A helping hand
The skiff works in tandem with the powerful tug boats to carefully navigate the pontoons out of the basin and into the Blair Waterway.
In July 2012, the SR 520 Floating Bridge and Landings Project floated out the first set of pontoons for the floating bridge replacement.
2,954
views
1
fave
0
comments
Uploaded on July 24, 2012
Taken on July 23, 2012
A helping hand
The skiff works in tandem with the powerful tug boats to carefully navigate the pontoons out of the basin and into the Blair Waterway.
In July 2012, the SR 520 Floating Bridge and Landings Project floated out the first set of pontoons for the floating bridge replacement.
2,954
views
1
fave
0
comments
Uploaded on July 24, 2012
Taken on July 23, 2012