View allAll Photos Tagged Capability

Paula Peters (DPAC) stands in front of the imposing entrance to the Royal Courts of Justice as the vigil supporting the judicial review of the Work Capability Assessment is about to begin.

 

DPAC, Mental Health Resistance Network & WinVisible vigil at High Court supporting judicial review of Work Capability Assessment (WCA) London - 08.07.2014

 

Disabled activists representing Disabled People Against Cuts (DPAC), the Mental Health Resistance Network (MHRN) and WinVisible (Women With Invisible Disabilities held a dignified vigil on the steps of the Royal Courts of Justice to show support for the judicial review taking place this week intended to make the Dept. for Work and Pensions (DWP) prove to the court that they are abiding by a previous court order that they make reasonable adjustments to the Work Capability Assessment testing process to make it fit for purpose and to abide by the Equalities Act 2010.

 

A previous judicial review had ruled that the WCA was clearly biased against people with mental health disabilities, and great harm has been done to many people as the DWP has refused to take into consideration any medical evidence or evidence crucial to any understanding of how a claimant's mental illness affects their daily lives and their ability to work. This cruel process has put people with mental health problems at a substantial disadvantage. The testing process has caused a great deal of distress, anxiety and fear, and there is clear evidence that there has been a significant number of suicides by claimants going through the Work Capability Assessment process, run up till now by disgraced French IT firm ATOS.

 

This photo © Pete Riches

Do not reproduce, alter, re-transmit, blog or otherwise exploit my images without my written permission. I remain at all times the copyright owner of this image.

 

Media buyers and publications can access this story on Demotix. Standard industry rates apply.

 

Hi-Res, un-watermarked versions of these files are available on application solely at my discretion

If you want to use any image found in my Flickr Photostream, please Email me directly.

 

about.me/peteriches

SAC 01 Pápa NATO Strategic Airlift Capability

Boeing C-17A Globemaster III

08-0001 (F-207)

EYSA 32R

www.sacprogram.org

This magnificent informal landscape garden was laid out in the 18th century by 'Capability' Brown and further developed in the early years of the 20th century by its owner, Arthur G. Soames. The original four lakes form the centrepiece. There are dramatic shows of daffodils and bluebells in spring, and the rhododendrons and azaleas are spectacular in early summer. Autumn brings stunning colours from the many rare trees and shrubs, and winter walks can be enjoyed in this garden for all seasons. Visitors can now also explore South Park, 107 hectares (265 acres) of historic parkland, with stunning views.

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

A walk around Minterne Gardens in Dorset.

 

The garden walk is about 1 mile in a horseshoe shape.

 

You can take different paths on the last leg of the walk, we went on the upper path.

 

The River Cerne passing through the gardens with waterfalls.

 

Information below from leaflet from Minterne Gardens:

 

The Minterne Valley, landscapped in the manner of Capability Brown in the 18th century, has been the home of the Churchill and Digby families for 350 years. The gardens are laid out in a horseshoe below Minterne House, with a chain of small lakes, waterfalls and streams. They contain an important collection of Himalayan Rhodocdendrons and Azaleas, with Spring bulbs, Cherries, Maples and many fine and rare trees; the garden is noted for its Autumn colouring.

 

Of particular note are the large plants of Magnolia Campbellii which flower in March and April, together with a profusion of spring bulbs. Many flowering cherries were brought from Japan in 1920 and the Pieris Forrestii with their brilliant scarlet shoots, originally came from Wakehurst. A very fine collection of Davidia Involucrata (the pocket handkerchief tree) produce striking bracts in late May and early June, when the streams are lined with primulas, astilbes and other water plants.

Harewood House, near Leeds, is the magnificent seat of the Lascelles family, earls of Harewood; the current (8th) earl is a great-grandson of King George V and a third cousin of HM the King. The 1,000 acre grounds were landscaped by the famous Lancelot 'Capability' Brown. This photograph (taken in July 2016) is of some flamingoes beside the 32 acre lake. There used to be a popular Bird Garden in the grounds, but sadly this closed in 2023 due to the high cost of maintaining it. All of the birds have been successfully re-housed elsewhere.

