View allAll Photos Tagged NASASLS
NASA will hold a media teleconference at 6 p.m. EDT Tuesday, Aug. 30, to discuss the flight test of the agency’s mega Moon rocket and uncrewed Orion spacecraft, currently at Launch Pad 39B at NASA’s Kennedy Space Center in Florida, ahead of the #Artemis I lunar mission.
NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, the Space Launch System (SLS) rocket, and supporting ground systems. In this image, the SLS rocket with the Orion spacecraft aboard is seen atop the mobile launcher at Launch Pad 39B on Monday, Aug. 29, 2022.
Image credit: NASA/Keegan Barber
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #ArtemisI #KSC #NASAKennedy
Engineers with Exploration Ground Systems and contractor Jacobs successfully completed the Umbilical Release and Retract Test on Sept. 19 inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in preparation for the Artemis I mission.
The umbilicals will provide power, communications, coolant, and fuel to the rocket and the Orion spacecraft while at the launch pad until they disconnect and retract at ignition and liftoff.
This is a close-up view of the Artemis I Space Launch System rocket inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Sept. 20, 2021. All 10 levels of work platforms have been retracted from around the rocket as part of the umbilical release and retract test. During the test, several umbilical arms on the mobile launcher were extended to connect to the SLS rocket and then swung away from the launch vehicle, just as they will on launch day. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars. Photo credit: NASA/Frank Michaux
Image Credit: NASA/Frank Michaux
#NASA #space #moon #Mars #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #Orion #KSC #KennedySpaceCenter #ArtemisI
Around 8:30 a.m. EDT on Nov. 4, the Space Launch System rocket and Orion spacecraft for the Artemis I mission arrived at launch pad 39B at NASA’s Kennedy Space Center in Florida after a nearly nine-hour journey from the Vehicle Assembly Building. Teams will continue working to configure SLS and Orion for the upcoming Nov. 14. launch attempt.
Here, NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop the mobile launcher as it arrives at Launch Pad 39B, Friday, Nov. 4, 2022, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I mission is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for Nov. 14 at 12:07 a.m. EST.
Image Credit: NASA/Joel Kowsky
#NASA #NASAMarshall #ArtemisI #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #KSC #KennedySpaceCenter
NASA and the Canadian Space Agency (CSA) announced the four astronauts who will venture around the Moon on Artemis II, the first crewed mission on NASA’s path to establishing a long-term presence at the Moon for science and exploration through Artemis. The agencies revealed the crew members Monday during an event at Ellington Field near NASA’s Johnson Space Center in Houston.
“The Artemis II crew represents thousands of people working tirelessly to bring us to the stars. This is their crew, this is our crew, this is humanity's crew,” said NASA Administrator Bill Nelson. “NASA astronauts Reid Wiseman, Victor Glover, and Christina Hammock Koch, and CSA astronaut Jeremy Hansen, each has their own story, but, together, they represent our creed: E pluribus unum – out of many, one. Together, we are ushering in a new era of exploration for a new generation of star sailors and dreamers – the Artemis Generation.”
The crew assignments are as follows: (left to right) Mission Specialist 1 Christina Hammock Koch, Commander Reid Wiseman (seated), Pilot Victor Glover, and Mission Specialist 2 Jeremy Hansen. They will work as a team to execute an ambitious set of demonstrations during the flight test.
Image credit: NASA
#NASA #NASAMarshall #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #MichoudAssemblyFacility #ArtemisII #Astronauts
On Nov. 20, the fifth day of the 25.5-day Artemis I mission, a camera mounted on the tip of one of Orion’s solar array wings captured this footage of the spacecraft and the Moon as it continued to grow nearer to our lunar neighbor.
The spacecraft entered the lunar sphere of influence at 2:09 p.m. EST, making the Moon, instead of Earth, the main gravitational force acting on the spacecraft. Orion completed its first flyby on the morning of Nov. 21, 2022.
Follow Orion’s journey by visiting the Artemis I blog.
