NGA CAMPUS EAST

 

FORT BELVOIR NORTH AREA, Va. -- An aerial view of the Fairfax County Parkway (bottom center) and National Geospatial-Intelligence Agency (NGA) Campus East (top center) projects under construction here, Sept. 8, 2010. The U.S. Army Corps of Engineers Baltimore District is leading design and construction of the NGA complex, while the Virginia Department of Transportation manages the Parkway project. The NGA facility includes an eight-story main office building, technology center, visitor control center, parking garage, central utilities plant and remote inspection facility -- 2.4 million square feet in all. NGA Campus East is being constructed as part of 2005 Base Realignment and Closure programs here. (U.S. Army Corps of Engineers photo by Marc Barnes)

NGA CAMPUS EAST - NGA CHANGE OF DIRECTOR CEREMONY

 

FORT BELVOIR NORTH AREA, Va. -- Members of a Department of Defense color guard await the start of the National Geospatial-Intelligence Agency (NGA) Change of Director ceremony here Aug. 9, 2010. The ceremony was held to transfer leadership of the NGA to Letitia A. Long, who comes to NGA from the Defense Intelligence Agency (DIA), where she served as the DIA deputy director from May 2006 until July 2010. The ceremony was held on the site of NGA Campus East (NCE), a 2005 Base Realignment and Closure project which will consolidate various offices of NGA into a single campus here. Along with NGA, the U.S. Army Corps of Engineers Baltimore District is managing design and construction of the $1.7 billion project. (U.S. Army Corps of Engineers photo by Marc Barnes)

 

NOTE: This image has been released and may be used by the media. For more information on the images posted here, please contact the Belvoir Integration Office at bio.pao@usace.army.mil or by phone at (703) 806-6100.

 

To download the highest-resolution version of this image:

1. Click on the "Actions" button at the top left of the image.

2. Then choose the "View All Sizes" option on the drop-down menu.

3. When a larger version of this image appears, click on the "Original" link at the top right of the image. This will download the largest size available.

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 

NGA CAMPUS EAST

 

FORT BELVOIR NORTH AREA, Va. -- An aerial view of the Fairfax County Parkway project here Sept. 8, 2010. The Virginia Department of Transportation is managing the Parkway project. (U.S. Army Corps of Engineers photo by Marc Barnes)

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

NGA CAMPUS EAST

 

FORT BELVOIR NORTH AREA, Va. -- Edward North, a painter with Sparkle Painting Inc., paints the steel frame of the roof in the National Geospatial-Intelligence Agency Campus East facility here, July 27, 2010. The roof is covered with an Ethylene Tetrafluoroethylene, or ETFE, panel system. The U.S. Army Corps of Engineers Baltimore District is managing design and construction of the $1.7 billion project as part of 2005 Base Realignment and Closure military construction programs which are ongoing at or near Fort Belvoir. (U.S. Army Corps of Engineers photo by Marc Barnes)

NGA CAMPUS EAST

 

FORT BELVOIR NORTH AREA, Va. -- An aerial view of the National Geospatial-Intelligence Agency (NGA) Campus East remote inspection facility under construction here, Sept. 8, 2010. The U.S. Army Corps of Engineers Baltimore District is leading design and construction of the NGA complex. In addition to the remote inspection facility, complex includes an eight-story main office building, technology center, visitor control center, parking garage and central utilities plant -- 2.4 million square feet in all. NGA Campus East is being constructed as part of 2005 Base Realignment and Closure programs here. (U.S. Army Corps of Engineers photo by Marc Barnes)

NGA CAMPUS EAST - NGA CHANGE OF DIRECTOR CEREMONY

 

FORT BELVOIR NORTH AREA, Va. -- Defense Secretary Robert M. Gates bows during the opening prayer of the National Geospatial-Intelligence Agency (NGA) Change of Director ceremony here Aug. 9, 2010. The ceremony was held to transfer leadership of the NGA to Letitia A. Long, who comes to NGA from the Defense Intelligence Agency (DIA), where she served as the DIA deputy director from May 2006 until July 2010. The ceremony was held on the site of NGA Campus East (NCE), a 2005 Base Realignment and Closure project which will consolidate various offices of NGA into a single campus here. Along with NGA, the U.S. Army Corps of Engineers Baltimore District is managing design and construction of the $1.7 billion project. (U.S. Army Corps of Engineers photo by Marc Barnes)

 

NOTE: This image has been released and may be used by the media. For more information on the images posted here, please contact the Belvoir Integration Office at bio.pao@usace.army.mil or by phone at (703) 806-6100.