These gardens were designed by Capability Brown, who may be Britain's most celebrated landscape designer of all time.

A large Mental Health Resistance Network banner hangs off the railings of the High Court which reads "Welfare reforms are cuts that kill!".

 

DPAC, Mental Health Resistance Network & WinVisible vigil at High Court supporting judicial review of Work Capability Assessment (WCA) London - 08.07.2014

 

Disabled activists representing Disabled People Against Cuts (DPAC), the Mental Health Resistance Network (MHRN) and WinVisible (Women With Invisible Disabilities held a dignified vigil on the steps of the Royal Courts of Justice to show support for the judicial review taking place this week intended to make the Dept. for Work and Pensions (DWP) prove to the court that they are abiding by a previous court order that they make reasonable adjustments to the Work Capability Assessment testing process to make it fit for purpose and to abide by the Equalities Act 2010.

 

A previous judicial review had ruled that the WCA was clearly biased against people with mental health disabilities, and great harm has been done to many people as the DWP has refused to take into consideration any medical evidence or evidence crucial to any understanding of how a claimant's mental illness affects their daily lives and their ability to work. This cruel process has put people with mental health problems at a substantial disadvantage. The testing process has caused a great deal of distress, anxiety and fear, and there is clear evidence that there has been a significant number of suicides by claimants going through the Work Capability Assessment process, run up till now by disgraced French IT firm ATOS.

 

This photo © Pete Riches

Do not reproduce, alter, re-transmit, blog or otherwise exploit my images without my written permission. I remain at all times the copyright owner of this image.

 

Media buyers and publications can access this story on Demotix. Standard industry rates apply.

 

Hi-Res, un-watermarked versions of these files are available on application solely at my discretion

If you want to use any image found in my Flickr Photostream, please Email me directly.

 

about.me/peteriches

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

A PNNL LDRD program is developing a capability for measuring fracture propagation in materials under extreme conditions--also known as raman double torsion capability.

 

Terms of Use: Our images are freely and publicly available for use with the credit line, "Andrea Starr | Pacific Northwest National Laboratory"; Please use provided caption information for use in appropriate context.

Temple Newsam is a 15th centuryTudor-Jacobean house in Leeds, famous as the birthplace of Lord Darnley, the ill-fated husband of Mary, Queen of Scots and with grounds landscaped by Capability Brown.

 

The manor of Newsam was owned by the Knights Templar in the 12th century before the estate passed to the Darcy family, and Thomas, Lord Darcy built the first manor house here in about 1500. One wing of Darcy's original manor survives as the central block of the current house.

Darcy was executed for treason for his part in the Pilgrimage of Grace in 1537and his lands were seized by the crown. Henry VIII gave Newsam to the Countess of Lennox, and her son, Henry, Lord Darnley was born and raised here. After Darnley's murder, Elizabeth I seized the estate, and the house languished in a state of neglect until 1622 when it was purchased by Sir Arthur Ingram. Ingram tore down much of the earlier manor house and built two large new wings to form the basis of the house we see today.

 

In 1758 Charles, 9th Lord Irwin, married a rich heiress and used her money to transform the interior of Temple Newsam and fill it with a collection of fine art including Old Master works. They hired James Wyatt to build a grand staircase, and Capability Brown to create the landscape garden that surrounds the house.

 

The house was the home of the Ingram family for over 300 years until 1922 when Lord Halifax sold the park and house to Leeds Corporation for a nominal sum, placing covenants over them to ensure their preservation for the future. The house and estate are now owned by Leeds City Council and open to the public.

Virginia National Guard Soldiers assigned to Virginia Beach-based 1173rd Transportation Company, 1030th Transportation Battalion, 329th Regional Support Group provide troop transport for 116th Infantry Brigade Combat Team Soldiers July 17, 2019, during eXportable Combat Training Capability Rotation 19-4 at Fort Pickett, Virginia. Read more about the XCTC at go.usa.gov/xyPx6. (U.S. National Guard photo by Cotton Puryear)

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

The modular nature of the Raven, Puma and future SUAS demands an innovative, modular approach to retrograde operations and, ultimately, acquisition methods. Here, an RQ-11B Raven UAS flies over Castles Drop Zone, Fort Pickett, VA, Aug. 16. The Raven can be remotely controlled from a ground station or fly programmed missions using GPS waypoint navigation. (U.S. Air National Guard photo by TSgt Matt Hecht)

 

Temple Newsam is a 15th centuryTudor-Jacobean house in Leeds, famous as the birthplace of Lord Darnley, the ill-fated husband of Mary, Queen of Scots and with grounds landscaped by Capability Brown.

