Explore
What’s New
New!
Recent Photos
Trending
Events
The Commons
Flickr Galleries
World Map
Camera Finder
New!
Flickr Blog
Prints
The Print Shop
Prints & Wall Art
Photo Books
✨ Get Pro
Pro Plans
Stats Dashboard
Get Auto-Uploadr
Log In
Sign Up
✨ Get Pro
Log In
Explore
What’s New
New!
Camera Finder
New!
Trending
Events
The Commons
Flickr Galleries
Flickr Blog
The Print Shop
Prints & Wall Art
Photo Books
Back to albums list
Download
Share
Construction Work
read more
read less
by
ykanazawa1999
read more
read less
3150 photos
·
1.8K views
Where the Senkawa River Flows into the Nogawa River 3
One Month before Shutoko K7 Opening 6
Part of Pedestrian Deck on Meiji-dori
Parts of Pedestrian Deck and Crawler Crane on Meiji-dori
“Shibuya Stream” under Construction in 2017 July
One Month before Shutoko K7 Opening 6
Tokyo Camii in 2017 August
Parts of Pedestrian Deck and Crawler Crane on Meiji-dori 2
Construction of Shibuya Station under Pedestrian Deck and Tokyo Metro Ginza Line Track in 2017 July
Shutoko K7 at the North of JR Tracks
Close-up View of Part of Pedestrian Deck on Meiji-dori
Parts of Pedestrian Deck and Crawler Crane on Meiji-dori 2
Toei Bus in Korean Air Wrapping under Construction Site of Tokyo Metro Ginza Line Shibuya Station
Heavy Load Carrier under Parts of Pedestrian Deck
Eastern Entrance of Yokohama Kita Tunnel
Toei Buses under Construction Site of Tokyo Metro Ginza Line Shibuya Station
Side View of Part of Pedestrian Deck on Meiji-dori
Shibuya Stream in 2017 August
Eastern Entrance of Yokohama Kita Tunnel 2
Some Structure at JR Shibuya Station North Exit
Heavy Load Carrier under Parts of Pedestrian Deck
Toei Buses under Construction Site of Tokyo Metro Ginza Line Shibuya Station 2
Excavators in Dismantling Site along Ring Road No.8 in Kamata
Building under Construction beside JR Musashi-kosugi Station
Pedestrian Deck Construction Site at the Southeast of Shibuya Station
Pedestrian Deck under Construction at the Southeast of Shibuya Station
At the North of Kikuna Station
Construction Site of Outlet of Underground Flood Control Channel in 2017 July
Meiji-dori and Parts of Pedestrian Deck on It
Toyosu-ohashi in 2017 September
Pedestrian Deck under Construction and Shutoko No.3 at the South of JR Shibuya Station
Keihin-tohoku Line E233 Series Train under Shutoko K7
Pedestrian Deck under Construction at the South of JR Shibuya Station
Toei Bus and Pedestrian Deck under Construction at the South of JR Shibuya Station
Keihin-tohoku Line E233 Series Train under Shutoko K7: 2
Road along the Tsurumi River near Shin-yokohama Entrance/Exit of Shutoko K7
Shutoko No.3 and Construction Site beside JR Shibuya Station
Kanagawa Prefectural Road Route 3 near Shin-yuri-ga-oka Station
Shutoko No.3 and Construction Site beside JR Shibuya Station 3
Shutoko No.3 and Construction Site beside JR Shibuya Station 4
Space above the Shibuya River
Roof over Tomei Junction Construction Site
Tomei Junction Construction Site
Odakyu 1000 Series Train Arriving at Yoyogi-hachiman Station 8
Odakyu 1000 Series Train Arriving at Yoyogi-hachiman Station 9
Tomei Junction/Interchange Construction Site at the Right Bank of the Nogawa River
Odakyu 1000 Series Train Leaving Yoyogi-hachiman Station
Tomei Junction/Interchange Construction Site at the Left Bank of the Nogawa River
Yoyogi-hachiman Station in 2017 May
Construction Work at the North of Kawasaki Station in 2017 May
Odakyu 2000 Series Train Arriving at Yoyogi-hachiman Station
Odakyu 2000 Series Train Arriving at Yoyogi-hachiman Station 2
Construction Work at the North of Kawasaki Station in 2017 May: 2
Construction Site of Olympic Village in Harumi in 2017 September
Odakyu 2000 Series Train Leaving Yoyogi-hachiman Station
Bridge in Tomei Junction Construction Site
Odakyu 2000 Series Train Leaving Yoyogi-hachiman Station 2
Kohoku Junction/Interchange in 2017 May: 2
Construction Work at the North of Kawasaki Station in 2017 May: 3
Tomei Junction Construction Site along the Nogawa River
Kohoku Junction/Interchange in 2017 May: 3
Construction Work at the North of Kawasaki Station in 2017 May: 4
At the Northwestern End of Harumi-ohashi
Odakyu 4000 Series Train Going through Yoyogi-hachiman Station 3
Odakyu 4000 Series Train Going through Yoyogi-hachiman Station 4
Odakyu 4000 Series Train Going through Yoyogi-hachiman Station 5
At the Northwestern End of Harumi-ohashi 2
At the Northwestern End of Harumi-ohashi 3
Shinkansen N700 Series Train and Hotel Building under Construction in Musashi-kosugi
At the Middle of Harumi-ohashi
Kohoku Junction/Interchange in 2017 May: 4
Shinkansen N700 Series Train and Hotel Building under Construction in Musashi-kosugi 2
Odakyu Romancecar VSE Passing Yoyogi-hachiman Station 2
Odakyu Romancecar VSE Passing Yoyogi-hachiman Station 3
Kohoku Junction/Interchange in 2017 May: 5
At the Middle of Harumi-ohashi 4
At the Middle of Harumi-ohashi 5
Shinkansen N700 Series Train and Hotel Building under Construction in Musashi-kosugi 3
Kohoku Junction/Interchange in 2017 May: 6
At the Middle of Harumi-ohashi 6
Dismantlement of Indoor Riding Arena in Equestrian Park
View at the Eastern End of Tokyu Juyu-ga-oka Station in 2017 October
Construction Work at Western Side of North Exit of Kawasaki Station in 2017 May
Re-construction Site of Shopping Street in Front of Musashi-koyama Station
Kappa-shaped Barricades in Front of Old Kohoku Interchange
Dismantlement of Indoor Riding Arena in Equestrian Park in 2017 December
Construction Site of New Station at the North of Shinagawa Station
Odakyu 8000 Series Train at Railroad Crossing under Ring Road No.6 Overpass
Dismantlement of Indoor Riding Arena in Equestrian Park in 2017 December: 2
Dismantlement of Indoor Riding Arena in Equestrian Park in 2017 December: 3
Shinkansen N700 Series Train and Hotel Building under Construction in Musashi-kosugi 4
Restored Electirc Power Pole in Sakura-josui
Dismantlement of Indoor Riding Arena in Equestrian Park in 2017 December: 4
Shinkansen N700 Series Train and Hotel Building under Construction in Musashi-kosugi 4
Route 246 and Shutoko No.3 at the West of Shibuya Station in 2017 December: 2
Route 246 and Shutoko No.3 at the West of Shibuya Station in 2017 December: 3
Old Railroad Crossing at the Southwest of Yoyogi-hachiman Station
West Entrance of the Low-ceilinged Tunnel at the North of Shinagawa in 2018 February
Shibuya Re-development Site in 2017 December
Naka-no-hashi Intersection in 2018 January
1
2
•••
12
13
14
15
16
17
18
•••
31
32