View allAll Photos Tagged Officespace
Hanging out with a Red Swingline Stapler. Office Space is a great movie!
Color Corrected, Cropped, and resized using Photoshop.
Newly prebuilt office suite available in well-managed Broadway property conveniently located near City Hall. Space features light/views on three (3) sides, exposed ceilings, carpeted floors and is configured in an open bullpen. Space measures 2,174 SF and asking rent is $37.00/SF, $6,703/month.
On the top side of Atlanta near GA 400 & I-285 are the Concourse Five & Six office buildings, aka the "King & Queen" buildings. This is an edited shot of the Queen building.
I was in Atlanta to visit my sister @ Northside Hospital who was recovering from surgery for Crohn's disease. Hopefully, this will give her many years of release and send the nasty disease into remission.
The Executive Centre’s business centres in #Mumbai offer serviced & virtual office spaces.
Understanding the needs of every business, we provide #OfficeSpaces for rent with including all facilities, flexible lease terms, professional business support and the latest IT infrastructure in top business locales & CBD.
It's easy & cost effective to find business centers with us. Visit our web site to know more bit.ly/2mPhVKW
I exaggeratedly swung my arms and hips as I ostentatiously sauntered down the corridor. I wanted to see the apartment dwellers because I expected they would probably be among the sexiest people in town.
-----------------------
In downtown Lansing, Michigan, on November 30th, 2018, 721 North Capitol Avenue, erected 1972, on the west side of North Capitol Avenue, between West Madison Street and West Saginaw Street.
-----------------------
Getty Thesaurus of Geographic Names terms:
• Ingham (county) (1002502)
• Lansing (2052433)
Art & Architecture Thesaurus terms:
• apartment houses (300005707)
• arches (300000994)
• brick (clay material) (300010463)
• capital letters (300055061)
• mixed use (300112289)
• office buildings (300007043)
• sidewalks (300003893)
• signs (declatory or advertising artifacts) (300123013)
• street addresses (300386983)
• surveillance cameras (300266381)
Wikidata items:
• 30 November 2018 (Q45921919)
• 1970s architecture (Q7160121)
• all caps (Q3960579)
• Buildings and structures completed in 1972 (Q6404494)
• Downtown Lansing (Q5303483)
• November 30 (Q3015)
• November 2018 (Q31179571)
I got this quote from Aaron Swartz from the documentary The Internet's Own Boy. It is a moving film and really makes you wonder about a lot in the world.
Image via flickr photo by Oblong flickr.com/photos/oblongpictures/5250948891 shared under a Creative Commons (BY-NC-SA) license
This is at the end of entrance hallway. It was also completely custom done. The back lighting was an addition that we made after the piece was cut.
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.
The wallpaper Bill Lumbergh has on his new Windows Vista machine.
Get the full file including and iphone background at jbiljr.com/2007/11/09/movie-night/
Newly vacant office suite available in boutique East 29th Street building conveniently located steps from Park Avenue South subway (6 train) in the heart of Manhattan's Murray Hill neighborhood. Space features hung ceiling, carpeted floors and is configured with perimeter offices and an open bullpen. Space measures 2,900 sf and asking rent is $40.00/sf, $9,667/month.
Spent all of yesterday/last night cleaning and reorganizing my home office. This is what it looked like 2 years ago.Thought I'd take new pics with natural light and a better camera ;)
This closet was a mess for quite a while (before). Now it's nice and tidy... for now.
Well situated in the heart of a suburban downtown revitalization, the 31 West Building has stood in the Village for close to a century and is in the midst of a renovation that will prepare it to be a vital part of Patchogue for the next century.
Today, 31 West is a 26,334 SF mixed use Office and Retail building. The original structure once stood with proud architectural features; high ceilings, keystones, cornices, crown molding and tin ceilings. Many of these features will return in the renovation.
Redevelopment of the facade, the reintroduction of the original cornice at the top of the building, replacement of all storefronts, a new main entrance and lobby core, upgraded elevator, bathrooms and hallways have all been completed. The building has become the Jewel of Main Street and is awaiting tenants.
Redevelopment of the property was done by TRITEC Development Group, the construction was completed by TRITEC Building Company, and the building is managed by TRITEC Asset Management. The photographs were taken by Steve Geraci of Reflex Photo.
Elevations on New Village at Patchogue’s Building 1 are now complete. Inside building 1, paint, tile and trim are nearly complete and cabinet and granite installations have begun on the 4th floor with floor. Roofing is complete on Buildings 2 and 5 and elevations are underway. Inside Building 2 Interior trades are completing rough plumbing, electric, fire sprinkler and HVAC.
Masonry shafts, stair towers and installation of 3rd floor panels are almost complete on buildings 3 and 4.
Ongoing site work includes the rigging of submersible transformers; parking lot curbs and site lighting being installed in phase 1. With colder weather approaching interior parking lot development and courtyard construction as well as completing the installation of all utilities to the buildings is a priority.