May 15, 2013 - Pontoon T enters the Ballard Locks
A 360-foot-long concrete pontoon for the new SR 520 floating bridge was transported through the Hiram M. Chittenden Locks on May 15, 2013.
5,837
views
7
faves
0
comments
Uploaded on May 16, 2013
Taken on May 15, 2013
May 15, 2013 - Pontoon T enters the Ballard Locks
A 360-foot-long concrete pontoon for the new SR 520 floating bridge was transported through the Hiram M. Chittenden Locks on May 15, 2013.
5,837
views
7
faves
0
comments
Uploaded on May 16, 2013
Taken on May 15, 2013