View allAll Photos Tagged contractor.
Flew onto Explore - Thanks so much Everyone!
Highest position: 500 on Friday, April 12, 2013
It must be Spring as nests are popping up all over. This Great White Egret is bringing a finely selected stick back with him. I wonder if that is for the Living room or one of the Bedrooms...
Have a great weekend Everyone!
Continuing this brief series of cool sights I saw on a single morning outing to Grasslands, the park at my doorstep. These two Moose with their calves were a surprise; I tend to see moose more often in fall and winter. And last year there was considerable noise and commotion as contractors built a new bridge across the Frenchman River - resulting in many wildlife species, including moose, steering clear of the area until things settled down.
But.. they're ba-ack!
I'm so happy. They add an extra touch of wildness to the prairie landscape. Twenty-four years ago, when I first spent some extended time hanging out in this place, moose were a rare sighting. In the interim, they have arrived to occupy the valley, and other prairie locations, too; biologists are not sure why.
My theory? They find ample food and shelter here, where there are no natural predators, no hunting, and an abundance of peace and quiet. Essentially these are the same reasons I moved here full time in 2011. I'd like to think I'm smarter than the average moose. But maybe I'm not.
More to come...
Photographed in Grasslands National Park, Saskatchewan (Canada). Don't use this image on websites, blogs, or other media without explicit permission ©2024 James R. Page - all rights reserved.
Website | Twitter | 500px | Facebook | Instagram | Getty
Ok, So I've had this Fuji X100F for a couple of weeks now and can't make up my mind if I love it or hate it. On the plus side it's small, mirrorless and inconspicuous, meaning I can get away with a bit more street photography without being glared at!
However, the ergonomics of the camera are painful. The grip if far to small, and as a result it's easy to accidentally knock one of the four buttons on the command dial. I've disabled two of them, but it's impossible to disable the "drive" button. As a result today I managed to knock the camera into "filters" mode without realizing it and spent 10 minutes trying to work out what I'd done. Somehow it also switch from raw mode to jpg mode at the same time which I didn't realize until I got home, at which point I gave the camera a stream of four letter words.
The bold SOO lettering on the hood of this candy apple red SD40-2 has held up well over the last 30 years.
This is the former SOO No. 6617, which was built in April of 1983. It survived on the CP for a while before it was sold to Respondek's Squaw Creek Southern Railroad in southern Indiana. It's now in the possession of Mike Roberts, owner of Railway Service Contractors, Inc.
The lettering on the engineer's side of the hood of this unit was patched and stylized to read "SCS" for the Squaw Creek Southern. 12/11/23.
Another ruthless killer.
Have a great time guys.Thank you for visit.
My DeviantART- noro8.deviantart.com/
My ArtStation - www.artstation.com/noro8
The Pueblo Arcade is a historic building in Vero Beach, Florida. Located at 2044 14th Street, the Pueblo Arcade was built in the Mission/Spanish Revival style in 1926 by local contractors Blackford and Davis. This structure was very popular among the citizens of Vero Beach due to its ingenious design, prior to the introduction of Air Conditioning. It consisted of arcades with shop doorways opening onto a single hallway which opened to the street. The structure was restored by developer Robert L. Brackett and was added to the U.S. National Register of Historic Places on March 8, 1997.
This beautiful church was incorporated in 1923. Work was started the same year toward a new edifice and was completed in 1924. The rectory was moved north to parallel the construction, facing the lake.
L. Phillips Clarke, of Harvey and Clarke, was the architect for the new church, as he was later for the new parish hall in 1929 and for the new rectory and Sunday School rooms built later. Wilcox Bros. Inc., the contractor, built the church and also did repair work after it suffered hurricane damage in 1928.
The marble and mosaic work was done by craftsmen from Italy, who brought much of the material with them. Louis S. Clarke (whose father, C. J. Clarke, had donated the community building in which the original church group met, and whose son was the architect for the present building) made the chandeliers for the church by hand, together with the chains by which they hang, all of which he forged himself. The marble altar and the original Skinner organ were made possible by generous donations.
On February 24, 1924, the first service was held in the new church. The old church building was then used as a parish hall until it was destroyed in the hurricane of September 1928.
Some features that identify it as the original church building are the arch detail over the entrance, the screen doors, and one of the small front windows.
In May 1929 work was started on the first two units of a new parish hall. The cornerstone was laid on July 14th and work was completed in September. A choir room, kitchen quarters, and a new rectory were added in 1939. Funding for and work on the Sunday school rooms which frame the current courtyard commenced in 1948.
The collapse of the land boom in 1926, the killer hurricane in 1928, and the stock market crash of 1929 brought development to a halt in the region. Holy Trinity, holding a large debt for the new building, endured a very difficult struggle and at one point foreclosure was threatened. However, in 1938 as the depression waned, the debt was restructured and disaster was averted.
