Back to photostream

Installing conduits

Construction crews install conduits and backfill the trench on the back of the precast barrier on Sept. 13, 2017 in Renton. This work is part of the I-405/SR 167 Interchange Direct Connector Project.

3,865 views
4 faves
0 comments
Uploaded on September 14, 2017
Taken on September 13, 2017