 

To download the highest-resolution version of this image:

1. Click on the "Actions" button at the top left of the image.

2. Then choose the "View All Sizes" option on the drop-down menu.

3. When a larger version of this image appears, click on the "Original" link at the top right of the image. This will download the largest size available.

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 

A six-story, 284-room Visitor's Quarters is under construction at Scott Air Force Base, Illinois. The 170,000 square foot facility is designed to be LEED Silver certified. (USACE photo by Hamze Fares)

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

BRAC 133

 

U.S. Army Corps of Engineers photo by Marc Barnes

 

(RELEASED) July 15, 2010 -- An exterior view of the Department of Defense Office Complex (BRAC 133) project site at Mark Center in Alexandria, Va.

 

The U.S. Army Corps of Engineers New York District is managing design and construction of the $1.08 billion facility as part of 2005 Base Realignment and Closure programs which are ongoing on and around Fort Belvoir, Va.

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

NGA CAMPUS EAST - NGA CHANGE OF DIRECTOR CEREMONY

 

FORT BELVOIR NORTH AREA, Va. -- Members of a Department of Defense color guard await the start of the National Geospatial-Intelligence Agency (NGA) Change of Director ceremony here Aug. 9, 2010. The ceremony was held to transfer leadership of the NGA to Letitia A. Long, who comes to NGA from the Defense Intelligence Agency (DIA), where she served as the DIA deputy director from May 2006 until July 2010. The ceremony was held on the site of NGA Campus East (NCE), a 2005 Base Realignment and Closure project which will consolidate various offices of NGA into a single campus here. Along with NGA, the U.S. Army Corps of Engineers Baltimore District is managing design and construction of the $1.7 billion project. (U.S. Army Corps of Engineers photo by Marc Barnes)

 

NOTE: This image has been released and may be used by the media. For more information on the images posted here, please contact the Belvoir Integration Office at bio.pao@usace.army.mil or by phone at (703) 806-6100.

 

To download the highest-resolution version of this image:

1. Click on the "Actions" button at the top left of the image.

2. Then choose the "View All Sizes" option on the drop-down menu.

3. When a larger version of this image appears, click on the "Original" link at the top right of the image. This will download the largest size available.

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

FORT BELVOIR COMMUNITY HOSPITAL

 

NOTE: This photo is a High Dynamic Range, or HDR, image. To see the standard image, see photo 101105-A-3158B-009.

 

FORT BELVOIR, Va. -- David Hirsch, a member of a Global Content Partners film crew, looks on as co-worker Mike Fitzsimmons (background) interviews Col. Andy Backus (shown in reflection) during a visit to the Fort Belvoir Community Hospital project site Nov. 5, 2010. Backus is the commander of the U.S. Army Corps of Engineers Norfolk District, which is managing design and construction of the new hospital. The crew filmed Backus on the site for an planned "Army Elite" program on the Military Channel television network. (U.S. Army Corps of Engineers photo by Marc Barnes)

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, held its annual Stakeholder Workshop Feb. 20.

 

More than 100 people from 70 agencies attended the daylong meeting on Clay Kaserne, Wiesbaden, Germany.