The formal consecration of the church was held on April 29, 1945, after the mortgage was retired. The event was hailed in the press as "the high point in the history of the Episcopal congregation in West Palm Beach." The consecration services were conducted by Bishop John D. Wing of the Diocese of South Florida, before a congregation that packed the building. The Rev. William S. Turner was rector at that time.
Memorials and gifts throughout the years, too numerous to detail in this limited space, have enhanced the beauty of the church. A large Skinner organ was added to the original organ in 1939, and other additions were subsequently made. The stained glass windows were installed over a period spanning sixty years, with the first window, the large rose window over the altar, being installed in 1924. The most ambitious window addition program occurred in the 1950s with the Rev. James Stirling as Rector. The most recently installed windows, in the south wall of the Baptistry, were installed in 1984.
Having originally been started with the help of Bethesda-by-the-Sea, Holy Trinity has in turn through the years helped start five other Episcopal churches in the area: St. Andrews Church, Lake Worth, St. Georges, Riviera Beach, St. Marks, Palm Beach Gardens, The Church of the Holy Spirit, West Palm Beach, and Grace Episcopal Church, West Palm Beach.
Credit for the data above is given to the following people and websites:
www.flickr.com/photos/59081381@N03/https://en.wikipedia.o...www.holytrinitywpb.org/our-history
www.flickr.com/photos/59081381@N03/
© All Rights Reserved - you may not use this image in any form without my prior permission.
via Basketball Court Contractors ift.tt/21BEVLe
Basketball Facility Fencing in Rutland #Fencing #Basketball #Facilities #Rutland t.co/paUhbH1orW
Your search for tile contractors in Toronto ends here! We are Megacity Suppliers and our tile contractors Toronto team offers a variety of tile designs and textures for your home or office needs. With our tiles and contracting services, your premises will turn into a better space with an exquisite aura.
Visit Megacity today, for premium quality tiles in Toronto.
New character.
Have a great time,thank you for visit.
My DeviantART- noro8.deviantart.com/
My ArtStation - www.artstation.com/noro8
Contractor hit gas line, new condos behind it were collateral at popular local bagel shop in NW Portland
Main entrance. Red furniture are good accent.
------------------------------------------------
Toki Messe (朱鷺メッセ).
Architect : Maki (設計:槇総合計画事務所).
Contractor : Fukuda Corporation (施工:福田組、東急建設、丸運建設JV).
Completed : December 2002 (竣工:2002年12月).
Structured : Steel Reinforced Concrete (構造:SRC造・RC造・S造・PC造).
Costs : $290 million (総工費:約290億円).
Use : Convention center (用途:展示場、会議場).
Height : ft (高さ:m).
Floor : 4 (階数:地上4階).
Floor area : 338,352 sq.ft. (延床面積:31,434㎡).
Building area : 210,660 sq.ft. (建築面積:19,571㎡).
Site area : 1,110,071 sq.ft. (敷地面積:103,129㎡).
Owner : Niigata Pref. (建主:新潟県).
Location : (所在地:日本国新潟県新潟市中央区万代島6-1).
Referenced :
jirei.tlt.co.jp/index.cgi?mode=detail&kt=04_03&id...
I like that view, A-FACTORY and Aomori Bay Bridge (青森ベイブリッジ)!
----
A-FACTORY (A-FACTORY).
Architect : Wonderwall (設計:ワンダーウォール).
Contractor : Tekken Corporation (施工:鉄建建設).
Completed : December 2010 (竣工:2010年12月).
Structured : Steel frames (構造:S造).
Costs : $6 million (総工費:約6億円).
Use : Store (用途:店舗、工房).
Height : ft (高さ:m).
Floor : 2 (階数:2階).
Floor area : 18,646 sq.ft. (延床面積:1,732.27㎡).
Site area : 6,781 sq.ft. (敷地面積:620㎡).
Location : 1-4-2 Yanakawa, Aomori City, Aomori, Japan (所在地:日本国青森県青森市柳川1-4-2).
Referenced :
www.welcome.jp/projects/commercial/a-factory
kenplatz.nikkeibp.co.jp/article/building/news/20110223/54...
