagged ibm
The former International Business Machines (IBM) building at 520 Capitol Mall in Sacramento was designed in 1963. This 67,200 square foot building provides 8 floors of flexible office space, a penthouse for mechanical equipment, and a basement with service facilities for the main tenant. The site is an interior city lot, located on Capitol Mall, an important boulevard (one of the first areas to be redeThe former International Business Machines (IBM) building at 520 Capitol Mall in Sacramento was designed in 1963. This 67,200 square foot building provides 8 floors of flexible office space, a penthouse for mechanical equipment, and a basement with service facilities for the main tenant. The site is an interior city lot, located on Capitol Mall, an important boulevard (one of the first areas to be redeveloped in the downtown area). The neighboring buildings are and have always been financial and government buildings.
The first, second and third floors were designed to be leased to and occupied by the major tenant (IBM). The other 5 floors divided into smaller office suites. The building was later acquired by IBM, who redesigned the interiors for their occupancy of the entire building. The original client was Dr, Charles E. Brown and the construction cost was $3 million including the 4-level parking structure which accommodates 207 cars. Continental Construction was the construction manager.
The head of IBM interviewed and hired Dreyfuss & Blackford Architects even though they weren't the owners, just the prime tenants. It was the first precast building in Sacramento, and the tallest building on Capitol Mall, in addition to being the first building in the redevelopment of Sacramento. eloped in the downtown area). The neighboring buildings are and have always been financial and government buildings.
The first, second and third floors were designed to be leased to and occupied by the major tenant (IBM). The other 5 floors divided into smaller office suites. The building was later acquired by IBM, who redesigned the interiors for their occupancy of the entire building. The original client was Dr, Charles E. Brown and the construction cost was $3 million including the 4-level parking structure which accommodates 207 cars. Continental Construction was the construction manager.
The head of IBM interviewed and hired Dreyfuss & Blackford Architects even though they weren't the owners, just the prime tenants. It was the first precast building in Sacramento, and the tallest building on Capitol Mall, in addition to being the first building in the redevelopment of Sacramento.
IBM Q
Quantum Computing
MIT Technology Review Innovation Leaders Summit
Palais Brongniard
30 Novembre 2018
Esse foi um evento criado para a IBM. O tema do evento era a acessibilidade, e as facilidades algumas delas até propostas pela IBM com softwares e palestras, para a inserção de portadores de necessidades especias e idosos nas empresas. Foram convidados pessoas com grande poder de decisão de grandes empresas brasileiras e multinacionais.
Acima, é um DVD do Ray Charles, enviado de forma teaser, com uma embalagem que contava a história do músico, com a identidade do evento e assinado pela IBM, porém sem maiores informações sobre o mesmo.
El ordenador Watson, compuesto por varios racks de IBM POWER7, es un sistema optimizado de cargas de trabajo que puede responder preguntas planteadas en lenguaje natural
One of the available awards from the IBM Thanks! program. All items say things like 'made from recycled paper and card', 'using sustainable timber' etc.
The IBM System 360 is an IBM mainframe computer, released in 1964. It was the first computer to separate architecture from implementation: the 360 had different models with different prices. Slightly modified radiation hardened versions (System/4 Pi) of this machine are used to control the Space Shuttle.
A group of undergraduate students from sub-Saharan Africa visit the IBM headquarters in Armonk on July 23, 2010, as part of a program hosted by the University of Connecticut and sponsored by the U.S. State Department. ( Xavier Mascareñas / The Journal News )
IBM Blue Gene/P logo, picture sourced from another flickr member a while back, let me know if this is your picture for accreditation or if you'd like it taken down
In the early 90s I was told that mainframes are gone, dinosaurs. LANs are the deal. Duh?
That was a gift as they hauled out the old one and installed the new mainframe. And all these years later... Well we do have a retake on VM (CP-67, etc.) on Intel platforms. Go figure.
IBM 513, I believe. Not sure the purpose of the program that was left on the board, but it brings new meaning to "spaghetti code".
Governor Culver participates in the grand opening celebration for IBM’s new Technology Delivery Center in Dubuque.
Processing unit interface equipment, seen removed from its cryogenic enclosure, of an IBM System Q quantum computer.
Pantallazo de la guía de usuario de la plataforma IBM Quantum Experience.
Más información en www-03.ibm.com/press/es/es/pressrelease/49669.wss
Síguenos a través de Twitter en @IBM_ES, @IBMResearch
Copyright: IBM Research