 

USACE photo by Lori Egan

 

NGA CAMPUS EAST - NGA CHANGE OF DIRECTOR CEREMONY

 

FORT BELVOIR NORTH AREA, Va. -- Defense Secretary Robert. M. Gates congratulates Letitia A. Long on her appointment as the National Geospatial-Intelligence Agency (NGA) director here Aug. 9, 2010. Long comes to NGA from the Defense Intelligence Agency, where she served as the deputy director from May 2006 until July 2010. The ceremony was held on the site of NGA Campus East (NCE), a 2005 Base Realignment and Closure project which will consolidate various offices of NGA into a single campus here. Along with NGA, the U.S. Army Corps of Engineers Baltimore District is managing design and construction of the $1.7 billion project. (U.S. Army Corps of Engineers photo by Marc Barnes)

 

NOTE: This image has been released and may be used by the media. For more information on the images posted here, please contact the Belvoir Integration Office at bio.pao@usace.army.mil or by phone at (703) 806-6100.

 

To download the highest-resolution version of this image:

1. Click on the "Actions" button at the top left of the image.

2. Then choose the "View All Sizes" option on the drop-down menu.

3. When a larger version of this image appears, click on the "Original" link at the top right of the image. This will download the largest size available.

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

NGA CAMPUS EAST

 

FORT BELVOIR NORTH AREA, Va. -- An aerial view of the National Geospatial-Intelligence Agency (NGA) Campus East project under construction here, Sept. 8, 2010. The U.S. Army Corps of Engineers Baltimore District is leading design and construction of the NGA complex. The facility includes an eight-story main office building, technology center, visitor control center, parking garage, central utilities plant and remote inspection facility -- 2.4 million square feet in all. NGA Campus East is being constructed as part of 2005 Base Realignment and Closure programs here. (U.S. Army Corps of Engineers photo by Marc Barnes)

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 

NGA CAMPUS EAST

 

FORT BELVOIR NORTH AREA, Va. -- An aerial view of the National Geospatial-Intelligence Agency (NGA) Campus East project under construction here, Sept. 8, 2010. The U.S. Army Corps of Engineers Baltimore District is leading design and construction of the NGA complex. The facility includes an eight-story main office building, technology center, visitor control center, parking garage, central utilities plant and remote inspection facility -- 2.4 million square feet in all. NGA Campus East is being constructed as part of 2005 Base Realignment and Closure programs here. (U.S. Army Corps of Engineers photo by Marc Barnes)

NGA CAMPUS EAST

 

FORT BELVOIR NORTH AREA, Va. -- Several contractors with Safway Inc., working in the National Geospatial-Intelligence Agency Campus East facility, disassemble scaffolding here, July 27, 2010. The scaffolding was erected to allow contractors to work safely while installing the arched roof of the building, and is disassembled one piece at a time, and then passed down the scaffolding to tethered workers positioned on each level. The U.S. Army Corps of Engineers Baltimore District is managing design and construction of the $1.7 billion project as part of 2005 Base Realignment and Closure military construction programs which are ongoing at or near Fort Belvoir. (U.S. Army Corps of Engineers photo by Marc Barnes)

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Officials with Europe District, U.S. Army Corps of Engineers, and partners celebrated the construction groundbreaking on a 21st-century elementary school for Patch Barracks in Stuttgart, Germany, March 1.

 

Representatives from Patch Elementary School and DoDEA-Europe, U.S. Army Garrison Stuttgart, the Staatliches Hochbauamt Stuttgart and contractors Peter Gross Hoch und Tiefbau and Wolff & Müller Government Services, a joint-venture partnership for the construction, and Ondra Generalplaner, the agency that designed the facility attended the event.

 

The early 115,000 square-feet school, scheduled to open for the 2021 school year, will house 550 students from prekindergarten through the fifth grade for a cost of nearly $50 million.

 

USACE photo by Lori Egan

 

Europe District, U.S. Army Corps of Engineers, in coordination with Landesbetrieb Bau and Immobilien Hessen, manages the construction of the Outdoor Recreation building for Wiesbaden Family and MWR on Clay Kaserne.

 

The main building includes a customer service area, storage area for rental equipment to include built-in ski and snowboard racks, admin offices, a maintenance shop for bicycles, skis, snowboards and other recreation equipment, and separate staff and public toilets.

 

The construction started in December 2018 and is scheduled to be complete in September 2019.

 

USACE photo by Lori Egan

 