A WLE crew and contractor perform maintenance on the Mingo Creek trestle in the shadows of the Joe Montana bridges of Route 43.
via Basketball Court Contractors basketballcourtcontractors.tumblr.com/post/143070333959 "LeBron avoiding war of words with Van Gundy, Pistons"
@ Air Antilles Express ( FWI )
De Havilland Canada DHC-6-300 Twin Otter - msn.797
• ENG : Pratt & Whitney Canada PT6A-27
• REG : F-OIJY
@ Aircraft History :
• 15.JUN.1982 : First flight with test reg C-GDIU at built site de Havilland Canada Inc., Downsview, ON Canada
• 12.JUL.1982 : Delivered to Danzer Furnierwerke AG, Kesselsdorf, Germany
• JUL.1982 : Tsf to "SIFORZAL-Société Industrielle et Forestière Zaïre Allemande" Kinshasa with reg 9Q-CJD
• 10.MAR.2004 : Sold to "Nordic Aviation Contractors" Billund Denmark with reg D-IFLY
• 14.MAY.2004 : Sold to "Air Guyane" GG & GUY Cayenne with reg F-OIJY
• xxx : Tsf to "Air Antilles Express" 3S & GUY with reg F-OIJY
Hunslet Works No. 469 'Hastings' awaits its passengers at Bodiam station. Built by Hunslet Engine Company in 1888 for the Manchester Ship Canal contractors, T A Walker.
_C1A9101
----------------------------------------------
TOTOミュージアム - 建築グラビア Architecture Gravure
Gallery : photowork.jp/christinayan01/architectural/archives/2814
----------------------------------------------
TOTO Museum (TOTOミュージアム).
Architect : Azusa Sekkei (設計:梓設計).
Contractor : Kajima Corporation (施工:鹿島建設).
Completed : May 2015 (竣工:2015年5月).
Structured : Steel frames (構造:鉄骨造).
Costs : $60 million (総工費:約60億円).
Use : Museum, office (用途:博物館).
Height : ft (高さ:m).
Floor : 4 (階数:4階).
Floor area : 118,876 sq.ft. (延床面積:11,044㎡).
Site area : 101,051 sq.ft. (敷地面積:9,388㎡).
Location : 2-1-1 Nakashima Kokura-Kita Ward, Kitakyushu City, Fukuoka, Japan (所在地:日本国福岡県北九州市小倉北区中島2-1-1).
Referenced :
www.toto.co.jp/company/press/2015/03/pdf/20150330.pdf
www.azusasekkei.co.jp/projects/6/6/detail/310
----
I found a couryard, white stone and planted simply trees, and moss aound root. It was succeed to make beautiful space!
treeps.deviantart.com/art/The-Daedric-Contractor-386389382
I said, I did. The daedric version of the Contractor Mask was done.
Also, I'm using the Wintage version of the Somber ENB now. I loved it!! =D
A new contractor for TfWM routes, Kev’s Cars and Coaches have three of these smart little MMC200s for the 39/A/S Route, from Quinton/ South Woodgate to Weoley Castle, Northfield and terminating at Longbridge. This is the last alphabetically, pictured on Barnes Hill, with a 39 bound for Longbridge. Thanks to the friendly driver who paused 30 seconds to allow for this photo 👍
This Left-Hand Drive Scammell Contractor was one of the heavy haulage machines that were active at the Welland (Malvern) Steam and Country Fair in 2023.
Kuma's works in Tohoku region. His simply and standard design for exterior.
----------------------------------
トワーレ - 建築グラビア Architecture Gravure
Gallery : photowork.jp/christinayan01/architectural/archives/4929
----------------------------------
Civic Koryu Exchange Plaza "Towaare" (十和田市市民交流プラザ).
Architect : Kengo Kuma & Associates (設計:隈研吾建築都市設計事務所).
Contractor : Kamikita Kensetsu (施工:上北建設、経商事、竹達建設JV).
Completed : 2014 (竣工:2014年).
Structured : (構造:).
Costs : $13 million (総工費:約13億円).
Use : Plaza (用途:交流施設).
Height : ft (高さ:m).
Floor : 1 (階数:1階).
Floor area : 19,181 sq.ft. (延床面積:1,782 ㎡).
Building area : sq.ft. (建築面積:㎡).
Site area : 62,430 sq.ft. (敷地面積:5,800㎡).
Location : 18-33 Inaoicho, Towada City, Aomori, Japan (所在地:日本国青森県十和田市稲生町18-33).
Referenced :
non-grid.com/tadahiro-gunji/civic-city-plaza/
kkaa.co.jp/news/the-towada-city-plaza-for-social-communic...
www.city.towada.lg.jp/docs/2012042600016/files/7tosisaise...
Contractors for the power company chipping limbs cut from trees too close to the power/cable lines. Doing this now will save hours and dollars when the next "Wind" storm arrives or ice storms next Winter. This task is done every 3 years or so, never ending.
As we are aware getting into locations can be a bit bizar , as we left this place a local german lady stopped pedalling her bike and asked us when was the "Building " going to be re opened , we so were not german contractors , as we found this place there happened to be major road works right outside the place , the only way in !!