Image Credit: NASA
#NASA #NASAMarshall #ArtemisI #Orion #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #ArtemisI
A full Moon is in view from Launch Complex 39B at NASA’s Kennedy Space Center in Florida on June 14, 2022. The Artemis I Space Launch System (SLS) and Orion spacecraft, atop the mobile launcher, are being prepared for a wet dress rehearsal to practice timelines and procedures for launch. The first in an increasingly complex series of missions, Artemis I will test SLS and Orion as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone on the way to Mars. The next wet dress rehearsal attempt for the #Artemis I mission is set to begin tomorrow with a “call to stations”. Although the first flight of NASA’s Space Launch System rocket and Orion spacecraft will not have a crew of astronauts on board, there are several experienced teams of people behind the mission.
Image Credit: NASA/Cory Huston
#NASA #space #moon #Mars #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis
On the second day of the 25.5-day Artemis I mission, Orion used its optical navigation camera to snap black and white photos of planet Earth.
Image credit: NASA
#NASA #NASAMarshall #ArtemisI #Orion #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #ArtemisI
The sunrise casts a warm glow around the Artemis I Space Launch System (SLS) and Orion spacecraft at Launch Pad 39B at NASA’s Kennedy Space Center in Florida on March 21, 2022. The SLS and Orion atop the mobile launcher were transported to the pad on crawler-transporter 2 for a prelaunch test called a wet dress rehearsal. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.
Image Credit: NASA/Ben Smegelsky
#MoontoMars #NASAMarshall #nasasls #artemis #NASA
NASA’s Space Launch System rocket with the Orion spacecraft for Artemis I arrived to Launch Pad 39B at Kennedy Space Center in Florida Nov. 4. Launch of the uncrewed Artemis I flight test is targeted for Nov. 14.
Image Credit: NASA/Joel Kowsky
#NASA #NASAMarshall #ArtemisI #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #KSC #KennedySpaceCenter
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Complex 39B, Thursday, April 7, 2022, as the Artemis I launch team prepares for the next attempt of the wet dress rehearsal test at NASA’s Kennedy Space Center in Florida.
Image Credit: NASA
#MoontoMars #NASAMarshall #nasasls #artemis #NASA
Crews transported the heat shield skin for a future mission of NASA's Orion spacecraft -- via the agency's Super Guppy oversize cargo transport aircraft -- to Moffett Federal Airfield on Nov. 9. The heat shield skin for the Artemis IV mission, the third crewed mission to the Moon, is now at Moffett Federal Airfield near NASA's Ames Research Center in California's Silicon Valley, for the next phase of production.
Orion's heat shield protects the spacecraft and the astronauts inside the capsule from the intense heat generated while re-entering Earth's atmosphere. When the spacecraft re-enters at roughly 25,000 miles per hour, the heat shield will experience extreme temperatures at about 5,000 degrees Fahrenheit, or about half as hot as the sun. The heat shield has an underlying titanium skeleton covered by a carbon fiber skin. More than 180 unique blocks are bonded to the heat shield's skin and will slowly burn away as the spacecraft travels through Earth's atmosphere during re-entry.
Unlike other aircraft, the Super Guppy aircraft has a specially designed hinged nose that opens to an angle of 110 degrees so that cargo can be loaded and unloaded from its belly. The aircraft's unique shape also allows it to carry bulky or heavy hardware that would not otherwise fit on traditional aircraft.
Image Credit: NASA
#NASA #space #moon #Mars #Moon2Mars #MoontoMars #NASAMarshall #msfc #AmesResearchCenter #ARC #NASAames #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #Orion #superguppy
NASA conducted another long-duration hot fire of an RS-25 engine May 10, continuing to pave the way for production of new engines for future deep space missions. Operators at the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, fired an RS-25 certification engine for more than 10 minutes (630 seconds). The test duration is longer than the 500 seconds the engines must fire to help launch the Space Launch System rocket on Artemis missions and helps provide a margin of operational safety. The engine also fired at 111% power level, the same level of thrust needed during launch, and at 113%, allowing operators to provide a margin of operational safety. The May 10 hot fire marked the seventh in a 12-test series designed to certify production of new RS-25 engines for future Artemis missions by lead contractor Aerojet Rocketdyne. Four RS-25 engines fire simultaneously, producing up to 2 million pounds of combined thrust, to help power each SLS launch.
