View allAll Photos Tagged crossover
Some "before" the season begins sewing. Ruffles were made preserger breaking. Pattern is McCalls with added ruffles.
This crossover will be removed as part of the Wherry Lines resignalling project. RJ16, RJ3, 17A/B points visible in this photograph. Up signal in background is RJ53, and RJ9/4 (left to right) on the bracket.