View allAll Photos Tagged Designbuild

5:10 Cabin 2011

Wofford Heights, CA

Hunter Leggitt Studio

 

In house Design and Build

 

All photos are property of Hunter Leggitt Studio and are subject to all copyright laws.

 

For more info, please visit

 

www.hunterleggitt.com

Construction on this 2400 s.f. (267 sq. meter) modestly budgeted, green design-build project began after completing a large lot subdivision with the City of Austin and required all new utilities during construction.

 

In addition to a spatially expansive interior with 11' ceilings (2.67 sq. meter) , we incorporated both North facing and South facing roofdecks of 400 s.f. each (44.5 sq. meter), 800 s.f. of covered outdoor living space (8.89 sq. meter) on the ground floor and two huge cantilevered Master Bedroom window spaces.

 

In front, there is a street-facing covered front porch off the Master Bedroom and a sculptural storage room on the ground floor that the Clients anointed "il Ferro Tartaruga" (the Steel Turtle) and which is outfitted for a future Jacuzzi. This space is a built experiment of the Firm's research into parametric modeling, planarization routines and digital fabrication. All the steel was modeled in 3D allowing it to be all shop cut with no in-field cuts.

 

A super minimalist approach leveraged the structural engineering into creating extra-ordinary outdoor spaces, while a compact plan allows the indoor spaces to naturally brush up against the building envelope and outside spaces.

 

Architekturzentrum Wien AzW: Think Global, Build Social!: Bauen für eine bessere Welt (13.3.2014) esel.cc/AzW_SocialBuild

| Foto: eSeL.at

Ezra Wheeler Design Build-Condo C

wayfinding as street furniture

 

In November 2008, Urban Omnibus partnered with Bryan Bell, founder of Design Corps, to host a weekend-long design/build event that invited young designers to design a project in the public interest and build it from found materials. urbanomnibus.net/2009/04/make-a-difference-in-two-days/

Pepsi’s 387,400 s.f. Nevada bottling and distribution center was the largest project to date that Gray had undertaken for this repeat customer.

 

The conventional steel structure was designed with load-bearing insulated and textured concrete pre-cast walls, Forma wall metal panels and a 167,000 gallon cast-in-place underground effluent treatment tank.

 

All images (c) Gray Construction

Proof of concept prototypes for Yale UEDLAB grant application

another shot taken

1 2 ••• 6 7 9 11 12 ••• 79 80