 

The manor of Newsam was owned by the Knights Templar in the 12th century before the estate passed to the Darcy family, and Thomas, Lord Darcy built the first manor house here in about 1500. One wing of Darcy's original manor survives as the central block of the current house.

Darcy was executed for treason for his part in the Pilgrimage of Grace in 1537and his lands were seized by the crown. Henry VIII gave Newsam to the Countess of Lennox, and her son, Henry, Lord Darnley was born and raised here. After Darnley's murder, Elizabeth I seized the estate, and the house languished in a state of neglect until 1622 when it was purchased by Sir Arthur Ingram. Ingram tore down much of the earlier manor house and built two large new wings to form the basis of the house we see today.

 

In 1758 Charles, 9th Lord Irwin, married a rich heiress and used her money to transform the interior of Temple Newsam and fill it with a collection of fine art including Old Master works. They hired James Wyatt to build a grand staircase, and Capability Brown to create the landscape garden that surrounds the house.

 

The house was the home of the Ingram family for over 300 years until 1922 when Lord Halifax sold the park and house to Leeds Corporation for a nominal sum, placing covenants over them to ensure their preservation for the future. The house and estate are now owned by Leeds City Council and open to the public.

Croome Court is a mid-18th-century Neo-Palladian mansion surrounded by extensive landscaped parkland at Croome D'Abitot, near Pershore in south Worcestershire, England. The mansion and park were designed by Lancelot "Capability" Brown for the 6th Earl of Coventry, and were Brown's first landscape design and first major architectural project. Some of the mansion's rooms were designed by Robert Adam.

The mansion house is owned by Croome Heritage Trust, and is leased to the National Trust which operates it as a tourist attraction. The National Trust owns the surrounding parkland, which is also open to the public.

taken from: en.wikipedia.org/wiki/Croome_Court

  

170808-N-OX430-064 ATLANTIC OCEAN (Aug. 8, 2017) A Royal Navy Merlin Mk2 prepares to land on the flight deck of the Nimitz-class aircraft carrier USS George H.W. Bush (CVN 77) during exercise Saxon Warrior 2017, Aug. 8. Saxon Warrior is a United States and United Kingdom co-hosted carrier strike group exercise that demonstrates interoperability and capability to respond to crises and deter potential threats. (U.S. Navy photo by Mass Communication Specialist 3rd Class Daniel Gaither/Released)

170805-N-KB401-043 ATLANTIC OCEAN (Aug. 5, 2017) The fast combat supply ship USNS Supply (T-AOE 6) conducts a replenishment-at- sea) with the Royal Navy Type 23-class frigate HMS Iron Duke (F 234) during exercise Saxon Warrior 2017, Aug. 5. Saxon Warrior is a United States and United Kingdom co-hosted carrier strike group exercise that demonstrates interoperability and capability to respond to crises and deter potential threats. (U.S. Navy photo by Mass Communication Specialist 2nd Class Michael B. Zingaro/Released)

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

SANDF Capability demonstration at the Rand Easter Show – Helicopters inserted and Parabatt Team to secure the Landing Zone then secure a casualty and extracted using the Hot Extraction method, while Rooivalk Attack Helicopter provided Top Cover

 

Photos: Lourens Badenhorst

Sheffield Park is a beautiful 120 acre woodland garden originally designed for the first Earl of Sheffield by Humphry Repton and Capability Brown in the 18th century

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

The shocking capability for evil to be in our midst during ordinary events of a day was my inspiration for this slow compositional read: at first this 13” by 36” piece appears to depict a typical suburban scene. Under closer inspection, the viewer realizes there is a heinous event taking place.The contrast of freshness and cleanliness of laundry hiding the dark and dirtiness of the disturbing event is meant to leave the viewer with an unsettled feeling.

