View allAll Photos Tagged formwork

Formworks1Systems, inc. is the leader in formwork and water systems. We specialize in concrete formwork, concrete formwork systems, concrete formwork design.

Formwork for the poured concrete foundatin wall going in place. Grid of re-bar visible.

photos by the Owner

Formwork all up and pipes laid prior to pouring the ring beam of concrete

In onga-tyo, Nishi River

Formworks1Systems, inc. is the leader in formwork and water systems. We specialize in concrete formwork, concrete formwork systems, concrete formwork design.

Formworks1Systems, inc. is the leader in formwork and water systems. We specialize in concrete formwork, concrete formwork systems, concrete formwork design.

Detail of the formwork around the residential stoops.

Concrete pieces cast using a fabric formwork technique

We have a team of experienced structural and civil engineering working for you. We at Masta Concrete are the specialist and one-stop destination for Concrete Wall Formwork for commercial and residential buildings. Call us on 0422 265 125 or visit our website to know more: www.mastaconcrete.com.au/penrith/

Concrete housing construction

 

Concrete housing construction using aluminum concrete forms

 

Concrete housing construction using aluminum concrete forms

With the Overhead Roof Support Beams in place and Tie Rods passed down through them, to carry the load of the 'green' concrete via a steel Tolerance Plate that doubles as the slip plate in the soffit; the sides of the Box Traveler are 'shrunk' into the middle, clear of the 'green' concrete walls. This allows the slab to be supported, the box to be shrunk, dropped onto its wheel units, rolled forward, opened out, plumbed, squared and reset with a new set of roof tolerance plates; then the prefabricated re-bar can be put in place and the box re poured. This means that another piece of the tank is poured and stripped, if possible, EVERY DAY.

 

It is almost impossible to be able to achieve better productivity than is possible with this method

 

The Plate Girder All Steel Panel Box Traveler is being used here to form a lengthy Storm Attenuation Tank. The tank is underneath the ground floor of the Westfield Shopping Centre in West London, near the BBC in Wood Lane.

This was taken as the sun was beginning to rise at the construction site I am working on. The pour was for a bridge abutment that will carry a single-carriageway road over a new dual carriageway, and as the pour was on a Friday we didn't want to be working late hence the early start.

We flew in Tuesday late afternoon, Wednesday it was back to work. No rest for the wicked!

Formwork and rebar for the first section of wall and parapet for Wall 2 just east of the building at 208 Griggs Street.

leveling concrete in formwork

Poland, Kraków

This was the design for the formwork elbow at the Brillant Dam expansion near Castlegar, BC done by Scouten Engineering

©Christopher Borrok

Test Flickr Import

New step with formwork removed.

Formworks1Systems, inc. is the leader in formwork and water systems. We specialize in concrete formwork, concrete formwork systems, concrete formwork design.

Found image of formwork structure, with Photoshop inversion and overlay of my photo of decorative lights.

1 2 ••• 70 71 73 75 76 ••• 79 80