View allAll Photos Tagged datacenter

Newly renovated datacenter for lease.

Newly renovated datacenter for lease.

A view of the the main datacenter entrance. The main Comverse sign is viewable to the right.

Upside view of under the raised floor. This is all EoE Infiniband cabling

The ‘hot internal’ section of one of the 4 Kyoto Cooling Wheels, with a view on the fans and humidity control unit.

The heating/cooling installation of the DUPSs, with a heat exchanger to separate the internal and external circuits.

The disk farther away is set to 80Gb mode, running fedora, we will boot from that one to finish recovering.

 

The other one is the destination disk, the new 80Gb one, but with jumpers set to 32Gb max.

 

Below them, the SCSI data disk (bad, bad, disk, no cookie!) and another older IDE (OS and boot, 8Gb).

My server had a little planned downtime, my server had to move to another rack and in the meantime I could swap some memory-modules...

the postal NonStop machines in the Eagan datacenter

At a client's datacenter, I saw this classic Apple II, racked and running.

My server had a little planned downtime, my server had to move to another rack and in the meantime I could swap some memory-modules...

Todd Boucher from Leading Edge Design Group joins VT Governor Jim Douglas and others for the Tech Vault ribbon cutting ceremony

Most of the time, pix of computer equipment are rather dull (see other photos in this set!) I liked this one catching a red indicator light behind the rack and the yellow and blue cables.

Large cage in the colo filled with lots of Xserves.

This is the networking cabinet in BitPusher's new Seattle datacenter. Every cabinet has two HP2848 switches for redundancy that each plug into one of our Cisco 6506's via Fiber. Blue cables are for our left network, Green are for our right. Black are for management gear like Loms.

Cisco 3750 Switch Stack. Also has a RAD Multiplexer, and Cisco Standby Power Supply.

Cable management (Front view).

Cable management (Rear view).

Rolf Wallentin, Markteing Manager at Proact

A detail of the power distribution under the raised floor, showing power bars A and B, fused connection boxes and the control bus.