View allAll Photos Tagged ModelTrains
needed to clean/lube/test all the equipment,,it sat in boxes for 20 yrs, and on a layout 12 yrs prior to that. everything works excellent.
Captured on my iPhone 6 during the brief visit down south to visit Mr. Chaminda Weerawarna's Model Train Layout
I tried using light gray ABS pellets as train track ballast, the same stuff that goes into the Lego molding machines. I think it turned out quite well!
The track is Trixbrix with 0.14mm x 10mm aluminium tape.
I'm ballasting this part of the track now because it will be under a tunnel. More soon on the steps I will take to do this. This pic shows about 1/3 of the process so far.