Back to photostream

Precast concrete panel lowered above SR 520

Major progress was made to the new lidded overpass above SR 520 at Evergreen Point Road. In this photo, a worker helps guide a concrete panel into place. The panels will serve as the floorboards of the new lidded overpass and solid concrete deck will be poured on top of them. Photo taken during the full weekend closure of SR 520 from July 13 - 16, 2012.

2,112 views
2 faves
0 comments
Uploaded on July 15, 2012
Taken on June 15, 2012