Image credit: NASA
#NASA #NASAMarshall #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #ssc #StennisSpaceCenter #Stennis
NASA, "Marshall Space Flight Center", MSFC, rocket, space, Artemis, "Space Launch System", Moon2Mars, rocket, "rocket engine", space, SSC, "Stennis Space Center",
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen at sunrise atop the mobile launcher as it arrives at Launch Pad 39B, Wednesday, Aug. 17, 2022, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Aug. 29.
Image credit: NASA/Joel Kowsky
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #ArtemisI
NASA’s newly redesigned RS-25 engine for future flights of the Space Launch System (SLS) rocket underwent its first hot fire test of the year on Feb. 8 at the agency’s Stennis Space Center near Bay St. Louis, Mississippi. NASA continued testing with a second test Feb. 22.
The series of testing supports production of new RS-25 engines by lead SLS engine contractor Aerojet Rocketdyne. The new engines will help power future Artemis missions to the Moon beginning with Artemis V as NASA explores the universe for the benefit of all.
In this image, a remote camera offers a close-up view of the Feb. 8 RS-25 hot fire on the Fred Haise Test Stand.
Image credit: NASA
#NASA #NASAMarshall #ArtemisI #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #SSC #StennisSpaceCenter
A paddlewheeler makes its way up the Mississippi River as the Moon rises over New Orleans on Sunday evening, Aug. 22, 2021. The August Sturgeon Moon, which was also a rare Blue Moon, was full at 7:02 a.m. local time Sunday but the nearly full Moon still put on a show when it rose over New Orleans later that evening. New Orleans is home to the NASA Michoud Assembly Facility, where the core stage of the Space Launch System that will return people to the Moon was built.
Image credit: NASA/Michael DeMocker
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #MichoudAssemblyFacility #NASAMichoud #NewOrleans
The Orion spacecraft for NASA’s Artemis I mission, fully assembled with its launch abort system, is lifted above the Space Launch System (SLS) rocket in High Bay 3 of the Vehicle Assembly Building at Kennedy Space Center in Florida. The stacking of Orion on top of the SLS completes assembly for the Artemis I flight test. Teams will begin conducting a series of verification tests ahead of rolling out to Launch Complex 39B for the Wet Dress Rehearsal. Artemis I will be an uncrewed test flight of the Orion spacecraft and Space Launch System rocket as an integrated system ahead of crewed flights to the Moon. Under Artemis, NASA aims to land the first woman and first person of color on the Moon and establish sustainable lunar exploration.
Image Credit: NASA/Frank Michaux
#NASA #space #moon #Mars #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #Orion #KSC #KennedySpaceCenter
NASA completed its penultimate hot fire June 15 in a key test series to certify production of new RS-25 engines for NASA’s SLS (Space Launch System) rocket that will help power future Artemis missions to the Moon and continue the agency’s efforts to explore the secrets of the universe for the benefit of all.
More than 500 NASA Stennis, NASA Shared Services Center, and NASA contractor employees and family members viewed the hot fire on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, which marked the 11th in the 12-test series. The final test of the series is scheduled June 22 and will set the stage for SLS engines lead contractor Aerojet Rocketdyne to manufacture new RS-25 engines for future deep space missions, beginning with Artemis V.
Image credit: NASA
#NASA #NASAMarshall #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #ssc #StennisSpaceCenter #Stennis
NASA will hold a media teleconference on Monday, March 14, to discuss the upcoming debut of the agency’s mega Moon rocket and integrated spacecraft for the uncrewed Artemis I lunar mission. Rollout of the integrated Space Launch System rocket and Orion spacecraft to Launch Pad 39B at NASA’s Kennedy Space Center in Florida is slated for Thursday, March 17. In this image, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, work platforms are being retracted from around the Artemis I Space Launch System rocket and Orion spacecraft in preparation to roll out for testing.
Image Credit: NASA
#MoontoMars #NASAMarshall #nasasls #artemis #NASA
This composite made from 10 images shows the progression of the Moon during a total lunar eclipse above the Vehicle Assembly Building, Nov. 8, 2022, at NASA’s Kennedy Space Center in Florida. Visible trailing the Moon in this composite is Mars.
