View allAll Photos Tagged formwork
Complete precasting installation to manufacture transformer units (electrical substations) by Olmet Italy.
Installation et mise en place de la barre d'armature à l'intérieur du coffrage destiné au sol en béton coulé sur place.
Concrete forms destine for Brazil set for final inspection. For more information on aluminum concrete forms visit www.wallties.com
Foundations for the new Boilermakers Workshop at Millaquin Sugar Mill. Warren Hess (blue shirt) and Barry Kenny prepare the formwork for the rat baffle wall on the foundations.
This product is pretty cool. One guy set up this home's foundation in a couple days using this modular expanded polystyrene formwork. The consolation to using non-biodegradable polystyrene as a formwork is that you leave the blocks in place, substantially increasing the R-value of the foundation. Not losing heat to the ground represents a huge energy savings in the northern climates.
Pouring of the foundations for the dewatering mill in B Train. Mick McDade (white hat in the formwork), Bruce Rutherford (dark jumper) and Bruce Jensen on the right.
Rapid concrete home construction in Mexico using aluminum handset concrete forms. For more information on formwork visit Concrete Forms
Rapid concrete home construction in Mexico using aluminum handset concrete forms. For more information on formwork visit Concrete Forms
(5) View of self-contained stretch form from the side, showing the upward sweep of the latex between the parts that touch the table.
Howard Civil Engineering used RMD Kwikform's Ascent Climbing Formwork to construct a new lift bridge over Salford Canal.
Howard Civil Engineering used RMD Kwikform's Ascent Climbing Formwork to construct a new lift bridge over Salford Canal.
Howard Civil Engineering used RMD Kwikform's Ascent Climbing Formwork to construct a new lift bridge over Salford Canal.
Rapid concrete home construction in Mexico using aluminum handset concrete forms. For more information on formwork visit Concrete Forms
Howard Civil Engineering used RMD Kwikform's Ascent Climbing Formwork to construct a new lift bridge over Salford Canal.
Howard Civil Engineering used RMD Kwikform's Ascent Climbing Formwork to construct a new lift bridge over Salford Canal.
S and F Concrete installed formwork and reinforcing steel, also called rebar, for the first foundation concrete placement for the new Integrated Sciences Complex (ISC).
The concrete was poured atop the clustered piles and rebar to form caps. Concrete was also placed to form the base wall of the grade beam foundation. Concrete trucks joined the mix of excavators, backhoes, and pile and reinforcing steel delivery trucks on the ISC site.
Photos by Harry Brett