View allAll Photos Tagged Line3

Minnesotans and allied organizations gathered at Governor Tim Walz’s office in the State Capitol to urge him and his administration to stop the Enbridge Line 3 tar sands pipeline with petition signatures from across Minnesota. Greenpeace, together with MN350, Sierra Club North Star Chapter, Honor the Earth, Environment Minnesota, Daily Kos, and CREDO Action presented signatures from Minnesotans urging Walz and his administration to respect Indigenous treaty rights and protect the land, water, wild rice, and climate from the threats posed by Enbridge’s Line 3 pipeline project.

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Forus

Bus number: 8910

Registration plates: DP 59535

Bus: Volvo 8907 RLE (15m)

 

Contact me if you want to use the photo

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Sundelia

Bus number: 2106

Registration plates: RL 10326

Bus: Volvo 8900 Euro 6 (15m)

 

Contact me if you want to use the photo

Company: Kolumbus

Operator: Connect Bus

Line: 3 Viste Hageby

Bus number: 2429

Registration plates: EE 24796

Bus: Volvo 7900 Electric

 

Contact me if you want to use the photo

2号线 【世纪大道】

Line 2 -- Century Avenue

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Forus

Bus number: 8910

Registration plates: DP 59535

Bus: Volvo 8907 Rle

 

Contact me if you want to use the photo

10号线 【上海动物园】

Line 10 -- Shanghai Zoo

2号线 【人民广场】

Line 2 -- People's Square

Company: Kolumbus

Operator: Norgesbuss

Line: 3 Viste Hageby

Bus number: 2358

Registration plates: RL 10388

Bus: Volvo 8900 Euro 6 (12m)

 

Contact me if you want to use the photo

2号线 【龙阳路】

Line 2 -- Longyang Road

Hyderabad Metro Rail (HMR) under-construction by L&T Metro Rail (Hyderabad) near . This stretch is at Tarnaka signals part of Stage-I (Nagole-Mettuguda) of Line 3 (Nagole-Shilparamam).

 

Raw File: image_17 (Picmarkr).IMAG7586.27072014

  

4号线 【大连路】

Line 4 -- Dalian Road

2号线 【唐镇】

Line 2 -- Tangzhen

1 2 ••• 37 38 40 42 43 ••• 79 80