For North America, the partial eclipse began at 4:09 a.m. EST, with totality beginning at 5:16 a.m. One feature of a total lunar eclipse is the Moon’s red hue during totality. The red color occurs because of the refraction, filtering, and scattering of light by Earth’s atmosphere.
Image Credit: NASA/Joel Kowsky
#NASA #NASAMarshall #ArtemisI #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #KSC #KennedySpaceCenter
The Earth is seen setting from the far side of the Moon just beyond the Orion spacecraft in this video taken on the sixth day of the Artemis I mission by a camera on the tip of one of Orion’s solar arrays. The spacecraft was preparing for the Outbound Powered Flyby maneuver which would bring it within 80 miles of the lunar surface, the closest approach of the uncrewed Artemis I mission, before moving into a distant retrograde orbit around the Moon. The spacecraft entered the lunar sphere of influence Sunday, Nov. 20, making the Moon, instead of Earth, the main gravitational force acting on the spacecraft.
Image credit: NASA
#NASA #NASAMarshall #ArtemisI #Orion #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #ArtemisI
NASA conducted its second RS-25 engine hot fire test of the new year Feb. 8 on the Fred Haise Test Stand at Stennis Space Center near Bay St. Louis, Mississippi. The test was the third hot fire in the latest test series that began in mid-December. NASA is testing RS-25 engines to help power the agency's Space Launch System (SLS) rocket on future deep-space missions. Four RS-25 engines will generate a combined 2 million pounds of thrust to power SLS’s ascent.
Image Credit: NASA
#MoontoMars #NASAMarshall #nasasls #artemis #NASA
T-38 planes are a fixture of astronaut training, assisting pilots and mission specialists to think quickly in changing situations. Here, our T-38s fly in formation above the Space Launch System (SLS) rocket on Launch Pad 39B. The SLS and Orion spacecraft for the Artemis I mission will launch no earlier than Aug. 29, 2022.
Astronaut Andrew Morgan posted this and two other photos on Twitter on Aug. 25, 2022, saying “This week we flew over @NASAArtemis, thanking the @nasa centers across the country that put this Moon rocket on @NASAKennedy’s pad and celebrating the upcoming test flight!”
Image credit: NASA/Josh Valcarcel
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #ArtemisI #KSC #NASAKennedy
Earth's Moon is seen rising behind NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard atop a mobile launcher as it rolls out to Launch Complex 39B for the first time, Thursday, March 17, 2022, at NASA’s Kennedy Space Center in Florida. Ahead of the Artemis I flight test, the fully stacked and integrated SLS rocket and Orion spacecraft will undergo a wet dress rehearsal to verify systems and practice countdown procedures for the first launch.
Image Credit: NASA/Aubrey Gemignani
#MoontoMars #NASAMarshall #nasasls #artemis #NASA
NASA's Orion spacecraft has completed its return-powered flyby burn! The spacecraft is scheduled to return to Earth on Dec. 14. Here, a camera on Orion captures the moon as it flies by on Dec. 5.
Meanwhile, continue to check out live views of the #Artemis I mission, when the bandwidth allows, HERE >> https://www.nasa.gov/artemislive
Image credit: NASA
#NASA #NASAMarshall #ArtemisI #Orion #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #ArtemisI
Farewell 2022! Looking back on a historic year for NASA, there were great accomplishments, such as the first images from the James Webb Space Telescope and the Double Asteroid Redirection Test (DART) mission success. But the high point has to be the launch and return to Earth of the Artemis I mission. Here is an image of NASA’s Space Launch System rocket carrying the Orion spacecraft into space on the Artemis I flight test, Wednesday, Nov. 16, 2022, from Launch Complex 39B at NASA’s Kennedy Space Center in Florida.
Image credit: NASA/Joel Kowsky
#NASA #NASAMarshall #ArtemisI #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #KSC #KennedySpaceCenter
With wildflowers surrounding the view, NASA’s Space Launch System (SLS) Moon rocket – carried atop the Crawler-Transporter 2 – arrives at Launch Pad 39B at the agency’s Kennedy Space Center in Florida on June 6, 2022.