170807-N-KB401-289 THE MINCH, Scotland (Aug. 7, 2017) An MH-60S Sea Hawk, attached to the "Tridents" of Helicopter Sea Combat Squadron (HSC) 9, patrols while the Nimitz-class aircraft carrier USS George H.W. Bush (CVN 77) and the Ticonderoga-class guided-missile cruiser USS Philippine Sea (CG 58) transit the Minch, Scotland, during exercise Saxon Warrior 2017, Aug. 7. Saxon Warrior is a United States and United Kingdom co-hosted carrier strike group exercise that demonstrates interoperability and capability to respond to crises and deter potential threats. (U.S. Navy photo by Mass Communication Specialist 2nd Class Michael B. Zingaro/Released)

XM2010 IKPT-2 Provides extended range capability and incorporates the latest in weapons technology for the Army Sniper.

 

The XM2010 Enhanced Sniper Rifle (ESR), formerly known as the M24 Reconfigured Sniper Weapon System, is a sniper rifle developed by PEO Soldier for the U.S. Army.It is derived from the M24 Sniper Weapon System and is intended to replace existing M24s. After winning a competitive bidding process, Remington was awarded the production contract. Up to 3,600 weapons will be procured. The Army expects to begin fielding 250 upgraded weapons to deployed U.S. Army Snipers by the end of December 2010.Later project manager for Soldier weapons Colonel Douglas Tamilio said the XM2010 expected fielding will happen from January 2011

 

The XM2010 is distinguished by its advanced design and represents a quantum upgrade over the M24. The shooter interface can be tailored to accommodate a wide range of shooter preferences and its folding stock provides Soldier flexibility in transporting the weapon during operations. The weapon also incorporates advanced corrosion resistant coatings to ensure longevity. The aluminum, steel, and high impact polymers used in the weapon’s construction are lightweight and rugged.

 

The ESR is equipped with a Leupold Mark 4 6.5-20x50mm scope. The variable power scope includes a first focal plane reticle so when the user dials in, the reticle pattern scales with the zoom enabling the sniper to estimate range at any power setting. The scope also employs a reticle pattern that facilitates faster and more accurate range estimation and utilizes mil turret adjustments to eliminate MOA to mil conversion. The targeting stadia reticle allows for simultaneous elevation and windage holds that eliminate the need to dial in adjustments.

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

Broadway Tower is a folly on Broadway Hill, near the village of Broadway, in the English county of Worcestershire, at the second-highest point of the Cotswolds (after Cleeve Hill). Broadway Tower's base is 1,024 feet (312 metres) above sea level. The tower itself stands 65 feet (20 metres) high.

 

The "Saxon" tower was the brainchild of Capability Brown and designed by James Wyatt in 1794 in the form of a castle, and built for Lady Coventry in 1798–99. The tower was built on a "beacon" hill, where beacons were lit on special occasions. Lady Coventry wondered whether a beacon on this hill could be seen from her house in Worcester — about 22 miles (35 km) away — and sponsored the construction of the folly to find out. Indeed, the beacon could be seen clearly.

 

Over the years, the tower was home to the printing press of Sir Thomas Phillipps, and served as a country retreat for artists including William Morris and Edward Burne-Jones who rented it together in the 1880s. William Morris was so inspired by Broadway Tower and other ancient buildings that he founded the Society for the Protection of Ancient Buildings in 1877.

 

Today, the tower is a tourist attraction and the centre of a country park with various exhibitions open to the public at a fee, as well as a gift shop and restaurant. The place is on the Cotswold Way and can be reached by following the Cotswold Way from the A44 road at Fish Hill, or by a steep climb out of Broadway village.

 

Near the tower is a memorial to the crew of an A.W.38 Whitley bomber that crashed there during a training mission in June 1943.

