View allAll Photos Tagged CivilEngineering
Work continues on the redevelopment and expansion of Reading Station. Extension of the lines north of the station and next to the car park, looking towards London.
Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.
Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.
Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.
Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.
Roadway roundabout plan & profile at the CapMetro rail station located at M.L.K. in Austin, TX.
(COA Case #SP-2007-0409C). Circa 2008.
A look into Professor Markus Buehler's research group in the Laboratory for Atomistic and Molecular Mechanics.
The goal of Buehler’s research group is to understand and model the structure of natural materials like collagen, bone, and spider silk in the hopes that their incredible mechanical properties may be replicated in synthetic materials. Their material design traverses scales from atoms to structures.
Photo by Elizabeth Woodward
www.elizabethwoodwardphoto.com
Please ask before use
Apologies to Bernard Cribbins for stealing the first line of his song "Hole in the ground" for the title of this photo. Work continues on the new platforms as part of the Reading station redevelopment - and on digging this hole. I am intrigued by it and am monitoring its progress. I know I could just ask but where's the fun in that?
Comments always appreciated, as long as you keep it clean - I love to hear your feedback! xx
I went for a visit to Derby for their comedy festival and to spend the weekend with Gemma.
Saturday morning we went to Belper to the river gardens and the horseshoe weir, which is an incredible piece of civil engineering!
The gardens are lovely and tranquil. It was a great little alternative to our usual trip to Dovedale - which we called off because the weather wasn't great.
Had a lovely morning though!
Poids en ordre de marche : 14 400 - 18 300 kg
Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : boulevard Jean-Jaurès
Work continues on the redevelopment and expansion of Reading Station.Extension of the lines north of the station and next to the car park, looking towards London.
Poids en ordre de marche : 26 170 - 28 340 kg
Création d'un parking provisoire boulevard de l'Insurrection du Ghetto de Varsovie à Nancy.
Jeff Laman, professor of civil and environmental engineering, in his Sackett Building office on Jan. 27, 2014. (Photo credit: Curtis Chan)
Engineers put the replacement bridge for the Bailey Bridge in Irvine in place. The Bailey Bridge was based on a World War II design and crossed the River Irvine from the early 70s until it was demolished in the spring of 2009.
Part of the arches which will support the bridge can be seen in this photo supported by two towers until the other ends of the arches are put into position.
Construction de l'ensemble immobilier L’Écrin des Jardiniers comprenant 2 bâtiments collectifs pour 64 logements, 6 maisons individuelles ainsi que 71 places de stationnement construits sur le site de l'ancienne maison de retraite Notre Maison.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : 52, rue des Jardiniers
Fonction : Logements
Construction : 2020 → 2022
► Architecte : Alain Casari
► Gros œuvre : Wig France
► PC n° 54 395 19 R0021 délivré le 11 juillet 2019
Niveaux : R+5
Hauteur : 16.72 m
Surface de plancher : 4 888 m²
Superficie du terrain : 6 347 m²
Many students ask's this what next after civil Engineering ?.Here after civil engineering courses list are also given for job oriented.These are some of the HSE courses in Construction safety that are useful to Civil Engineering Passed out students.This may help while the construction of oil & gas plant, Industrial construction projects etc.,
safetyengineeringcourseinchennai.in/blog/courses-after-ci...
I took this picture a couple of years ago. It was a passing shot, a celebration of November sunlight and a memory of my old alma mater. University College London 1955 - 57). I've retrieved this copy from archive and Flickr tells me that the photo was taken a moment ago. Could be, today is sunny and on the surface at least little changes around here. I have to look very hard indeed to spot the changes since 1957.
Courtyard storm drainage plan for The Genesee (AKA: Oak Meadows Apartments) located at 3715 S. 1st St., Austin, TX. (COA Case #SP-2011-0070C). Plans were approved in 2011; Construction began late 2011/early 2012.
Vehicle and pedestrian bridges connecting stadia for a large sporting event in Stratford, London, UK
Building pad sections for the Walmart at 620 & 2222 in Austin, TX (4 points). The building pad on this project required some special attention based on the Geotechnical report.
(COA Case #SPC-04-0048C) Circa 2005