The first in an increasingly complex series of missions, Artemis I will test the SLS rocket and Orion spacecraft as an integrated system prior to crewed flights to the Moon. Through Artemis, NASA will land the first woman and first person of color on the lunar surface, paving the way for a long-term lunar presence and using the Moon as a steppingstone before venturing to Mars.
Image credit: NASA/Ben Smegelsky
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #NASAKennedy #KennedySpaceCenter
Snoopy, the zero gravity indicator that flew aboard Orion during the Artemis I mission, wears a smile after being unpacked from his transport case on Jan. 5, 2023.
Zero gravity indicators are small items carried aboard spacecraft that provide a visual indicator when a spacecraft has reached the weightlessness of microgravity. NASA has held an association with Snoopy since the Apollo Era – the character has contributed to the excitement for NASA human spaceflight missions, helping inspire generations to dream big, and is a symbol of NASA’s safety culture and mission success.
Image Credit: NASA/Isaac Watson
#NASA #NASAMarshall #Artemis #NASA #SLS #SpaceLaunchSystem #NASASLS #exploration #rocket
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Pad 39B. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Aug. 29.
Image credit: NASA/Ben Smegelsky
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #ArtemisI #KSC #NASAKennedy
NASA’s newly redesigned RS-25 engine for future flights of the Space Launch System (SLS) rocket, underwent its first hot fire test of the year on Feb. 8 at the agency’s Stennis Space Center near Bay St. Louis, Mississippi.
The series of testing supports production of new RS-25 engines by lead SLS engine contractor Aerojet Rocketdyne. The new engines will help power future Artemis missions to the Moon beginning with Artemis V as NASA explores the universe for the benefit of all.
Image Credit: NASA/Isaac Watson
#NASA #NASAMarshall #Artemis #NASA #SLS #SpaceLaunchSystem #NASASLS #exploration #rocket
NASA conducted its first RS-25 engine hot fire test of the new year Jan. 19 on the Fred Haise Test Stand at Stennis Space Center near Bay St. Louis, Mississippi. The test was the second hot fire in the latest series that began in mid-December. Each test in the series is providing valuable operational data to NASA's lead contractor, Aerojet Rocketdyne, on a variety of new engine components manufactured with state-of-the-art fabrication techniques as the company begins production of new RS-25 engines. These engines will help power the agency's Space Launch System (SLS) rocket on future deep-space missions. During launch, four RS-25 engines will power the SLS, generating a combined 2 million pounds of thrust during ascent. The RS-25 engines for the first four SLS flights are upgraded space shuttle main engines and have completed certification testing. NASA will use the data from this test to enhance production of new RS-25 engines and components for use on subsequent SLS missions. The testing is part of NASA's and Aerojet Rocketdyne's effort to use advanced manufacturing methods to significantly reduce the cost and time needed to build new engines.
Image Credit: NASA
#MoontoMars #NASAMarshall #nasasls #artemis #NASA
Crews with NASA’s Exploration Ground Systems and contractor Jacobs stacked the launch vehicle stage adapter atop the core stage June 22 at the agency’s Kennedy Space Center in Florida for the Artemis I mission, the first integrated flight test of SLS and NASA’s Orion spacecraft. The 30-foot-tall, cone-shaped piece of hardware connects the SLS rocket’s upper and lower propulsion stages. The adapter also houses the RL10 engine that powers the Interim Cryogenic Propulsion Stage that will send Orion on a precise trajectory to the Moon.
Image Credit: NASA
#NASA #space #moon #Mars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #KSC #KennedySpaceCenter
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft is seen atop a mobile launcher on June 6, 2022, at NASA’s Kennedy Space Center in Florida.
Image Credit: NASA
#NASA #space #moon #Mars #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft atop arrived at Launch Pad 39B at the agency’s Kennedy Space Center in Florida Friday in preparation for a final test before its Artemis I Moon mission. The uncrewed flight test will pave the way for missions to land the first woman and first person of color on the Moon under Artemis, and the rocket rolled to the pad for a final test before launch.
