View allAll Photos Tagged assemblyrow

Outside and alone, this worker still wears her mask as she cleans the exterior of a new apartment building.

Cutting bricks for the facade of a new building at Assembly Row.

Even the giant lego giraffe at the Lego Discovery Center wears a mask. (The Lego Center was closed at this point, but is about to open--with restrictions--again.)

A meal in the sunshine of the continuing construction site around Assembly Row.

Where there is constant construction, there is also regular road work.

In a mixed-use "lifestyle" development like this one, the shopping and eateries sometimes get lost amid the housing and corporate tenants. Guess they wanted to help address that....

Legoland has re-opened with masks required for all. The workers don't mess around, the guy cleaning the sign 20 feet up is even wearing his.

The 5th Annual Ice Sculpture Stroll at Assembly Row in Somerville, MA was held on Dec 8, 2022.

 

There were 9 ice sculptures scattered throughout the Assembly Row area... 8 made before hand and one made on location. The event was hosted by Assembly Row and Capitol One. From my understanding... all of the ice sculptures were paid for by Assembly Row except for one... which was paid for by Capitol One.

 

Ice Sculpture Name: Ice Hockey Player

Ice Sculpture Sponsor: Assembly Row

Created by: Brookline Ice

 

The fancy-schmantzy "shuttle bus" pulls into the construction zone of Assembly.

I never thought I'd see a "designer" jean store tell me to "wash [my] hands often."

Quite the stylish little cyclist and mom. Love that helmet.

Camera: Hasselblad 501c

Lens: 80mm Planar 2.8 T*

Film: Fuji Provia 100F

Scanner: Epson V800

Stacked chapeaus in the Assembly area...where construction is ongoing.

1 3 4 5 6 7 ••• 33 34