Rail -- 2015 Landslide Mitigation mp 1784.5 after
The modular catchment wall added along the rail line near Everett helps catch landslide debris and keep it from reaching the tracks. When the catchment area is full, a machine that runs along the tracks can clean it out. Because of the modular design, sections of the concrete wall also can be replaced if damaged.
3,550
views
10
faves
0
comments
Uploaded on February 4, 2016
Taken on November 4, 2015
Rail -- 2015 Landslide Mitigation mp 1784.5 after
The modular catchment wall added along the rail line near Everett helps catch landslide debris and keep it from reaching the tracks. When the catchment area is full, a machine that runs along the tracks can clean it out. Because of the modular design, sections of the concrete wall also can be replaced if damaged.
3,550
views
10
faves
0
comments
Uploaded on February 4, 2016
Taken on November 4, 2015