View allAll Photos Tagged Modular

4 ft or less sections fit together like legos, but are easy to disassemble and store

modular alphabet, created with squares, right triangles, and quarter circles

Hand Knit with homespun romney.

Desde Modular Home disponemos de un servicio de interiorismo para todos aquellos que hayan adquirido una vivienda Modular Home modularhome.es/servicios/interiorismo/

TOPJACK is a modular Jack Up barge with 250 tonne lift

capability complete with 36m legs. Capable for supporting a wide

range of disciplines including port construction, safe investigation

and piling operations.

  

Ravestein Container Pontoon B.V.

 

TYPE RCP-250 – MODULAR SELF ELEVATING PLATFORM

 

Specification Jacking System

 

 Type : Hydraulic cylinders

 Jacking Capacity (4x) : 250 Ton at 250 bar

 Locking : By means of hydraulic activated rotating locks Hydraulic Power Unit

 Type : Electric Hydraulic driven powerpack

 Controls : Remote control (incl. second cable control box)

 Capacity HPU : 2x 55 kW

 Location : In deck container, with small store Generator

 Type : Silenced packed Caterpillar or equal, self supporting

 Capacity : 220 kVa - On top of deck Container Classification:

 German Lloyds : GL 100A5 K(20) Self Elevating Unit, Coastal Water (or equal)

 

Options (not included)

 

 Positioning winches / Deck Crane / RCP Boarding System

 Swim end units / Spud Cans

 Additional Tanks and piping systems

 Backhoe Configuration

 

Contact

David Ravestein / Aernout Goedbloed

Ravestein Container Pontoon B.V.

Waalbandijk 26; 6669 MB Dodewaard (Holland)

Tel +31 (0)488 - 41 18 01

Fax +31 (0)488 - 41 26 47

E-mail info@rcpbv.com

Website www.rcpbv.com

 

Local Notice to Mariners

 

Number: 10/25. Date: 13th May 2025

Exmouth Outfall - Marine Operations - ABCO Divers

Notice is hereby given that ABCO Divers intend to commence work on the Exmouth Outfall Diffuser Pit Excavations and Install on the earliest date of 17th May 2025 on behalf of South West Water Ltd. The works are programmed to be completed by July 2025.

Jack Up Barge “Top Jack 1” in Teignmouth Port, will be towed from Teignmouth as early as Saturday to the outfall site to the east of Exmouth, which is off Straight Point.

Position:

50°36'14.43" N

003°21'30.90" W

The support vessels “Jenny D” and “Celtic Avenger” will be assisting the project throughout the operation. Works will involve excavations from the Jack Up Barge, diving activities and lifting operations to support the install of the outfall diffusers.

All marine users are asked to observe a 500m exclusion zone around the Jack Up Barge.

Vessels

“Topjack 1” – 250t Jack Up Barge – 17m x 24m

“Jenny D” – 21.6m LOA, 9.04m Beam – Multicat and Tug Vessel - IMO 9570905, MMSI 235075339

“Celtic Avenger” – 14m Crew Transfer and Survey Vessel – MMSI 232055392

Creer en nosotros. Modular System Fit

Modular Brownstone building - the roof

www.modular.fonik.de

dopefer multiples, four active modules (external in, ADSR, LFO, Signal Processor) and an A-100 miniNT in one desktop case...

Modular kitchen shops - Find list of suppliers, dealers of Modular kitchen manufacturers Delhi, stainless steel modular kitchen Delhi, modular kitchen in Delhi ncr, modular kitchen kaff in Delhi, ultra fresh modular kitchen Delhi.

 

www.urbanhomez.com/construction/modular_kitchen,_fittings...

My Eurobricks Modular Madness competition entry.

[Design Competition]

 

Tilt Modular is an innovative, forward thinking concept that seeks to establish a foundation for future projects on the site and be a catalyst for the larger community.

 

This infill site currently houses an RT station with service to downtown Sacramento, which will be incorporated into the design through the final stages. The initial phase will have two buildings for retail and offices. Across the street will be a public art component to draw more foot traffic and give the area a more populated and urban feel.

 

The design concept and materials used are in keeping with the architecture of the surrounding neighborhood.

LED modue heatsink Modular LED heatsink 10W 20W 25W 30W 40W 50W

Interesting modular heavy haulage system, brought over from Europe, taken at MATS in Louisville, KY in March, 2015.

Con absoluta originalidad, creado por el deseo de aportar algo nuevo, diferente, para el aprovechamiento de los espacios. Modular System Fit

Two Story Modular Office

modular Icosahedral Star de Paolo Bascetta's y el gusanito que no recuerdo el nombre ni el autor si alguien lo necesita le busco el dato!:D

to get your free modular exhibition stand design please follow this link

 

www.plus-exhibitionstands.com

Before you deal with the modular home builder, you need to understand important things about the modular home construction process. It is a home buyer’s duty to make an educated research on what is really happening inside the factory of modular home manufacturers. You must decipher what...

 

legendaryhomesinc.com/blog/modular-home-construction-insi...

Claudia Melgoza y Norma Sierra, recién egresadas de la carrera de Moda de CEDIM, desarrollaron en su último año de clases la tesis multidisciplinaria “Dacôtta” y presentaron su proyecto con una pasarela.

@LATITUD

4 de agosto del 2012

 

Fotos: Edith Valle.

 

The options available to multistorey modular housing developments and hotels are growing, moving beyond a stack of boxes - and can benefit from the installation of prefabricated, high quality bathroom pods.

In order to match everyday serving and storing needs, the line consists of a large 3.5-litre bowl, a medium 1.5-litre bowl, a small 740-ml bowl and four matching serving plates – each bowl complemented by a liquid-tight seal. These modular elements make the working processes in the kitchen and the serving of food at the table an easy-flowing task, without the need to change bowls. The Allegra line is distinguished by its innovative form language, contemporary colouring and sophisticated manufacturing process.

modular kitchen with membrane finish

Making the buildings modular instead of full buildings to give the user more control and variety

Modular home basement has a simple construction process but it need extra care. It needs an efficient planning and construction. Contractors must see to it that each detail are given attention even from the planning phase.

Basements are good way to add more space to the home. And understanding t...

 

legendaryhomesinc.com/blog/modular-home-basement-construc...

Modular de Unit Origami Fantasy de Tomoko Fuse. Plegado con 30 módulos de papel kami 7.5x7.5cm.

plegandome.blogspot.com/2011/02/modular-de-unit-origami-f...

1 2 ••• 68 69 71 73 74 ••• 79 80