Back to photostream

July 11, 2013 - Pontoon T is prepared for post-tensioning work

In order to complete the final step of the repair process, crews must drill holes into the sides of the pontoon. Post-tension cables will be inserted thorough these holes and stretched tight to add strength to the concrete. Concrete "blisters" are then used to cover the ends of the cables.

5,633 views
1 fave
0 comments
Uploaded on August 23, 2013
Taken on July 11, 2013