ISC 3 rendering
Architectural rendering of Phase 3 of William & Mary's Integrated Science Center shows it filling the triangular space created by ISC 1 (to the right) and ISC 2 (above). The project also includes a new greenhouse atop ISC 2. The rounded structure on the left is a 300-seat lecture hall. Construction on ISC 3 began in 2014.
3,315
views
0
faves
0
comments
Uploaded on October 28, 2013
Taken on October 28, 2013
ISC 3 rendering
Architectural rendering of Phase 3 of William & Mary's Integrated Science Center shows it filling the triangular space created by ISC 1 (to the right) and ISC 2 (above). The project also includes a new greenhouse atop ISC 2. The rounded structure on the left is a 300-seat lecture hall. Construction on ISC 3 began in 2014.
3,315
views
0
faves
0
comments
Uploaded on October 28, 2013
Taken on October 28, 2013