View allAll Photos Tagged ArchitectOfTheCapitol

Work includes cleaning, waxing, repairing and conserving the existing bronze, and providing new bronze castings of missing or broken items. Initial stone work will include the cleaning and removal of patina bronze deposits from seven marble monument pedestals.

 

Full details at www.aoc.gov/grant.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Work includes cleaning, waxing, repairing and conserving the existing bronze, and providing new bronze castings of missing or broken items. Initial stone work will include the cleaning and removal of patina bronze deposits from seven marble monument pedestals.

 

Full details at www.aoc.gov/grant.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20221207_120828_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210602_125259_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Work includes cleaning, waxing, repairing and conserving the existing bronze, and providing new bronze castings of missing or broken items. Initial stone work will include the cleaning and removal of patina bronze deposits from seven marble monument pedestals.

 

Full details at www.aoc.gov/grant.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20221018_072143_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210506_111258_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210506_122046_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Tulips at the U.S. Capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20220411_075509_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20220510_120400_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20220413_112236_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210602_123948_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210506_113200_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230509_051719_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230313_061443_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20220510_114738_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20220413_112547_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's south wing.

 

Phase 4 of the Cannon Renewal Project began in January 2023 and is scheduled to be complete in December 2024. The entire south side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230216_112611_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

• Parts: 36,800+ (~1,130 unique)

 

• 📐 Scale: 1:650

 

• 📏 Dimensions: 32in x 51in (80cm x 130cm)

 

• 📚 Research, Design + Build Time: 4 months

 

• Photography: James Vitullo 📷

 

• ©️ MMXXIV - Rocco Buttliere, LLC

___________________________________

 

During a brief stint in Washington D.C. in 2023, I spent the better part of a summer evening exploring the grounds of Capitol Hill. Few landscapes invite as much inquiry along winding paths paired with plenty of moments for quiet introspection on marble benches; all in picturesque view of the Capitol dome. These on-site experiences are exactly the form of anecdotal justification I seek when considering whether to recreate such monumental places in the first place.

 

In tackling any work of such storied precedence as the US Capitol, I always seek to expand the conversation beyond existing works in the medium of plastic bricks. While the consistent 1:650 scale among my works has always ensured some level of originality, it is no guarantee of further insight that cannot already be gleaned from existing works by other artists. With this in mind, I set out to capture the full 100-acre site currently maintained by The Architect of the Capitol. What's more, the diorama depicts a particular time of year - specifically late March to early April - as illustrated by the iconic presence of hundreds of cherry blossoms rendered in two shades of light pink.

 

The diorama starts downhill at the trapezoidal Capitol Reflecting Pool, with the Grant Memorial taking pride of place along its eastern edge and the US Botanic Garden across the street to the south. The diorama expands from there, capturing the radiating pathways meandering uphill, as designed by Frederick Law Olmsted within the parcels laid out in the city plan by Pierre Charles L'Enfant. The piece culminates with the widely imitated US Capitol Building, perched atop a plinth projecting from the Capitol Visitor Center on the opposite side.

 

Topping everything off is a custom-made representation of the Statue of Freedom (as designed by Thomas Crawford), steadfastly overlooking the National Mall from atop the dome. The statue was designed in collaboration with BigKidBrix and was sized comparably to the minifigure statuette / trophy element.

 

The piece was designed over the course of about two months: first in December 2023 through January 2024, paused during the build-out of SPQR - Phase II, then resumed between March and April. The build-out lasted from July through August and was completed by September. The piece will soon be added to my personal gallery of works, now available for touring exhibitions.

 

#Artist #SupportArtists #FineArt #SmallBusiness #SmallBusinessOwner #ChicagoArtist #LEGO #LEGOArchitecture #LEGOArt #LEGOArtist #InstaLEGO #GoBricks #USCapitol #USCapitolBuilding #CapitolHill #WashingtonDC #ArchitectOfTheCapitol #America #USA #Diorama #AmericanHistory

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Brood X cicadas spotted around the U.S. Capitol Grounds.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210520_093336_KD

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230405_085808_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230109_073516_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20221207_121149_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210602_120141_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230405_085612_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210505_125715_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210505_132023_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230307_072610_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20221207_120927_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20220126_101412_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210408_133212_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

The U.S. Capitol Exterior Stone and Metal Preservation Project is a multi-phased project designed to address deferred maintenance, extend the life expectancy of the deteriorated stone and to replace missing elements of the U.S. Capitol Building.

 

Details at www.aoc.gov/stone/capitol.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20221202_073724_TH

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20221207_121129_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210506_111236_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's south wing.

 

Phase 4 of the Cannon Renewal Project began in January 2023 and is scheduled to be complete in December 2024. The entire south side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20230216_113024_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at www.aoc.gov/jobs.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20221207_120124_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20220126_100050_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210602_114909_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Brood X cicadas spotted around the U.S. Capitol Grounds.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210520_093230_KD

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210602_112443_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

Construction work continues in the Cannon House Office Building's east wing.

 

Phase 3 of the Cannon Renewal Project began in January 2021 and is scheduled to be complete in December 2022. The entire east side of the building, from the basement to the fifth floor, is closed. Work includes demolishing and rebuilding the fifth floor, conserving the exterior stonework and rehabilitating the individual office suites.

 

Full project details at www.aoc.gov/cannon.

 

-----

This official Architect of the Capitol photograph is being made available for educational, scholarly, news or personal purposes (not advertising or any other commercial use). When any of these images is used the photographic credit line should read “Architect of the Capitol.” These images may not be used in any way that would imply endorsement by the Architect of the Capitol or the United States Congress of a product, service or point of view. For more information visit www.aoc.gov/terms.

 

Reference: 20210602_113634_SG

 

JOIN OUR TEAM

Architect of the Capitol job opportunities are listed at aoc.usajobs.gov.

 

FOLLOW US

Twitter @uscapitol

Instagram @uscapitol

Facebook

1 2 ••• 10 11 13 15 16 ••• 33 34