SANDF Capability demonstration at the Rand Easter Show – Helicopters inserted and Parabatt Team to secure the Landing Zone then secure a casualty and extracted using the Hot Extraction method, while Rooivalk Attack Helicopter provided Top Cover

 

Photos: Lourens Badenhorst

Disability rights protest at DWP HQ against Work Capability Assessments - London 01.04.2014

 

A small group of disability rights activists from DPAC, WinVisible and Mental Health Network protested outside the London headquarters of the Dept for Work and Pensions in Tothill Street (where it's rumoured Iain Duncan Smith keeps his coffin full of soil from Milton Keynes), to demand an end to the discredited, hated Work Capability Assessments which have been used as a blunt weapon by the Tories through their (now-dismissed) henchmen at ATOS to drive many sick and disabled people to their deaths in the dishonest name of 'Austerity'.

 

Their numbers were few because of last minute changes, but their words - as ever - were poignant, angry and defiant.

  

This photo © Pete Riches

Do not reproduce, alter, re-transmit, blog or otherwise exploit my images without my written permission. I remain at all times the copyright owner of this image.

 

Media buyers and publications can access this story on Demotix. Standard industry rates apply.

 

Hi-Res, un-watermarked versions of these files are available on application solely at my discretion

If you want to use any image found in my Flickr Photostream, please Email me directly.

 

about.me/peteriches

 

Exif data auto added by theGOOD Uploadr

File Size : 2.0 mb

Camera Make : OLYMPUS IMAGING CORP.

Camera Model : E-M5

Software : Adobe Photoshop Lightroom 5.3 (Windows)

Exposure : 0.006 seconds

Aperture : f/9

ISO Speed : 800

Focal Length : 12 mm

This magnificent informal landscape garden was laid out in the 18th century by 'Capability' Brown and further developed in the early years of the 20th century by its owner, Arthur G. Soames. The original four lakes form the centrepiece. There are dramatic shows of daffodils and bluebells in spring, and the rhododendrons and azaleas are spectacular in early summer. Autumn brings stunning colours from the many rare trees and shrubs, and winter walks can be enjoyed in this garden for all seasons. Visitors can now also explore South Park, 107 hectares (265 acres) of historic parkland, with stunning views.

This magnificent informal landscape garden was laid out in the 18th century by 'Capability' Brown and further developed in the early years of the 20th century by its owner, Arthur G. Soames. The original four lakes form the centrepiece. There are dramatic shows of daffodils and bluebells in spring, and the rhododendrons and azaleas are spectacular in early summer. Autumn brings stunning colours from the many rare trees and shrubs, and winter walks can be enjoyed in this garden for all seasons. Visitors can now also explore South Park, 107 hectares (265 acres) of historic parkland, with stunning views.

A visit to Berrington Hall near Leominster in Herefordshire.The dome was being restored so part of the building was under scaffolding inside and out (including up the main staircase).

  

Berrington Hall is a country house located about 3 miles (4.8 km) north of Leominster, Herefordshire, England. During the 20th century it was the seat of the Cawley family.

 

It is a neoclassical country house building that Henry Holland designed in 1778-81 for Thomas Harley. It has a somewhat austere exterior, but the interiors are subtle and delicate. Berrington Hall is home to the Elmar Digby furniture collection, paintings by, amongst others, Thomas Luny (1759–1837), and the Charles Paget Wade costume collection from Snowshill, which can be viewed by appointment. The 'below stairs' areas and servants' quarters that are open to the public include a Victorian laundry and Georgian dairy. Berrington has been in the care of the National Trust since 1957 and is, along with its gardens, open to the public.

 

Berrington features Capability Brown's last landscape design. A notable feature is the ha-ha wall, which was subject to extensive renovation in the late 20th century by local craftsmen. Berrington Pool, a lake and island, is a Site of Special Scientific Interest.

  

Berrington had been in the possession of the Cornewall family since 1386, but was sold in 1775 to Thomas Harley, a banker and government contractor who in 1767 had been Lord Mayor of London. He commissioned the rebuilding in 1778-1781 of the present Berrington Hall in place of the previous old house. He made it available to his daughter Anne and her new husband George Rodney, the son of Admiral Rodney. After Harley's death the house descended in the Rodney family for 95 years.

