View allAll Photos Tagged Narendra-Modi,
Prime Minister Shri Narendra Modi & French President, H.E. Mr. Emmanuel Macron met over a working lunch in Bali
The name ‘Janmarg’, which means ‘people's way’, was given by the Hon. Chief Minister of Gujarat, Shri. Narendra Modi. Janmarg is a system for one and all. It is about connecting people and ensuring progress. Janmarg is about creating an identity for public transport in Ahmedabad and a sense of pride in Ahmedabad's citizens for their city. Janmarg is an image that will define the ethos of Ahmedabad as a city that is ready to accept change, a city that has a vision for the future, a city that will transform the image of public transport in India.
Ahmedabad BRTS is a bus rapid transit system developed by Gujarat Infrastructure Development Board (GIDB) for the city of Ahmedabad, recognizing that no single mode would cater to the mobility needs of the city and that buses form the most critical segment of the public transport system in the Ahmedabad. GIDB entrusted the system design task to CEPT University. A part of first corridor connecting Pirana to R.T.O. was opened to public on October 14, 2009 by Chief Minister of Gujarat Narendra Modi.
In addition, after the implementation of Ahmedabad BRTS and MetroLink Express Gandhinagar and Ahmedabad, Gujarat International Finance Tec-City (GIFT) would be easily accessible through a multimodal mix of Rapid Transport Systems.
Unlike other Indian BRTS projects, this project is on full-swing and the system designs are quite similar to Curitiba's Rede Integrada de Transporte and Bogota's TransMilenio which are exceptionally better than Delhi BRTS and Pune BRTS. By following this system Chennai BRTS and Bangalore BRTS are also under implementation.
Second half of the first phase of the BRTS was inaugurated on December 25, 2009, birthdate of Atal Bihari Vajpayee, former Prime Minister of India. Phase I was stretched up to Kankaria Lake, to cater eastern part of the city also. It was the first time that BRTS buses crossed river & reached Maningar, the most developed area of the city. It was inaugurated by Gujarat Chief Minister Narendra Modi.
Ahmedabad Janmarg Limited
Ahmedabad Janmarg Limited (AJL), the parent company which would govern BRTS operations in the city, is constituted as a Special Purpose Vehicle by Ahmedabad Municipal Corporation, Ahmedabad Urban Development Authority and Government of Gujarat. It is presently envisaged that private operators selected through competitive bidding will carry out bus operations.
AJL will soon introduce smart cards for commuters. Regular BRTS passengers will be able to buy these smart cards, which will function similar to the monthly pass system for state transport and AMTS buses. The AJL will, however, offer many schemes for the users of their smart cards. The commuters will be able to buy the smart cards at INR 500 apiece and the fare for each journey will be deducted from this amount. For example, for a journey from the RTO to Nehrunagar costing INR 5, this amount will be deducted from the INR 500 paid for the smart card. Hence, the commuters will not have to carry money for the fare every time they travel on the BRTS buses. At present, paper tickets are available at the special ticket windows at the BRTS stations. There are turnstile machines near the ticket windows, where the commuters can have their tickets punched to allow them entry inside the stations.
Buses
The buses currently operating on the BRTS are Tata Buses, it is a mixed fleet of Air conditioned and non-air conditioned buses. This bus is buit by Chartered Speed locally. This is India's first bus with the specifications. The production cost of the buses is half compared to Volvo and Mercedes Benz and that is the main reason of the success of Ahmedabad BRTS.
Awards
Sustainable Transport Award 2010
Best Mass Rapid Transit System in India 2009
More Information About BRTC Click Official Website
Prime Minister Shri Narendra Modi met H.E. Mr. Bundeskanzler Olaf Scholz, Federal Chancellor of the Federal Republic of Germany on the sidelines of the G20 Summit in Bali
Prime Minister Shri Narendra Modi with other
G20 Leaders' planted mangroves at the Taman Hutan Raya Ngurah Rai forests
Vice President Kamala Harris and Indian Prime Minister Narendra Modi share a toast during a State Luncheon at the Department of State in Washington, DC, on June 23, 2023. [State Department photo by James Pan/Public Domain]
The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is in Secant Operational model. It is being implemented entirely on public-private partnership (PPP) basis, with the state government holding a minority equity stake. A 30 km stretch from Miyapur to Nagole, having 24 stations was inaugurated on 28 November 2017 by Prime Minister Narendra Modi. No other rapid transit metro service in India opened for public operations on such a long stretch of 30 km. As of October 2018, it is the second longest operational metro network in India after the Delhi Metro, after a 16 km stretch between Ameerpet-LB Nagar Metro route was opened on 24 September 2018. It is estimated to cost ₹18,800 crore (US$2.6 billion). As of October 2018, about 200,000 people use the Metro per day. Trains are now crowded during the morning and evening hours, when employees travel to and from work. A ladies only coach was introduced on all the trains from 7 May 2018.
