View allAll Photos Tagged NewBuild

Demolition and new building gap filler dancing

 

www.gapfiller.org.nz/

A newbuild by Metro Camell, the trailers were never designed to have driving cabs fitted - this was a later addition when the arrangements for coupling and decoupling the trailer at a terminus became evidently complicated.

Kings Park estate newbuilds, Harold Wood, June 2015.

 

Qaphelani Crèche is conditionally registered and awaiting a new PCR certificate for full registration.

 

The centre has received three new classrooms, kitchen & pantry, toilet facilities, jungle gym and signage. The conversion of an old building into an office.

The Lisa and Cy Wagner Student Academic Services Center, being built east of Michael F. Price Hall, will bring the main student academic services to one centrally located building on campus, said Blake Rambo, OU press secretary.

 

Photo by JR Cooke/The Daily

Old classroom at Ngqongeni Crèche.

 

This centre is awaiting full Partial Care Registration. As part of the Strategic ECD Infrastructure Support programme it received a new 2 classroom unit, kitchen, pantry, toilet facilities, jungle gym, fencing and signage.

🔍 Plaghunter protects this beautiful picture against image theft. Get your own account for free! 👊

Zicht op de verdieping waar het orkest speelde.

From the silverman terrace

Construction worker at Thandanani Crèche.

 

As part of SEIS Thandanani Crèche will be receiving:

1. Additional building – Kitchen, office, pantry/storage facility

2. Repairs: Floor and roof repaired, and doors painted

3. Fencing - the facility needed fencing.

4. Health & Safety: Fire extinguisher, first aid box, safety signage, and a fenced waste pit added.

5. Toilet facility: toilets were added to the facility

 

All work at the centre was concluded February 2019.

 

In picture: Mr Lehlonololo Dijo – Lima RDF.

 

BritWeek at First Unitarian Church on April 27, 2013

17/18 November 2008.

Here we are at week 20 of the build. The pace seems to be accelerating! They were due to finish before Christmas.

New infrastructure at Zamani Crèche, which is conditionally registered and awaiting a new PCR certificate for full registration.

As part of SEIS the centre received an additional classroom, a toilet facility, fencing, fire extinguisher installed, waste pit, fixed leaks in the roof, signage

 

Halfway down the plot. Again, pre weeds.

We are excitedly preparing for our move into the new building. The increased space will allow us to reach more residents at-risk of hunger. Hilary, our Dorector of Special Projects, has been dilligently working to ensure that the entire food bank is ready to move in July. To see our new facility and keep up with our progress, visit us at: www.capitalareafoodbank.org/new-home-for-cafb/

BritWeek at First Unitarian Church on April 27, 2013

17/18 November 2008.

Here we are at week 20 of the build. The pace seems to be accelerating! They were due to finish before Christmas.

 

Kings Park estate. Part of the newbuilds. This was likely a rebuild. December 2015.

1 2 ••• 68 69 71 73 74 ••• 79 80