View allAll Photos Tagged constructions

In June 2011, the Bryn Mawr College Athletic Department started constructions to transform Applebee Field from a natural grass surface to a new multi-use synthetic turf field. These are photos from the transformation.

 

Photos ©2011 Ed Harman, Assistant Director of Grounds, 610-526-7938

A new highway under construction through pristine rainforest.

USUHS construction Aug 1976. Bldg A three floors of concrete poured. Bldg B footers dug. North view.

Tools to Build Your Future Construction Career Day 2016

The streetcar stop at 12th & Main is under construction.

Title: Construction

[Addition of information is pending]

Construction walkway next to an open pit a building was being built on at the University

Construction site right in front of the rehearsal place we just spent a month in. Took a few pictures of it every few days or so...

 

Taken with my Lomo Compakt Automat.

Crews work on the construction project at Route 109 over Route 100 in Wildwood.

Construction underway in 1991 for the dam that would claim the Mooney Farm, along with other fertile bottom ground along Crow Creek, in yet another feeble attempt to keep Wheeling Island from flooding.

photo by Julie Duewel/NDOT

 

June 23, 2009

The steel work starts to go up in July 2009

In Niagara Falls, NY on September 12th, 2014

Drosbjerg during construction. Drosbjerg 41, 43 and 45.

Construction at Georgetown University

In June 2011, the Bryn Mawr College Athletic Department started constructions to transform Applebee Field from a natural grass surface to a new multi-use synthetic turf field. These are photos from the transformation.

 

Photos ©2011 Jacob Mullins, Assistant Athletic Director, 610-526-7344

Shield boss attached, front shot.

Meccano is there as well.

A view of the finished construction September 2004

Bamboo flooring being installed in #71.

Construction and revocation of Piedmont Craftsmen's final location at 601 N. Trade Street.

1 2 ••• 75 77 78 79 80