HISTORY
To respond the rising public transport needs and mitigate escalating vehicular traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in [August] 2003. The increase in population of Hyderabad made MMTS alone insufficient for public transport, which led to Union Ministry of Urban Development giving the nod for the Hyderabad Metro Rail Project and directed the DMRC to conduct a survey on the project.[ this project was seen necessary in view that the population of Hyderabad was forecasted to reach 13.6 million by the year 2021. According to the initial plan, the metro was to be connected with the already existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.
On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad.
INITIAL BIDDING
The bidding process was completed by July 2008 and awarded to Maytas which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.
RE-BIDDING
In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the ₹121.32 billion (US$1.7 billion) project. L&T came forward to take up the work for about ₹14.58 billion (US$200 million) as viability gap funding as against the sanctioned ₹48.53 billion (US$680 million).
MASCOT
The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.
AWARDS AND NOMINATIONS
HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.
L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management category.
In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council’s (IGBC) Green MRTS Platinum Award.
CONSTRUCTION HISTORY
Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012 the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II. The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets. If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.
The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015.
In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.
The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015. The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.
CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016. Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.
The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.
In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.
Ameerpet-LB Nagar Metro stretch is open for commercial operations from 24 September 2018.
CONSTRUCTION PHASES
The construction work was undertaken in two phases. There are six stages of completion in Phase I
PHASE I
The Phase I of the project includes 3 lines covering a distance of around 72 km. The metro rail stretches between Nagole and Secunderabad 11 km originally scheduled to be operational by December 2015, is now partially operational since 29 November 2017. The entire 72 km 57-station first phase is due to be completed by December 2019 with Hitec City - Raidurg line and MGBS - Falaknuma line is scheduled to be completed by December 2019.
Line 1 - Red Line - Miyapur – L B Nagar - 29.2 km
Line 2 - Green Line - JBS - Falaknuma 15 km
Line 3 - Blue Line - Nagole – Raidurg - 28 km
PHASE II
The Government is planning second phase of metro rail extending further. The construction of Phase II will be taken up solely by the state government, instead of public private partnership (PPP) mode in Phase I. Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II. Metro Rail Phase II expansion plan is for about 60 km, which includes providing link to Shamshabad RGI Airport.
LINES
Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color. Ameerpet- LB Nagar metro stretch opened on 24 September 2018. HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is scheduled to be completed in November 2019, as it involves construction of 49 pillars and the Raidurg terminal station. Efforts are being made to complete the 8.5-km stretch from Ameerpet to HiTec City by December 2018.
RECEPTION
The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1. On the first Sunday of operations, the Metro was used by 240,000 people.. As of September 2018, the daily ridership was about 2,00,000.
Trains are initially being operated at a frequency of 3.5 minutes in very peak hours and every 6.5 minutes in peak hours (between Miyapur-Ameerpet) and 6.5 minutes in peak hours (between Ameerpet-Nagole),, though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.
In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari. Hyderabad Metro timings are available on T-Savari app. Ola Cabs and Uber tied up its services with app.
COST
The initial official estimated cost of the 72 km long Metro project stood at ₹14,132 crore (US$2.0 billion). The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost. The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to ₹15,957 crore (US$2.2 billion). This has been further revised upwards to ₹18,800 crore (US$2.6 billion) (as of November 2017).
INFRASTRUCTURE
The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25kV ac 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).
CBTC TECHNOLOGY
At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales will supply its SelTrac CBTC technology, and trains will initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).
