Back to photostream

Connecting the T-pontoon

A specially designed T-pontoon is connected to the pair of pontoons. It is then filled with air to increase buoyancy and help float the pontoons out of the basin.

 

In July 2012, the SR 520 Floating Bridge and Landings Project floated out the first set of pontoons for the floating bridge replacement.

3,637 views
2 faves
0 comments
Uploaded on July 24, 2012
Taken on July 23, 2012