 

In 1901 the Manchester businessman Frederick Cawley MP, later Baron Cawley, purchased the estate. In 1957 the 3rd Lord Cawley transferred it to the Treasury, which passed in on to the National Trust. Lady Crawley was allowed to remain in occupation until her death in 1978.

 

It was classified as a Grade I listed building in 1959.

  

A look around the Walled Garden at Berrington Hall.

  

The area round the back with picnic tables. Also a Vegetable garden here.

  

Flower - star dahlia

170807-N-KB401-452 THE MINCH, Scotland (Aug. 7, 2017) The Nimitz-class aircraft carrier USS George H.W. Bush (CVN 77) transits the Minch, Scotland, during exercise Saxon Warrior 2017, Aug. 7. Saxon Warrior is a United States and United Kingdom co-hosted carrier strike group exercise that demonstrates interoperability and capability to respond to crises and deter potential threats. (U.S. Navy photo by Mass Communication Specialist 2nd Class Michael B. Zingaro/Released)

A visit to Berrington Hall near Leominster in Herefordshire.The dome was being restored so part of the building was under scaffolding inside and out (including up the main staircase).

  

Berrington Hall is a country house located about 3 miles (4.8 km) north of Leominster, Herefordshire, England. During the 20th century it was the seat of the Cawley family.

 

It is a neoclassical country house building that Henry Holland designed in 1778-81 for Thomas Harley. It has a somewhat austere exterior, but the interiors are subtle and delicate. Berrington Hall is home to the Elmar Digby furniture collection, paintings by, amongst others, Thomas Luny (1759–1837), and the Charles Paget Wade costume collection from Snowshill, which can be viewed by appointment. The 'below stairs' areas and servants' quarters that are open to the public include a Victorian laundry and Georgian dairy. Berrington has been in the care of the National Trust since 1957 and is, along with its gardens, open to the public.

 

Berrington features Capability Brown's last landscape design. A notable feature is the ha-ha wall, which was subject to extensive renovation in the late 20th century by local craftsmen. Berrington Pool, a lake and island, is a Site of Special Scientific Interest.

  

Berrington had been in the possession of the Cornewall family since 1386, but was sold in 1775 to Thomas Harley, a banker and government contractor who in 1767 had been Lord Mayor of London. He commissioned the rebuilding in 1778-1781 of the present Berrington Hall in place of the previous old house. He made it available to his daughter Anne and her new husband George Rodney, the son of Admiral Rodney. After Harley's death the house descended in the Rodney family for 95 years.

 

In 1901 the Manchester businessman Frederick Cawley MP, later Baron Cawley, purchased the estate. In 1957 the 3rd Lord Cawley transferred it to the Treasury, which passed in on to the National Trust. Lady Crawley was allowed to remain in occupation until her death in 1978.

 

It was classified as a Grade I listed building in 1959.

  

Grade I Listed Building

 

Berrington Hall and Adjoining Outbuildings

  

A look around the hall.

 

First floor rooms had exhibitions.

  

Eye am She by Lorna J Brown

 

Discover Lorna J Brown's mixed media artwork installation which offers and artistic response to Ann Bangham's dress. Flowers symbolising motherhood and family blossom amongst large versions of the Georgian Lover's Eye Miniature, which quietly observe you as you walk through this immersive artwork.

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

SANDF Capability demonstration at the Rand Easter Show – Helicopters inserted and Parabatt Team to secure the Landing Zone then secure a casualty and extracted using the Hot Extraction method, while Rooivalk Attack Helicopter provided Top Cover

 

Photos: Lourens Badenhorst

Roche Abbey near Maltby. This view looks over Maltby Beck to the late twelfth century eastern gable of the Cistercian foundation's abbey church. The secluded site, partially landscaped by 'Capability' Brown during the 1700s, is in the care of English Heritage.

This magnificent informal landscape garden was laid out in the 18th century by 'Capability' Brown and further developed in the early years of the 20th century by its owner, Arthur G. Soames. The original four lakes form the centrepiece. There are dramatic shows of daffodils and bluebells in spring, and the rhododendrons and azaleas are spectacular in early summer. Autumn brings stunning colours from the many rare trees and shrubs, and winter walks can be enjoyed in this garden for all seasons. Visitors can now also explore South Park, 107 hectares (265 acres) of historic parkland, with stunning views.