ROLLING STOCK
On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem. The ₹18 billion (US$250 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage. On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad. The trains will be 3.2m wide and 4m high. There will be 4 doors on each side of each coach.
On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014. On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.
TICKETING
The L&T Hyderabad project will have an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It will also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues. Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.
Official ticket prices were announced on 25 November 2017. The base fare is ₹10 for up to 2 km and going to slap 10 with ₹60 for more than 26 km.
STATIONS
Hyderabad metro will have 64 stations in phase I. They will be provided with amenities such as escalators and elevators to reach the stations, announcement boards, electronic display systems among others for passengers. Commercial will also be provided on stations. Hyderabad metro stations will also have service roads underneath them to provide last mile connectivity by allowing other public transportation systems use it for dropping/picking passengers right in front of the stations and ensure uninterrupted traffic. Currently the service lane works are currently on at Nagole and Uppal stations. The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.
Otis Elevator Company of United States won the contract to supply and maintain 670 elevators.
In May 2018, L&T Metro Rail announced that it had signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations. L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.
WIKIPEDIA
The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is in Secant Operational model. It is being implemented entirely on public-private partnership (PPP) basis, with the state government holding a minority equity stake. A 30 km stretch from Miyapur to Nagole, having 24 stations was inaugurated on 28 November 2017 by Prime Minister Narendra Modi. No other rapid transit metro service in India opened for public operations on such a long stretch of 30 km. As of October 2018, it is the second longest operational metro network in India after the Delhi Metro, after a 16 km stretch between Ameerpet-LB Nagar Metro route was opened on 24 September 2018. It is estimated to cost ₹18,800 crore (US$2.6 billion). As of October 2018, about 200,000 people use the Metro per day. Trains are now crowded during the morning and evening hours, when employees travel to and from work. A ladies only coach was introduced on all the trains from 7 May 2018.
HISTORY
To respond the rising public transport needs and mitigate escalating vehicular traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in [August] 2003. The increase in population of Hyderabad made MMTS alone insufficient for public transport, which led to Union Ministry of Urban Development giving the nod for the Hyderabad Metro Rail Project and directed the DMRC to conduct a survey on the project.[ this project was seen necessary in view that the population of Hyderabad was forecasted to reach 13.6 million by the year 2021. According to the initial plan, the metro was to be connected with the already existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.
On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad.
INITIAL BIDDING
The bidding process was completed by July 2008 and awarded to Maytas which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.
RE-BIDDING
In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the ₹121.32 billion (US$1.7 billion) project. L&T came forward to take up the work for about ₹14.58 billion (US$200 million) as viability gap funding as against the sanctioned ₹48.53 billion (US$680 million).
MASCOT
The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.
AWARDS AND NOMINATIONS
HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.
L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management category.
In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council’s (IGBC) Green MRTS Platinum Award.
CONSTRUCTION HISTORY
Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012 the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II. The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets. If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.
The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015.
In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.
The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015. The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.
CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016. Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.
The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.
In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.
Ameerpet-LB Nagar Metro stretch is open for commercial operations from 24 September 2018.
CONSTRUCTION PHASES
The construction work was undertaken in two phases. There are six stages of completion in Phase I
PHASE I
The Phase I of the project includes 3 lines covering a distance of around 72 km. The metro rail stretches between Nagole and Secunderabad 11 km originally scheduled to be operational by December 2015, is now partially operational since 29 November 2017. The entire 72 km 57-station first phase is due to be completed by December 2019 with Hitec City - Raidurg line and MGBS - Falaknuma line is scheduled to be completed by December 2019.
Line 1 - Red Line - Miyapur – L B Nagar - 29.2 km
Line 2 - Green Line - JBS - Falaknuma 15 km
Line 3 - Blue Line - Nagole – Raidurg - 28 km
PHASE II
The Government is planning second phase of metro rail extending further. The construction of Phase II will be taken up solely by the state government, instead of public private partnership (PPP) mode in Phase I. Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II. Metro Rail Phase II expansion plan is for about 60 km, which includes providing link to Shamshabad RGI Airport.