Image Credit: NASA
#MoontoMars #NASAMarshall #nasasls #artemis #NASA
NASA has completed the design certification review (DCR) for the Space Launch System Program (SLS) rocket ahead of the Artemis I mission to send the Orion spacecraft to the Moon. This close-up view shows the SLS rocket for Artemis I inside High Bay 3 of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on Sept. 20, 2021. Inside the VAB, the rocket recently completed the umbilical retract and release test and the integrated modal test. With the completion of the SLS design, NASA has now certified the SLS and Orion spacecraft designs, as well as the new Launch Control Center at Kennedy for the Artemis I mission.
Image Credit: NASA/Frank Michaux
#NASA #space #moon #Mars #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #Orion #KSC #KennedySpaceCenter #ArtemisI #VAB #VehicleAssemblyBuilding
NASA achieved a key milestone June 22, completing an initial certification test series designed to pave the way for production of new RS-25 engines to help power NASA’s SLS (Space Launch System) rocket on future Artemis missions to the Moon, beginning with #Artemis V.
Engineers conducted a full-duration test of more than eight minutes (500 seconds) on an RS-25 certification engine manufactured by SLS engines lead contractor Aerojet Rocketdyne. The engine incorporates dozens of improvements to make production more efficient and affordable while maintaining high performance and reliability. The test series on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, is designed to verify that the new engines meet all Artemis flight requirements.
The stage is now set for a second – and final – certification series to begin in early fall. Data from the certification tests will confirm all is good to go in producing new engines for use beginning with the Artemis V mission to the Moon as NASA continues its effort to explore the secrets of the universe for the benefit of all.
#NASA #NASAMarshall #NASAStennis #NASASLS #SLS #Rocket #Engines #EngineTest #NASAArtemis
On the sixth day of the Artemis I mission, Nov. 21, 2022, the Orion spacecraft’s optical navigation camera captured black-and-white images of craters on the Moon below. This photo and others captured are the closest photos of the Moon from a human-rated vessel since Apollo. The optical navigation camera takes black-and-white imagery of the Earth and the Moon at different phases and distances; this technology demonstration will help prove its effectiveness for future missions with crew.
Image credit: NASA
#NASA #NASAMarshall #ArtemisI #Orion #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #ArtemisI
When NASA’s Artemis I mission launches later this year, thousands of cameras will capture the historic first flight of NASA’s Space Launch System (SLS) rocket and Orion spacecraft.
Some cameras, though, are focused on carefully placed markings on the rocket, spacecraft, and mobile launcher. These cameras aim to capture portions of the countdown and launch and will provide valuable data to engineering teams following launch and flight.
A variety of black-and-white patterns are painted on the rocket and spacecraft and used as targets for the cameras. Some designs, like the checkered rings on each solid rocket booster, are used by cameras on the rocket. In the case of the black ring below the nose cone on the left-hand solid rocket booster, it allows the engineers to easily distinguish the right booster from the left since the vehicle is very symmetric and some of the cameras will have a tight field of view. Other patterns, though, are best viewed at a distance.
Image credit: NASA/Kim Shiflett
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #NASAKennedy #rocket #artemis1
NASA and Northrop Grumman will perform a full-scale static test of a Space Launch System (SLS) solid rocket booster motor at Northrop Grumman’s Promontory, Utah, test facility July 21. Engineers will fire the booster during the demonstration, called the Flight Support Booster 2 test, to evaluate materials and processes to improve boosters for future Artemis missions.
Teams installed the flight support booster into a test stand in Promontory, Utah. NASA and Northrop Grumman engineers are preparing to conduct a full-scale static test of the motor at the Northrop Grumman test facility July 21.
Image Credit: Northrop Grumman
#NASA #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #nasasls #rockets #exploration #artemis
The test on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, marked the eighth in a 12-test certification series that will support production of RS-25 engines by lead engine contractor Aerojet Rocketdyne for future Artemis missions, beginning with Artemis V. Engineers fired the RS-25 engine for almost eight-and-a-half minutes (500 seconds), the same amount of time it must operate to help send astronauts in the Orion spacecraft to space. The engine operated up to the 113% power level during the test, beyond the required 111% needed to get SLS to orbit. The increased power provides engineers with a margin of operational safety during testing.