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

The Fort Knox energy team demonstrated during an Energy Security Project ribbon-cutting ceremony Wednesday the installation’s capability to operate independently of external power sources using natural gas from beneath the post’s surface – a first for a U.S. military installation.

The project was originally conceived to address mission readiness issues experienced in 2009 when an ice storm left Fort Knox and much of Kentucky without power for several consecutive days.

The harvesting of renewable methane gas on post in recent years and the installation’s six new energy substations that include gas generators now allow Fort Knox to continue 100 percent of its operations if power from the external utility provider is cut off. The post’s 3.7 megawatts of solar arrays and 6 million square feet of building space that is heated and cooled using geothermal energy has allowed the post to reduce its dependency on using other power sources, such as gas, as well.

“We’re giving back gold to the taxpayers,” said Garrison Commander Col. T.J. Edwards. “Our (Directorate of Public Works) estimates that we will save about $8 million per year from peak shaving.”

Peak shaving des-cribes another primary purpose of the Energy Security Project – switching to Fort Knox-produced power when energy demand strains the off-post energy utility, which is also when costs to purchase energy are at its highest. Com- bined with the savings achieved through geothermal heating and cooling, Fort Knox’s annual energy utility bill is projected to be $18 million less.

“Our energy team is special,” said Edwards. “We’ve won nine conse- cutive Secretary of the Army energy awards. But we don’t sit on our laurels. We’re constantly getting after it, asking how do we get better.”

Katherine Ham-mack, the assistant secretary of the Army for Installations, Energy and Environment, addressed the criticality for installations to maintain operating capability at all times.

“Energy security underwrites our unique ability to rapidly de- ploy, employ and sustain military forces around the globe, she

said. “And it’s for that

reason the Army is moving toward building resilience into our installations.”

Fort Knox’s ability to achieve this “resilience” was credited by the secretary and garrison commander as a result of Fort Knox Director-ate of Public Works, contracting command and legal officials working to establish partnerships with third parties whose expertise is in the energy field. As an example, Edwards singled out Brandon Marcum, an engineer and Harshaw Trane subcontractor for Nolin RECC, as a central figure in creating and developing the concept that became the Energy Security Project.

“We have authorities to work with third parties, leveraging core competency, capability and funding to enable us to meet our mission,” said Hammack. “The private sector partners have stepped up to help the Army in meeting our mission requirements.”

Nolin RECC staff gave the audience of about 150 area and military leaders, Fort Knox employees and area community members an inside look at its energy security bunker through a live video stream. Attendees were told how all of the systems function to achieve energy independence and peak shave. The built-in redundancies to prevent power failure – such as an off-site energy security bunker and the multiple, secured substations – were touted as well during the demonstration.

The formal celebration of the occasion involved a unique twist. Dignitaries and Army leaders didn’t cut a ribbon, they unplugged a ribbon. The ribbon was an LED cord, and when it was unplugged in the middle, the side connected to the Fort Knox power source stayed lit, symbolizing Fort Knox’s energy independence.

“Kentucky is very proud of the efforts here,” said Dave Thompson, Kentucky Commission on Mili-tary Affairs executive director. “We see Fort Knox as a growing in- stallation with undeniable potential for the future. Job well done.”

For more information about Fort Knox’s energy initiatives, read Capt. Jo Smoke’s story in the March 26 edition of The Gold Standard, titled “The Army’s only green island: 20 years of energy investments pay off,” which can be found at bit.ly/1FY4MT5. To learn more about the Energy Security Project visit youtu.be/CxNH7m0cdfw.

 

Photo By Renee Rhodes Fort Knox Photo

 

SANDF Capability demonstration at the Rand Easter Show – Helicopters inserted and Parabatt Team to secure the Landing Zone then secure a casualty and extracted using the Hot Extraction method, while Rooivalk Attack Helicopter provided Top Cover

 

Photos: Lourens Badenhorst

1 2 ••• 48 49 51 53 54 ••• 79 80