LINES
Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color. Ameerpet- LB Nagar metro stretch opened on 24 September 2018. HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is scheduled to be completed in November 2019, as it involves construction of 49 pillars and the Raidurg terminal station. Efforts are being made to complete the 8.5-km stretch from Ameerpet to HiTec City by December 2018.
RECEPTION
The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1. On the first Sunday of operations, the Metro was used by 240,000 people.. As of September 2018, the daily ridership was about 2,00,000.
Trains are initially being operated at a frequency of 3.5 minutes in very peak hours and every 6.5 minutes in peak hours (between Miyapur-Ameerpet) and 6.5 minutes in peak hours (between Ameerpet-Nagole),, though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.
In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari. Hyderabad Metro timings are available on T-Savari app. Ola Cabs and Uber tied up its services with app.
COST
The initial official estimated cost of the 72 km long Metro project stood at ₹14,132 crore (US$2.0 billion). The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost. The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to ₹15,957 crore (US$2.2 billion). This has been further revised upwards to ₹18,800 crore (US$2.6 billion) (as of November 2017).
INFRASTRUCTURE
The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25kV ac 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).
CBTC TECHNOLOGY
At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales will supply its SelTrac CBTC technology, and trains will initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).
ROLLING STOCK
On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem. The ₹18 billion (US$250 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage. On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad. The trains will be 3.2m wide and 4m high. There will be 4 doors on each side of each coach.
On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014. On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.
TICKETING
The L&T Hyderabad project will have an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It will also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues. Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.
Official ticket prices were announced on 25 November 2017. The base fare is ₹10 for up to 2 km and going to slap 10 with ₹60 for more than 26 km.
STATIONS
Hyderabad metro will have 64 stations in phase I. They will be provided with amenities such as escalators and elevators to reach the stations, announcement boards, electronic display systems among others for passengers. Commercial will also be provided on stations. Hyderabad metro stations will also have service roads underneath them to provide last mile connectivity by allowing other public transportation systems use it for dropping/picking passengers right in front of the stations and ensure uninterrupted traffic. Currently the service lane works are currently on at Nagole and Uppal stations. The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.
Otis Elevator Company of United States won the contract to supply and maintain 670 elevators.
In May 2018, L&T Metro Rail announced that it had signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations. L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.
WIKIPEDIA
The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is in Secant Operational model. It is being implemented entirely on public-private partnership (PPP) basis, with the state government holding a minority equity stake. A 30 km stretch from Miyapur to Nagole, having 24 stations was inaugurated on 28 November 2017 by Prime Minister Narendra Modi. No other rapid transit metro service in India opened for public operations on such a long stretch of 30 km. As of October 2018, it is the second longest operational metro network in India after the Delhi Metro, after a 16 km stretch between Ameerpet-LB Nagar Metro route was opened on 24 September 2018. It is estimated to cost ₹18,800 crore (US$2.6 billion). As of October 2018, about 200,000 people use the Metro per day. Trains are now crowded during the morning and evening hours, when employees travel to and from work. A ladies only coach was introduced on all the trains from 7 May 2018.
HISTORY
To respond the rising public transport needs and mitigate escalating vehicular traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in [August] 2003. The increase in population of Hyderabad made MMTS alone insufficient for public transport, which led to Union Ministry of Urban Development giving the nod for the Hyderabad Metro Rail Project and directed the DMRC to conduct a survey on the project.[ this project was seen necessary in view that the population of Hyderabad was forecasted to reach 13.6 million by the year 2021. According to the initial plan, the metro was to be connected with the already existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.
On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad.
INITIAL BIDDING
The bidding process was completed by July 2008 and awarded to Maytas which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.
RE-BIDDING
In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the ₹121.32 billion (US$1.7 billion) project. L&T came forward to take up the work for about ₹14.58 billion (US$200 million) as viability gap funding as against the sanctioned ₹48.53 billion (US$680 million).
MASCOT
The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.
AWARDS AND NOMINATIONS
HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.
L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management category.
In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council’s (IGBC) Green MRTS Platinum Award.
CONSTRUCTION HISTORY
Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012 the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II. The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets. If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.
The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015.
In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.
The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015. The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.
CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016. Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.
The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.
In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.