Four RS-25 engines fire simultaneously to generate a combined 1.6 million pounds of thrust at launch and 2 million pounds of thrust during ascent to help power each SLS flight. Through Artemis, NASA will land the first woman and first person of color on the Moon and collaborate with commercial and international partners to establish the first long-term presence on the Moon. The agency will use what it learns on and around the Moon to then send the first astronauts to Mars.
Image Credit: NASA
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAStennis #SLS
NASA and Northrop Grumman will perform a full-scale static test of a Space Launch System (SLS) solid rocket booster motor at Northrop Grumman’s Promontory, Utah, test facility July 21. Engineers will fire the booster during the demonstration, called the Flight Support Booster 2 test, to evaluate materials and processes to improve boosters for future Artemis missions.
Teams installed the flight support booster for future versions of the SLS rocket’s solid rocket boosters into a test stand in Promontory, Utah. NASA and Northrop Grumman engineers are preparing to conduct a full-scale static test of the motor at the Northrop Grumman test facility July 21.
Image Credit: Northrop Grumman
#NASA #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #nasasls #rockets #exploration #artemis
The core stage for the first flight of NASA’s Space Launch System rocket is seen in the B-2 Test Stand during a second hot fire test, Thursday, March 18, 2021, at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. The four RS-25 engines fired for the full-duration of 8 minutes during the test and generated 1.6 million pounds of thrust. The hot fire test is the final stage of the Green Run test series, a comprehensive assessment of the Space Launch System’s core stage prior to launching the Artemis I mission to the Moon.
Credit: NASA
#NASA #space #moon #Mars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #SSC #StennisSpaceCenter
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop the mobile launcher at Launch Pad 39B, Friday, Nov. 11, 2022, at NASA’s Kennedy Space Center in Florida. Teams began walkdowns and inspections at the pad to assess the status of the rocket and spacecraft after the passage of Hurricane Nicole. NASA’s Artemis I flight test is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Nov. 16 at 1:04 a.m. EST.
Image credit: NASA/Joel Kowsky
#NASA #NASAMarshall #ArtemisI #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #KSC #KennedySpaceCenter
NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop a mobile launcher at Launch Pad 39B, Thursday, Aug. 18, 2022, after being rolled out to the launch pad at NASA’s Kennedy Space Center in Florida. NASA’s Artemis I mission is the first integrated test of the agency’s deep space exploration systems: the Orion spacecraft, SLS rocket, and supporting ground systems. Launch of the uncrewed flight test is targeted for no earlier than Aug. 29.
Image credit: NASA/Joel Kowsky
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #ArtemisI #KSC #NASAKennedy
Technicians at NASA’s Marshall Space Flight Center in Huntsville, Alabama, have completed applying thermal protection system material to the launch vehicle stage adapter (LVSA) of NASA’s SLS (Space Launch System) rocket for Artemis III, which will land astronauts on the Moon to advance long-term lunar exploration and scientific discovery and inspire the Artemis Generation. The LVSA is a cone-shaped element connecting the mega rocket’s core stage to its interim cryogenic propulsion stage (ICPS), partially enclosing it and protecting its avionics and electrical systems from the extreme pressures, sounds, and temperatures during launch and flight.
Teams at Marshall began applying the thermal protection system material earlier this spring. Unlike other parts of the SLS rocket, the thermal protection system material for the LVSA is applied entirely by hand using a spray gun. During application, the technicians use a thin measuring rod to gauge the proper thickness. Once the thermal protection system has cured, certain areas are sanded down to meet parameters. The entire process takes several months.
The LVSA is fully manufactured at Marshall by NASA, lead contractor Teledyne Brown Engineering, and the Jacobs Space Exploration Group’s ESSCA contract. The LVSA for Artemis III is the last of its kind as future SLS rockets will transition to its next, more powerful Block 1B configuration beginning with Artemis IV.
NASA is working to land the first woman and first person of color on the Moon under Artemis. SLS is part of NASA’s backbone for deep space exploration, along with the Orion spacecraft, advanced spacesuits and rovers, the Gateway in orbit around the Moon, and commercial human landing systems. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single mission.
