View allAll Photos Tagged Line3

L2|13 - Line 2 (East Xujing - Pudong Intl. Airpt.) East Nanjing Rd. Stn. 07/12

9号线 【中春路】

Line 9 -- Zhongchun Road

7号线 【南陈路】

Line 7 -- Nanchen Road

L10|16 - Line 10 (New Jiangwan Town - Hongqiao Rlwy. Stn. / Hangzhong Rd.) East Nanjing Rd. Stn. II 02/02

L10|16 - Line 10 (New Jiangwan Town - Hongqiao Rlwy. Stn. / Hangzhong Rd.) East Nanjing Rd. Stn. I 02/08

Line 2 Train Ride East Nanjing Rd. Stn. to West Nanjing Rd. Stn. 04/05

August 27, 2021. Peabody, MA.

Activists gathered at a Chase Bank branch to protest Chase facilitating $1.5 billion in so-called sustainability loans to Enbridge along with other major banks including JPMorgan, Citibank, Bank of America, Wells Fargo and TD Bank. Enbridge is building Line 3, a pipeline that would result in a 10% expansion of the tar sands that activists assert would have the same climate impact as fifty new coal-fired power plants. Enbridge’s “sustainability” loans reward the company for reducing emissions from its buildings and vehicles, but do nothing to address the oil that flows through its pipelines and is responsible for 99% of its climate pollution.

© 2021 Marilyn Humphries

 

Line 2 Train Ride East Nanjing Rd. Stn. to West Nanjing Rd. Stn. 01/05

L10|16 - Line 10 (New Jiangwan Town - Hongqiao Rlwy. Stn. / Hangzhong Rd.) East Nanjing Rd. Stn. I 08/08

1 2 ••• 62 63 65 67 68 ••• 79 80