Ameerpet-LB Nagar Metro stretch is open for commercial operations from 24 September 2018.
CONSTRUCTION PHASES
The construction work was undertaken in two phases. There are six stages of completion in Phase I
PHASE I
The Phase I of the project includes 3 lines covering a distance of around 72 km. The metro rail stretches between Nagole and Secunderabad 11 km originally scheduled to be operational by December 2015, is now partially operational since 29 November 2017. The entire 72 km 57-station first phase is due to be completed by December 2019 with Hitec City - Raidurg line and MGBS - Falaknuma line is scheduled to be completed by December 2019.
Line 1 - Red Line - Miyapur – L B Nagar - 29.2 km
Line 2 - Green Line - JBS - Falaknuma 15 km
Line 3 - Blue Line - Nagole – Raidurg - 28 km
PHASE II
The Government is planning second phase of metro rail extending further. The construction of Phase II will be taken up solely by the state government, instead of public private partnership (PPP) mode in Phase I. Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II. Metro Rail Phase II expansion plan is for about 60 km, which includes providing link to Shamshabad RGI Airport.
LINES
Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color. Ameerpet- LB Nagar metro stretch opened on 24 September 2018. HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is scheduled to be completed in November 2019, as it involves construction of 49 pillars and the Raidurg terminal station. Efforts are being made to complete the 8.5-km stretch from Ameerpet to HiTec City by December 2018.
RECEPTION
The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1. On the first Sunday of operations, the Metro was used by 240,000 people.. As of September 2018, the daily ridership was about 2,00,000.
Trains are initially being operated at a frequency of 3.5 minutes in very peak hours and every 6.5 minutes in peak hours (between Miyapur-Ameerpet) and 6.5 minutes in peak hours (between Ameerpet-Nagole),, though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.
In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari. Hyderabad Metro timings are available on T-Savari app. Ola Cabs and Uber tied up its services with app.
COST
The initial official estimated cost of the 72 km long Metro project stood at ₹14,132 crore (US$2.0 billion). The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost. The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to ₹15,957 crore (US$2.2 billion). This has been further revised upwards to ₹18,800 crore (US$2.6 billion) (as of November 2017).
INFRASTRUCTURE
The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25kV ac 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).
CBTC TECHNOLOGY
At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales will supply its SelTrac CBTC technology, and trains will initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).
ROLLING STOCK
On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem. The ₹18 billion (US$250 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage. On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad. The trains will be 3.2m wide and 4m high. There will be 4 doors on each side of each coach.
On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014. On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.
TICKETING
The L&T Hyderabad project will have an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It will also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues. Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.
Official ticket prices were announced on 25 November 2017. The base fare is ₹10 for up to 2 km and going to slap 10 with ₹60 for more than 26 km.
STATIONS
Hyderabad metro will have 64 stations in phase I. They will be provided with amenities such as escalators and elevators to reach the stations, announcement boards, electronic display systems among others for passengers. Commercial will also be provided on stations. Hyderabad metro stations will also have service roads underneath them to provide last mile connectivity by allowing other public transportation systems use it for dropping/picking passengers right in front of the stations and ensure uninterrupted traffic. Currently the service lane works are currently on at Nagole and Uppal stations. The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.
Otis Elevator Company of United States won the contract to supply and maintain 670 elevators.
In May 2018, L&T Metro Rail announced that it had signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations. L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.
WIKIPEDIA
India Prime Minister Narendra Modi arriving at the Vancouver International Airport aboard Air India Boeing 747-437, registration VT-EVB.
