View allAll Photos Tagged Control

Program:Manual

Lens:150-600mm f/5-6.3 G VR

F:5.6

Speed:1/2500

ISO:450

Focal Length:320 mm

AF Fine Tune Adj:0

Focus Mode:AF-C

AF Area:Dynamic Area (3D-tracking)

Shooting Mode:Continuous, Auto ISO

VR:On

Metering Mode:Multi-segment

WB:Auto0

Picture Control:Neutral

Focus Distance:59.57 m

Dof:11.71 m (54.28 - 65.99)

HyperFocal:608.59 m

After a secretive agency in New York is invaded by an otherworldly threat, you become the new Director struggling to regain Control.

 

Ground Control to Major Tom

Ground Control to Major Tom

Take your protein pills and put your helmet on

 

Ground Control to Major Tom

Commencing countdown, engines on

Check ignition and may God's love be with you

david bowie-space oddity

The Control Line Scale Nats took place June 17 and 18, 2021. Photos by Fred Cronenwett.

Controls for some machinery.

How the mighty have fallen, we once were in control of our lives but now our lives have somehow wrangled control from us. Look its just sitting there all smug, deceiving you with its sleek lines, its pretty little navi scroll button thingy.

But NO! its just playing possum, waiting for the most inopportune moment to exercise its high and mighty technology and wrest life out of your hands once again.

 

Control Arms demonstration, Sheffield

 

www.controlarms.org/home

 

Copyright: Paul Cantrell

 

www.facebook.com/PaulCantrellPhotos

William Control play The Flapper in Birmingham, Thursday 22 July 2010.

www.myspace.com/williamcontrol

www.birminghampromoters.com

www.theflapper.co.uk

 

Photos for Brum Notes and Gig Junkies with review by Daron of The Hearing Aid.

www.brumnotes.com

www.gigjunkies.com

www.thehearingaid.blogspot.com

 

© 2010 www.flickr.com/wayne_john_fox, please email me for the original images.

wayne [UNDERSCORE] john [UNDERSCORE] fox [AT] hotmail [DOT] com

Downloading, reproducing, blogging, copying or using my images in any way without my prior permission is illegal.

Thank you.

Control Gates Tekapo view from the Cowans Track

08.11.2013, Local Natives und Cloud Control - Flex

(c) Tanja Soleder

Controlled burn conducted by CTVFD on 4-17-11

Control Arms demonstration, Sheffield

 

www.controlarms.org/home

 

Copyright: Paul Cantrell

 

www.facebook.com/PaulCantrellPhotos

In the control cabin

 

From the Behind-the-Scenes Tour around Tower Bridge: Towers, high-level Walkways and Victorian Engine Rooms down to its hidden depths, normally out of bounds to the public...views from the Glass Floor and high-level Walkway, then the original steam engines, accumulators and boilers in the Victorian Engine Rooms...the Bridge’s operational areas including the Control Cabin, Machinery Room and the immense Bascule Chambers, which house the 422-ton counterweights.

  

Built between 1886 and 1894, the Bridge has spent more than a century as London's defining landmark, an icon of London and the United Kingdom.

A huge challenge faced the City of London Corporation - how to build a bridge downstream from London Bridge without disrupting river traffic activities. To generate ideas, the Special Bridge or Subway Committee was formed in 1876, and a public competition was launched to find a design for the new crossing.

Over 50 designs were submitted to the Committee for consideration, some of which are on display at Tower Bridge. It wasn't until October 1884 however, that Sir Horace Jones, the City Architect, in collaboration with John Wolfe Barry, offered the chosen design for Tower Bridge as a solution.

It took eight years, five major contractors and the relentless labour of 432 construction workers each day to build Tower Bridge under the watchful eye of Sir John Wolfe Barry.

Two massive piers were built on foundations sunk into the riverbed to support the construction, and over 11,000 tons of steel provided the framework for the Towers and Walkways. This framework was clad in Cornish Granite and Portland Stone to protect the underlying steelwork and to give the Bridge a more pleasing appearance.

When it was built, Tower Bridge was the largest and most sophisticated bascule bridge ever completed ('bascule' comes from the French word for 'seesaw'). These bascules were operated by hydraulics, using steam to power the enormous pumping engines. The energy created was stored in six massive accumulators, meaning that as soon as power was required to lift the Bridge, it was always readily available. The accumulators fed the driving engines, which drove the bascules up and down. Despite the complexity of the system, the bascules only took about a minute to raise to their maximum angle of 86 degrees. Find out more about this process.

Today, the bascules are still operated by hydraulic power, but since 1976 they have been driven by oil and electricity rather than steam. The original pumping engines, accumulators and boilers are now on display within Tower Bridge’s Engine Rooms.

[TowerBridge.org.uk]

The Power of the Foot.

Controlled burn is my guess, it has been going on most of the morning so far. Due to my not being able to travel too far at the moment, an after affect of most serious and intrusive surgeries, I couldn't really get anywhere to get a decent photo, but you get the picture. It was an impressive fire, smoke plume at least.

1 2 ••• 67 68 70 72 73 ••• 79 80