Image credit: NASA/Brandon Hancock
#NASA #NASAMarshall #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis
Teams with NASA’s Exploration Ground Systems and contractor Jacobs lower the Space Launch System (SLS) core stage – the largest part of the rocket – onto the mobile launcher, in between the twin solid rocket boosters, inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on June 12, 2021. The 188,000-pound core stage, with its four RS-25 engines, will provide more than 2 million pounds of thrust during launch and ascent, and coupled with the boosters, will provide more than 8.8 million pounds of thrust to send the Artemis I mission to space. Under the Artemis program, NASA will land the first woman and first person of color on the Moon, as well as establish a sustainable presence on the lunar surface in preparation for human missions to Mars.
Image Credit: NASA/Cory Huston
#NASA #space #moon #Mars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #KSC #KennedySpaceCenter
Teams with NASA’s Exploration Ground Systems and contractor Jacobs lower the Space Launch System (SLS) core stage – the largest part of the rocket – onto the mobile launcher, in between the twin solid rocket boosters, inside High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on June 12, 2021.
Image Credit: NASA/Cory Huston
#NASA #space #moon #Mars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #KSC #KennedySpaceCenter
A single solid rocket booster motor fires up at Northrop Grumman’s test facility in Promontory, Utah, on July 21. The booster motor, positioned horizontally for the ground test, fired for a little over two minutes and produced 3.6 million pounds of thrust. The only way to conduct a ground test of the boosters without launching is in a horizontal test stand. The test aids in the development of future versions of the solid rocket boosters for the SLS rocket. Based on the space shuttle solid rocket boosters, the SLS boosters are the largest, most powerful solid propellant boosters ever built for flight.
Image Credit: Northrop Grumman
#NASA #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #nasasls #rockets #exploration #artemis
NASA’s Orion spacecraft is secured atop the agency’s powerful Space Launch System rocket, and the integrated system is entering the final phase of preparations for an upcoming uncrewed flight test around the Moon. The mission, known as Artemis I, will pave the way for a future flight test with crew before NASA establishes a regular cadence of more complex missions with astronauts on and around the Moon under Artemis. With stacking complete, a series of integrated tests now sit between the mega-Moon rocket and targeted liftoff for deep space in February 2022.
Image Credit: NASA
#NASA #space #moon #Mars #Moon2Mars #MoontoMars #NASAMarshall #msfc #sls #spacelaunchsystem #nasasls #rockets #exploration #engineering #explore #rocketscience #artemis #Orion #KSC #KennedySpaceCenter #ArtemisI
Engineers are making progress repairing the area where a liquid hydrogen leak was detected during the Artemis I launch attempt Sept. 3, and NASA is preserving options for the next launch opportunity as early as Friday, Sept. 23.
Here, NASA’s Space Launch System (SLS) rocket is seen at Launch Pad 39B Thursday, Sept. 8, 2022, at NASA’s Kennedy Space Center in Florida as teams work to replace the seal on an interface, called the quick disconnect, between the liquid hydrogen fuel feed line on the mobile launcher and the rocket.
Image credit: NASA/Chad Siwik
#NASA #NASAMarshall #ArtemisI #sls #spacelaunchsystem #nasasls #exploration #rocket #artemis #KSC #KennedySpaceCenter
The Flight Readiness Review for NASA’s Artemis I mission concluded August 22, and teams are proceeding toward a two-hour launch window that opens at 8:33 a.m. EDT Monday, August 29, from Kennedy Space Center’s Launch Pad 39B in Florida.
Here, NASA’s Space Launch System (SLS) rocket with the Orion spacecraft aboard is seen atop the mobile launcher as it moves up the ramp at Launch Pad 39B, Wednesday, Aug. 17, 2022, at NASA’s Kennedy Space Center in Florida.
Image credit: NASA/Joel Kowsky
#MoontoMars #NASAMarshall #nasasls #artemis #NASA #NASAMarshall #MSFC #MarshallSpaceFlightCenter #SpaceLaunchSystem #ArtemisI #KSC #NASAKennedy