Secretary of State Antony J. Blinken and Indian Prime Minister Narendra Modi deliver remarks at a U.S.-India Strategic Partnership Forum event at the Kennedy Center in Washington, DC, on June 23, 2023. [State Department photo by James Pan/Public Domain]
Kuvien käyttöehdot - Villkor för att använda bilderna - Use and rights
© Pia Lundström/Suomen Tukholman suurlähetystö
Image Courtesy: Narendra Modi (www.flickr.com/photos/narendramodiofficial/13990390932), Licensed under the Creative Commons Attribution-ShareAlike 2.0 Generic | Flickr
Secretary of State Antony J. Blinken and Indian Prime Minister Narendra Modi deliver remarks at a U.S.-India Strategic Partnership Forum event at the Kennedy Center in Washington, DC, on June 23, 2023. [State Department photo by James Pan/Public Domain]
Prime Minister Shri Narendra Modi met H. E. Mr. Macky Sall, President of Senegal and Chairman of the African Union in Bali
Secretary of State Antony J. Blinken and Indian Prime Minister Narendra Modi deliver remarks at a U.S.-India Strategic Partnership Forum event at the Kennedy Center in Washington, DC, on June 23, 2023. [State Department photo by James Pan/Public Domain]
Prayut Chan-o-cha, Prime Minister of Thailand and Narendra Modi, Prime Minister of India at the State Luncheon hosted by the Secretary-General for the Heads of Delegation to the 74th Session of the United Nations General Assembly.
UN Photo/Kim Haughton
24 September 2019
United Nations, New York
Photo # 823394
Kuvien käyttöehdot - Villkor för att använda bilderna - Use and rights
© Pia Lundström/Suomen Tukholman suurlähetystö
U.S. Secretary of State John Kerry's table setting is shown before the beginning of a luncheon he co-hosted with U.S. Vice President Biden in honor of the visit of Indian Prime Minister Narendra Modi at the U.S. Department of State in Washington, D.C., on September 30, 2014. [State Department photo/ Public Domain]
Kuvien käyttöehdot - Villkor för att använda bilderna - Use and rights
© Niina Hyrsky/Suomen Tukholman suurlähetystö
Kuvien käyttöehdot - Villkor för att använda bilderna - Use and rights
© Niina Hyrsky/Suomen Tukholman suurlähetystö
Kuvien käyttöehdot - Villkor för att använda bilderna - Use and rights
© Anne Sjöholm/valtioneuvoston kanslia
सेना के एक लेफ्टिनेंट जनरल ने नाम न छपने की शर्त पर बताया की आप खुद सोचिये क्या भारत का सेना प्रमुख किसी राज्य सरकार का तख्ता पलट सकता है ???? कोई मुर्ख ही इस बात पर यकीन करेगा की एक सेना प्रमुख एक राज्य सरकार और वो जम्मू कश्मीर का तख्ता पलते .. अगर केंद्र का तख्ता पलटने का आरोप लगाते तो इस पर थोडा बहुत यकीन भी हो सकता था लेकिन एक जनरल को किसी राज्य का तख्ता पलट करने में क्या मिलेगा ???
असल में जबसे जनरल वीके सर मोदी जी के साथ गये है तब से सारे सैनिक और पूर्व सैनिक और सेना के अधिकारी मोदी जी वो ही वोट देंगे इसलिए केंद्र सरकार जनरल साहब को फंसा रही है |
लेकिन सत्ता की मोह में अंधे लोगो ने ये भी नही सोचा की इससे सेना के अधिकारियो के मनोबल पर कितना प्रतिकूल प्रभाव पड़ेगा
Prime Minister Shri Narendra Modi was conferred with the Grand Cross of the Legion of Honour, France's highest award by H.E. Mr. Emmanuel Macron, President of the Republic of France
Prime Minister Shri Narendra Modi arrived in Cairo on his first State visit to Egypt received by H.E. Mr. Mostafa Madbouly, Prime Minister of Egypt at the airport
Secretary of Defense Chuck Hagel, left, meets with Narendra Modi, center left, the prime minister of India, at the Blair House in Washington, D.C., Sept 30, 2014. (DoD photo by Master Sgt. Adrian Cadiz, U.S. Air Force/Released)
U.S. Secretary of State John Kerry shakes hands with Indian Prime Minister Narendra Modi before a bilateral meeting. Shortly before, the two addressed the opening plenary session of the 7th Vibrant Gujarat Summit in Gandhinagar, India, on January 11, 2015. [State Department photo/ Public Domain]
Prime Minister Shri Narendra Modi extends a warm welcome to Prime Minister of United Kingdom Rt Hon’ble Boris Johnson MP of UK at the forecourt of Rashtrapati Bhavan.
President Kagame and Indian Prime Minister Narendra Modi preside over India- Rwanda Business forum. Kigali, 24 July 2018.