Back to photostream

Rail -- 2015 Landslide Mitigation mp 25.9 after

A modular catchment wall was added along this rail line and bluff near Mukilteo at milepost 25.9. The wall keeps landslide debris from reaching the tracks and be cleaned out by a machine that runs along the rail lines.

2,757 views
3 faves
0 comments
Uploaded on February 4, 2016
Taken on November 4, 2015